Text
., -. - -
. - - ~ ~
~...
.
. -...
...
.
_-.....
. _ _. -
-
Mo UNITED STATES
ug'o'
y.
NUct. EAR REGULATORY COMMISSION
,
[
pn REGloN il
$
/,j 11.1 MARIETT A STRE ET. N.W.
- Al LANTA, GEORGI A 30323
,
a s% J /
VPN 1131%
Report Nos.:
50-413/94-08 and 50-414/94-08 Licensee:
Duke Power Company 422 South Church Street Charlotte, NC 28242 Docket Nos.:
50-413 and 50-414 License Nos.:
NPF-35 and NPF-52 Facility Name: Catawba 1 and 2 Inspection Conducted:
February 28-March 3, 1994 Inspector:
M j 'd hh,/-
/
/59 Y
'
.TM. Sartor, Jr., Team L.gatier Date Sidned W
Accompanying Personnel K. Clark, Rll E. Fox (NRR)
-
'
i Approved by:
,e K.P.'Barr,Chiff Date Signed
,
Emergency Preparedness Section Radiological Protection and Emergency Preparedness Branch Division of Radiation Safety and Safeguards SUMMARY Scope:
This routine, announced inspection was the observation and evaluation of licensee's 1994 Annual Emergency Preparedness Exercise.
The inspection was conducted to assess the adequacy of the licensee's emergency response program, the implementation of the emergency plan and procedures, and the training program for emergency response.
This exercise was a full participation exercise for York, Gaston, and Mecklenburg Counties as well as the States of North and South Carolina.
The offsite portion of this~ exercise was evaluated by the Federal Emergency Management Agency.
Results In the areas inspected, violations or deviations were not identified. The exercise was fully satisfactory.
Exercise strengths included the licensee's timely staffing of its emergency response facilities, emergency classifications and notifications, and accident mitigation.
9405230100 940410 PDR ADOCK 05000413 a
.
e
'-->v-er e
P
.y v
a u-r
- tiW
==* 14
--
A f*
"'f-
'9 5*w-
'
-.-
--
..
..
-
.
-.- -.
.. -
.
.
.-
.
,
REPORT DETAILS 1.
Persons Contacted Licensee Employees
- D. Baysinger, Radiation Protection Supervisor
- M. Cloninger, Controller, EOF
- M. Greene, Communications Specialist
- B. Hasty, Emergency Planning Manager, McGuire Nuclear Station
- T. Harrall, EOF Director
- J. Isaacson, Supervisor, Radiation Protection
- S. Ledford, Emergency Planner
- W. McCollum, Station Manager
- G. Mitchell, Emergency Planner
- P. McNamara, Manager, Emergency Planning
- T. Pasour, Administrative Specialist
- M. Patrick, Manager, Safety Assessment
- D. Rehn, Vice President, Catawba Nuclear Station
- J. Twiggs, General Supervisor, Radiation Protection
'
Other licensee employees contacted during this inspection included craftsmen, engineers, operators, mechanics, security force members, technicians, and administrative personnel.
Nuclear Regulatory Commission
- P. Hopkins, Resident Inspector
- Attended exit interview An index of abbreviations used in this report can be found in the last paragraph.
2.
Exercise Scenario (82302)
The scenario for the emergency exercise was reviewed to determine whether provisions had been made to test the integrated emergency response capability and a major portion of the basic elements within the licensee's Emergency Plan, as required by 10 CFR 50.47(b)(14) and Section IV. of Appendix E to 10 CFR-Part 50.
The scenario for this full participation exercise was reviewed in advance of the scheduled exercise date and discussed with licensee representatives prior to the exercise. The exercise scenario.was well organized and of sufficient detail for the licensee's emergency response organization to demonstrate the_ exercise objectives. The scenario provided sufficient emergency information to the State and local government agencies for their full participation in the exercise.
No violations or deviations were identified.
-
-
.
-
.
.
.
-
-
.
_
_._
._
_.
_
_
_
_ _ _ _ _
.__ _.
_
__
_
.
3.
Onsite Emergency Organization (82301)
The licensee's organization was observed during the exercise to determine whether the requirements of Paragraph IV.A of Appendix E to 10 CFR Part 50 (as addressed in the Emergency Plan) were implemented with respect to descriptions, responsibilities, and assignment of the onsite emergency response organization.
