SUBJECT:
UPDATED INSPECTION PLAN FOR CATAWBA NUCLEAR STATION UNITS 1 AND 2 (REPORT 05000413/2023005 AND 05000414/2023005)
Dear Nicole Flippin:
The enclosed inspection plan lists the inspections scheduled through June 30, 2025, for Catawba Nuclear Station. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 404-997-4575 with any questions you have regarding this letter.
Sincerely, Eric J. Stamm, Chief Reactor Projects Branch 1 Division of Reactor Projects Docket Nos. 05000413, 05000414 and 07200045 License Nos. NPF-35 and NPF-52 Enclosure:
Inspection Plan cc w/ encl: Distribution via LISTSERV August 25, 2023 Signed by Stamm, Eric on 08/25/23