IR 05000413/2024401

From kanterella
Jump to navigation Jump to search
Security Baseline Inspection Report 05000413/2024401, 05000414/2024401
ML24332A071
Person / Time
Site: Catawba  
Issue date: 11/27/2024
From: Jannette Worosilo
NRC/RGN-II/DFRSS
To: Wylie E
Duke Energy Carolinas
References
IR 2024401
Download: ML24332A071 (5)


Text

SUBJECT:

CATAWBA NUCLEAR STATION, UNITS 1&2 - SECURITY BASELINE INSPECTION REPORT 05000413/2024401 AND 05000414/2024401

Dear Ernest J. Wylie:

On November 21, 2024, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Catawba Nuclear Station, Units 1&2 and discussed the results of this inspection with you and other members of your staff. The results of this inspection are documented in the enclosed report.

No findings or violations of more than minor significance were identified during this inspection.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely, Jannette G. Worosilo, Chief Nuclear Security Branch Division of Fuels, Radiological Safety, and Security Docket Nos. 05000413 and 05000414 License Nos. NPF-35 and NPF-52

Enclosure:

As stated

Inspection Report

Docket Numbers:

05000413 and 05000414

License Numbers:

NPF-35 and NPF-52

Report Numbers:

05000413/2024401 and 05000414/2024401

Enterprise Identifier:

I-2024-401-0059

Licensee:

Duke Energy Carolinas, LLC.

Facility:

Catawba Nuclear Station, Units 1&2

Location:

York, SC

Inspection Dates:

November 18, 2024, to November 21, 2024

Inspectors:

D. Egelstad, Physical Security Inspector

J. Justice, Senior Physical Security Inspector

Approved By:

Jannette G. Worosilo, Chief

Nuclear Security Branch

Division of Fuels, Radiological Safety and Security

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a security baseline inspection at Catawba Nuclear Station, Units 1&2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

List of Findings and Violations

No findings or violations of more than minor significance were identified.

Additional Tracking Items

None.

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Currently approved IPs with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.02 - Access Control

The inspectors evaluated the access control program through completion of the following

inspection elements: Access Control

(1)

  • Tier I: All Requirements
  • Tier II: 02.06(a-d), 02.08(a,c,e,h,i)
  • Tier III: 02.10(a)

71130.09 - Security Plan Changes

The inspectors evaluated the security plan changes through completion of the following procedure elements:

Security Plan Changes (1 Partial)

(1)

(Partial)

The opportunity to apply this procedure was not available in accordance with IMC 0306. This sample was not available because the licensee did not conduct the activity covered by this IP. Specifically, the licensee has not initiated a physical security plan change in accordance with 10 CFR 50.54(p(2) since the last performance of this IP.

OTHER ACTIVITIES - BASELINE

71151 - Performance Indicator Verification The inspectors verified licensee performance indicators submittals listed below:

PP01: Protected Area Security Equipment Performance Index Sample (IP Section 02.17) (1 Sample)

(1) September 2023 - October

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

The inspectors verified no proprietary information was retained or documented in this report.

  • On November 21, 2024, the inspectors presented the security baseline inspection results to Ernest J. Wylie and other members of the licensee staff.

DOCUMENTS REVIEWED

Inspection

Procedure

Type

Designation

Description or Title

Revision or

Date

Corrective Action

Documents

2495785

2501984

2508679

2509029

2510872

2514410

2518388

2531477

2502629

Catawba Nuclear Station Physical Security Plan

Rev 30

AD-SY-ALL-0210

Site Access Controls

Rev 9

AD-SY-ALL-0215

Security Search and Entry Processing

Rev 14

AD-SY-ALL-0240

Security Key and Lock Controls

Rev 3

AD-SY-ALL-0301

Nuclear Worker Unescorted Access Authorization Program

Rev 10

AD-SY-ALL-0310

Access Authorization Processing

Rev 10

AD-SY-CNS-0205

SOCA - EWAS Operations and Additional Measures

Rev 7

AD-SY-CNS-0260

CNS Security Compensatory Measures

Rev 6

CSD-SY-CNS-

240-01

CNS Security Lock and Key Program

Rev 2

CSD-SY-CNS-

251-01

CNS Security Emergency Access Control

Rev 1

Procedures

CSD-SY-CNS-

260-01

CNS Security Bar Code Scanning System

Rev 2

2493750-05

Self Assessment - AC, PSP, PI

08/31/2024

71130.02

Self-Assessments

24-CNS-SEC-

PR-01

Nuclear Oversight - Performance Review, Catawba Physical

Security

01/17/2024

AD-PI-ALL-0700

Performance Indicators

Rev 6

71151

Procedures

AD-SY-ALL-0150

Reporting Safeguards, Security, and Fitness for Duty Events

Rev 8