The inspector determined that the initial onsite emergency organization was adequately defined and the primary and alternate assignments for the positions in the augmented emergency organization were clearly designated.
During the exercise, the inspector observed that staff was
"
available to fill key functional positions within the initial onsite emergency organization.
No violations or deviations were identified.
4.
Emergency Response Support and Resources (82301)
,
This area was observed to determine whether arrangements for requesting and effectively using assistance resources were made, whether arrangements to accommodate State and local personnel at the EOF were
!
adequate, and whether other organizations capable of augmenting the planned response were identified as specified by 10 CFR 50.47(b)(3),
Paragraph IV.A of Appendix E to 10 CFR Part 50, and guidance promulgated in Section II.C of NUREG-0654 (Revision 1).
An inspector noted that the licensee's Emergency Plan and procedures identified other organizations capable of augmenting the planned response.
One capability was demonstrated with the participation by the South Carolina Law Enforcement Division responding and using its Bomb Robot to retrieve the simulated bomb in the protected area.
The inspector also observed that personnel from the States of North and South Carolina were accommodated in the E0F.
No violations or deviations were identified.
5.
Emergency Classification System (82301)
This area was observed to verify that a standard emergency.
.
classification and action level scheme was in use by the licensee as
!
required by 10 CFR 50.47(b)(4) and Paragraph IV.C of Appendix E to 10 CFR Part 50, and to determine whether that scheme was adequately implemented.
The licensee effectively used their procedure RP/0/A/5000/01,
" Classification of Emergency", to classify each emergency condition and to escalate to more severe classifications as the simulated accident progressed.
The licensee's classifications and emergency declarations were appropriate throughout the exercise.
No violations or deviations were identified.
-
.
.
--
-
-
.
_. -.
-.
-
_
. -
. -.
-
.
.
6.
Notification Methods and Procedures (82301)
This area was observed to determine that procedures had been established for notification by the licensee of State and local response organizations and emergency personnel, and the content of initial and followup messages to response organizations had been established; and a i
means to provide early notification to the population within the plume exposure pathway had been established as required by 10 CFR 50.47(b)(5),
10 CFR 50, Appendix E, Paragraph IV.D, and the specific criteria in
,
The inspector reviewed the licensee's procedures (RP/0/A/5000/06,
" Notification to States and Counties"; and RP/0/A/5000/13, "NRC Notification Requirements"), for providing emergency information to Federal, State, and local response organizations.
The inspector noted that implementing procedures for notifications had been established and were adequate to provide guidance to personnel responsible for initial notification to the State, local, and Federal authorities. During the
'
exertise, the notifications to the offsite authorities were well formulated, properly approved, and provided the information within required time restraints.
i 7.
Emergency Communications (82301)
l This area was observed to verify that provisions existed for prompt
,
communications among principal response organizations and emergency
personnel as required by 10 CFR 50.47(b)(6), 10 CFR 50, Appendix E, Paragraph IV.E, and the specific criteria in NUREG-0654,Section II.F.
The inspector observed that communications among the licensee's emergency response facilities and emergency organization and between the licensee's emergency response organization and offsite authorities were good.
8.
Public Education and Information (82301)
This area was observed to determine whether information concerning the simulated emergency was made available for dissemination to the j
public as required by 10 CFR 50.47(b)(7), 10 CFR 50,-Appendix E, Paragraph IV.0, and specific criteria in NUREG-0654,Section II.G.
Information was provided to the media and the public in advance of the exercise.
The licensee activated a Joint Information Center in the Electric Center in Charlotte following the Alert classification.
News media personnel coordinated effectively in the JIC to provide news releases, press briefings, and implement rumor control.
The inspector noted that information provided in the news releases and media briefings was accurate, but some aspects could have been more timely.
For example, although the JIC was activated at 9:20 a.m., the first media c
briefing was not conducted until 11:10 a.m.
The inspector also noted j
that the rumor control function was well coordinated amongst the
'
,
u
_
... _ -.
.-
,.
.
_
, _ _,
-
.
. _. _ -
-
- - - - -
. -
..
