IR 05000414/1985008

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-414/85-08.Confirms 850604 Telcon W/K Louvin That Util Surveys May Be More in-depth than Audit & Therefore Meet QA Audit Requirements
ML20128H664
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 06/13/1985
From: Walker R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Tucker H
DUKE POWER CO.
References
NUDOCS 8507100144
Download: ML20128H664 (1)


Text

, _ _

YCllOU June 130 1985

.

Duke Power Company ATTN: Mr. H. B. Tucker, Vice President Nuclear Production Department 422 South Church Street Charlotte, NC 28242 Gentlemen:

SUBJECT: REPORT N0. 50-414/85-08 Thank you for your response of May 25, 1985, to our Notice of Violation issued on April 25, 1985, concerning activities conducted at your corporate office related to the Catawba faci'ity under NRC Construction Permit No. CPPR-11 Confirming our telephone conversation with Mr. K. Louvin of your staff on June 4, 1985, we understand that the term " surveyed" in your response means a survey performed by Duke Power Company which may be more in-depth than an audit and, therefore, meets all quality assurance audit requirements. Based on this understanding, we have evaluated your response and found that it meets the requirements of 10 CFR 2.20 We will examine the implementation of your corrective actions during future inspection We appreciate your cooperation in this matte

Sincerely,

'

(Original Signed by VLBrownlee)

Roger D. Walker, Director Division of Reactor Projects cc: R. L. Dick, Vice President -

Construction J. W. Hampton, Station Manager bec: G. Johnson, ELD K. N. Jabbour, NRR l

l

,

RII RII RII RI RII RII saLHJackson w &- segt CUprig sa%

Mibdon PB s

HCDance o

VBfownlee 6/g/85 6/// /85 6/gv/85 6/l-!/85 6 / 11 / 8 5 6/n /85 850710o144 850613 gDR ADOCK 05000414 PDR (b

_r#o /