.
.
..-
-
.
representatives (Duke Power Company, States of North and South Carolina, and the affected counties),
)
No violations or deviations were identified.
9.
Emergency Facility and Equipment (82301)
This area was observed to determine whether adequate emergency facilities and equipment to support an emergency response were provided and maintained as required by 10 CFR 50.47(b)(8), 10 CFR 50, Appendix E, Paragraph IV.E, and the specific criteria in NilREG-0654,Section II.H.
The inspector observed activation, staffing, and-operation of the emergency response facilities to include the Simulator Control Room (SCR), TSC, OSC, and the E0F.
In all cases, the facility and its
'
dedicated equipment facilitated the emergency response.
Simulaf.or Control Room Ihe SCR was adequately equipped to support the emergency response.
a Procedures were effectively used to classify the emergency and nake required notifications.
Technicti Support Center
The TSC was declared operational 41 minutes after the Alert
-
classification. The facility and it equipment were effectively used by the Emergency Coordinator.to receive his turnover briefing, to keep the TSC staff. informed, and to provide emergency information to the OSC and EOF.
i Operational Support Center The OSC was promptly staffed and information transferred from the a
TSC was very good as a result of the video conferencing system
. that had been incorporated between the facilities.
Emergency Operations facility Observations of EOF activities during the exercise' reflected a
-
facility with the necessary equipment to support emergency response.
Communications with the site were effective for making informed emergency management decisions from the EOF and the interface with State and local authorities was effective.
No violations or deviations were identified.
,
e l y Ty--
r
-
A irw-m
-
t m -
....
-
--.
- - - -
_
.
-
-..
-,
.
.
10.
Accident Assessment (82301)
This area was observed to assure that methods, systems, and equipment for assessing and monitoring actual or potential offsite consequences of a radiological emergency conditions were in use as required by 10 CFR 50.47(b)(9), 10 CFR 50, Appendix E, Paragraph IV.B, and the specific criteria in NUREG-0654, Section 11.1.
The accident assessment reviewed by the inspector included an engineering assessment of plant status and an assessment of radiological hazards to both onsite and offsite personnel resulting from the simulated accident. The licensee was effective in the identification and mitigation of the release path and the dose assessment team in the E0F was able to provide dose projections and source term estimates for the accident sequence.
No violations or deviations were identified.
11.
Protective Responses (82301)
This area was observed to verify that guidelines for protective actions during the emergency, consistent with Federal guidance, were developed and in place, and protective action for emergency workers, including evacuation of nonessential personnel were implemented promptly as required by 10 CFR 50.47(b)(10), and the specific criteria in NUREG-0654,Section II.J.
The inspector verified that the licensee had emergency procedures for formulating protective action recommendations (PARS) for the offsite populace within the 10-mile EPZ. The PARS were quickly formulated and promptly provided to the State and local authorities with the General Emergency notification message.
The inspector also observed that protective actions were instituted for onsite emergency responders which included periodic radiation surveys in the ERFs, and continued accountability of emergency response personnel.
No violations or deviations were identified.
12.
Exercise Critique (82301)
The licensee's critique of the emergency exercise was observed to determine whether.the deficiencies identified as a result of the exercise, and the weaknesses noted in the licensee's emergency' response organization were formally presented to licensee management for corrective actions as required by.10 CFR 50.47(b)(14), 10 CFR 50, Appendix E, Paragraph IV.F, and specific criteria in.NUREG-0654,Section II.N.
The licensee conducted player critiques in the ERFs immediately following the exercise. On March 2, 1994, the licensee also conducted evaluator / controller critiques prior to the formal presentation to
- -. -
. -
.
-
--
- _ - _ _ _ _ _ _ - _ _ _ -
.
.
facility management on tk following day.
The licensee's critique to their management on Mar.., 3 was comprehensive and addressed 31 Action Items for further evaluation.
No violations or deviations were identified.
13.
Action on Previous Inspection Findings (92701)
a.
(Closed) Exercise Weakness (EW) 50-413,414/93-15-01:
Failure to-properly classify events in accordance with the licensee's emergency response procedures.
The licensee properly classified the simulated events during this exercise.
b.
(Closed) IFI 50-413, 414/93-15-02:
Review licensee procedures for determining protective action recommendations to ensure procedures do not contain conflicting guidance.
The licensee's revised procedures for determining protective action recommendations were reviewed and conflicting guidance was not identified.
14.
Exit Interview The inspection scope and results were summarized on March 3, 1994, with those persons indicated in Paragraph 1.
The inspector described the areas inspected and discussed in detail the inspection results Proprietary information is not contained in this report.. Dissenting comments were not received from the licensee.
Item No.
Status Description and Reference 50-413, 414/93-15-01 Closed EW - Failure to properly classify events (Paragraph 13).
50-413, 414/93-15-02 Closed IFI - Review licensee procedures for determining PARS (Paragraph 13).
15.
Federal Evaluation Team Report The report by the Federal Evaluation Team (Regional Assistance Committee and Federal Emergency Management Agency, Region IV staff) concerning the activities of offsite agencies during the exercise will be forwarded by separate correspondence.
16.
Index of Abbreviations Used in This Report CFR Code of Federal Regulations
-
C0F Emergency Operations Facility EPZ Emergency Planning Zone ERF Emergency Response Facility ERO Emergency Response Organization EW Exercise Weakness FEMA Federal Emergency Management Agency JIC Joint Information Center
'j
--
.
- - _. - _. _ _..
- -. -... - - - - - - - -.... -. -..
.
)-
.
I i
l
!
NRC Nuclear Regulatory Commission
05C Operations Support Center
!
PAR Protective Action Recommendation
!
RP Radiation Protection i
SCR Simulator Control Room l-TSC Technical Support Center
!
i l '-
Attachment:
!
Exercise Scope and Objectives
!-
and Event Sequence l-
!
i a
i ll t
.
l
!.
!
)
i
!
i i
s.
.
!
,
i i
.
,
'
.
!-
!
i
'
_ _ _ _,. - - - -.. _. - -
- - - -....
.. - - -, - -.... -.. - -...
-
-.. - - -
- -..
.. -..
-...
... -...~.
- _....
.
.-.
-.. -
.
.
.
-..
......
.
.
-.
.
,
7 RP Radiation Protection SCR Simulator Control Room
-Attachment:
Exercise Scope and Objectives and Event Sequence
..
,
i i
.i l
'
.
)
l
'
..
.
..
-
.
.
-_
!
'
.
CATAWBA NUCLEAR STATION I.
SCOPE AND OBJECTIVES
A.
Scorse The 1994 Catawba Nuclear Station annual exercise is designed to meet the exercise requirements of 10CFR50, Appendix E, Section IV.F. The exercise will be conducted March 1,1994, from 0800 to 1400.
This exercise will involve participation of Catawba Nuclear Station emergency response personnel and wtll include the activation of the Emergency Operations Facility (EOF).
York, Gaston, and Mecklenburg Counties will be fully participating in the March 1,1994, Exercise. The States of North and South Carolina will also be fully partcipatmg.
The Annual Medical Drill w;"
art of the Annual Exercise.
A ictmal critique including Duke Power and NRC will be held on March 3,1994, at 2:00 p.ni. ?t Catawba Nuclear Station. This critique will be closed to the public.
B.
Exercise Obiectives (Duke Power Company Emergency Organization)
Emergency Management 1.
Demonstrate the ability to declare emergency classification in accordance with procedures.
2.
Demonstrate the abtiity to notify the Statt uties within fifteen minutes after declaring an emergency or
,ing the emergency classification.
3.
Demonstrate proper use of the message format and authentication methodology for messages transmitted to States and Counties.
Demonstrate the ability to alert, notify, and staff the TSC, OSC and EOF facilities after declaring an Alert or higher emergency class.
5.
Demonstrate precise and clear transfer of responsibility from the 5br Supervisor in the Control Room to the Emergency Coordinator in &
>
TSC.
6.
Demonstrate the ability to notify NRC not later than one hour after declaring one of the emergency classe..
.
._
_..
._
_.
.
_.
_
_
!
l
Catawba Nuclear Station Page Two 7.
Demonstrate assembly of station personnel within 30 minutes in a simulated emergency and provide accountability for any not present at the assembly locations.
8.
Demonstrate access control measures to the plant site, EOF, JIC and Media Center.
9.
Test commumcations equipment among on-site emergency facilities including plant extensions and intercoms.
10.
Test off-site communications equipment to the County and State warnmg points, County and State emergency operations centers and to NRC including the Selective Signaling System and the NRC Emergency Notification System.
,
11.
Test the adequacy and operability of emergency equipment / supplies.
12.
Evaluate the adequacy of the following assessment tools, as applicable:
1.
Drawings 2.
Data Display 3.
Maps 13.
Demonstrate precise and clear transfer of responsibility from the Emergency Coordinator in the TSC to the Emergency Operations Facility Director.
14.
Demonstrate the ability to provide accurate information to the news media in a timely manner and to provide effective rumor control according to procedures.
15.
Demonstrate the ability to coordinate information with State and County Public Information Officers prior to its release.
,
Accident Assessment 16.
Demonstrate the ability to transmit data using the Emergency Operations Facility Data Transmittal System in accordance with procedures and to distribute this data throughout the EOF.
.
17.
Demonstrate the ability to provide data to the TSC and OSC in accordance with station procedure.
_
-
.
.
.
Catawba Nuclear Station Page Three 18.
Demonstrate the ability to locate a simulated, radioactive plume and to measure the off site radiation levels.
19.
Demonstrate adequate radio communications between the off-site monitoring teams and the TSC/ EOF.
20.
Demonstrate the ability to develop off-site dose projections in accordance with procedures.
21.
Demonstrate the ability to collect soil, water and vegetation samples in accordance with procedures.
22.
Demonstrate the ability to continuously monitor and control emergency
,
worker exposure.
i
,
23.
Demonstrate the ability to determme on-site radiation levels and airborne radiciodine concentrations.
Protective Action Recommendations 24.
Demonstrate the ability to provide timely and appropriate protective action recommendations to off-site officials in accordance with station procedures.
Plant Operations 25.
Demonstrate the ability to assess the incident and provide mitigation strategies.
Medical Drill 26.
Demonstrate proper response to a simulated medical emergency involving a contaminated patient in accordance with station procedures.
Other 27.
Demonstrate resolution of previous exercise findings (weaknesses, deficiencies) identified by evaluators, QA, or NRC, as applicable.
,
w
,
w
.
.- --.
- -
....
..
.
Schedule of Events p2Le Tirne Place Eunt/Anendance Recutred 02:14 94 1300-1600 CNS Meettng Building Controller Training /
All Controllers / Evaluators 02/28.94 1330 CNS - Admin.127 NRC Entrance
02'28/94 1400 CNS - Admin.127 NRC Team Brienng! Selected Scenario Team Members 03,01/94 0700-0730 CNS TSC Pre-Exercise Briefing! -
Station Controllers 03/01/94 0700-0730 EOF (PB 1237)
Pre-Exercise Briefing / EOF &
News Group Controllers 03/01/94 0800-1400 CNS and EOF Exercise 03/01/94 1400-1600 CNS and EOF Player Critique /
All Controllers 03/01/94 1600-1730 EOF (PB-1237)
Working Controller Critique'
EOF Controllers *
03/01/94 1600-1730 CNS TSC Working Controller Critique /-
Station Controllers" 03/02/94 1500 CNS - 153A & B Formal Controller Critique /
All Controllers 03/03/94 1400 CNS - 153A NRC Critique /
Selected Controllers" Time fram: will be adjusted according to length of player critique and controller needs.
- Controllers that will need to attend the NRC Critique will be determined at the 1500
"
Controller Critique on 3/02/94.
,
b c
,
n
,
-
_....._-
.
I
..
CATAWBA NUCL. EAR STATION ANNUAL EXERCISE SCENARIO MARCil 1.1994 NARRATIVE This exercise will be a full station drill with the Simulator Control Room, Technical Support Center (TSC), Operations Support Center (OSC), and the Emergency Operations Facility (EOF) manned with players and evaluators. The News Center and Joint Information Center will be manned because the
!
States (North Carolina and South Carolina) and Counties (York, Gaston, Mecklenburg) are playing in this exercise.
The exercise will begin with the initial conditions of 20 gpd "D" SG tube leak. (Having this defect in
"D" SG makes the tube rupture later more realistic). Also at the start of the exercise, two valve crew members are working on the repair of valve NV241.
A contaminated nadical injury occurs as a result of the work on NV241 in lower containment (set up outside containment lower hatch). The individual will be transported to PMC as contaminated (simulated) and they will play by setting up the emergency room as required to treat a contaminated patient.
.
The States have dictated when they need each classification to occur, thus the following plant casualties were used to accomplish their needs:
An Alert is declared when a bomb is found inside the Protected Area. SLED (SC Law Enforcement Division) will be called in to actually play in the exercise. They will bring their Bomb Robot to retrieve the first device.
A Site Area Emercency will be declared when a second (unknown by players) device detonates in the outside doghouse on the main steam line "D" just upstream of MSIV. The hole in "D" main steam line causes "D" S/G to rapidly depressurize. The large suddenA P across "D" S!G tubes (primary pressure to secondary pressure of zero) causes a.;>_750 gpm "D" SGTR. SAE declared on NC leak > 50 gpm with unisolable secondary rupture to outside containment.
Actual (10 mile EPZ) sirens will be sounded and EBS activated. The release to atmosphere is from primary to "D" S/G and out the unisolable hole in "D" main steam line. Although the release is not large enough to recommend evacuation, an evacuation recommendation of two miles around and five miles downwind will be given based on entering a General Emergency.
The General Emeraency will be declared as a result of the loss of two FP barriers with potential for the -
loss of the third. Sime the plant is in natural circulation,-it is hard to realize that mechanical fuel damage can happen (potential loss of third barrier) without the message sheet from Westinghouse about possible defective fuel. Sirens and EBS will be simulated at General Emergency.
,.
.. _ _ _ _ _
. _. _._
_ -_.
. _ _ _ _ _ _ _ _ _ _ _.
.
CATAWBA EXERCISE EVENT SEQUENCE MARCH 1.1994 Lnitial Canditions Unit 1 100% power. EOL 74 ppm. 239 5 EFPD 20gpd "D" SG tube leak Unit 2100cf power Weather Wind Speed 8.2 mph Direction from 045*
,
T + 0.8 No precipitation Temperature 58*
Failures
_
I
"D" S/G tube leak / rupture Unisolable main steam line rupture
Rx fuel damage
]
Mockuos Explosive Device SLED Bomb Robot NV Valve 914
'
CATAWBA NUCLEAR SITE EXERCISE EVENT SEQUENCE TIMEUNE MARCH 1,1994 0800 -- $ta' Siautator is ever r
20 *at 8e* Oav 'O' SG ! ce teen.0138 gun aeoate of MV914 vatve in progress 08*5 - h ere catL CAS about :).ro 0830
-- Contaminateo w oicat Injury Occurs o
535 - sono Found at $5F. Notify $s & SLEO.
0845 Declare Alert Suspected Bone Found Insice-e tre Prctected Ares Conduct Site Assently e
Activate f3C, OSC, EOF, and JIO e
'
1
0915 SLED errives at Site
-
l
)
0930 Transport Medical Injury to PMC
l 1000
- Explosive Device Detonates in Unit 1 Outside Dogmouse
-
(Unknown second Device), Blows Hole in aca Main Steamline j
+ "0" SG rapidly oepressurires causing 3 750 gpm "0" SGit (prinary to secondary to atmosonere test)
i
'
1001 -+- Main turbine cunback - 955 nn 1003 - Manually trip Rx and $1 Causing Main fureine trip and Feecbeter Isolation 1004 - Loss s h ooling - manually trip NCP's 1005 --- Declare SAE SG fube Leet > 50 g;n with steam line break outside contairment on the rtstured SG 1015 - Somd $1 reno end Activote Ett 1055 -. ex vessel loose Parts Alarm EMF 53A and $3e Increasing (RR Rediation)
o
$uspected Mechanical Canage to Fuel
1100 - Declare GE - Loss of 2 of 3 Fission Frocszt Barriers with PoteN iel for Loss of Third terrier 1115 - Evecuation 2 miles aromd and 5 miles dowiwind as per General Emergency Procedure 1400 - Termirate
.
l