Monthly Operating Rept for Feb 1983
ML20073E794
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 03/01/1983
From: Kelly L
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To:
Shared Package
ML20073E793 List:
References
NUDOCS 8304150338
Download: ML20073E794 (6)


Text

,

l *-

"e s

OPERATING DATA REPORT DOCKET NO. 50-286 DATE 03-01-83 COMPLETED BY L- Kelly TELEPHONE f o' o -8200 OPERATING STATUS Indian Point No. 3 Nuclear power ei.n Notes -

1. Unit Name:
2. Reporting Period: February 1983
3. Licensed Thermal Power (MWr): 3025
4. Nameplate Rating (Gross MWe): 1013
5. Design Electried Rating (Net MWe): 965 .
6. Maximum Dependable Capacity (Gross MWe): 926
7. Maximum Dependable Capacity (Net MWe): '891 S. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To Which Restricted,1f Any (Net MWe):
10. Reasons For Restrictions. !f Any:

This Month Yr..to.Date Cumulative'

11. Hours in Reporting Period 672 1416 *s6977.0
12. Number Of Hours Reactor Was Critical 0 0 34090.R
43. Reactor Reserve Shutdown Hours 0 - n n.n
14. Hours Generator On.Line 0 0 32913.1

-15. Unit Reserve Shutdown Hours 0 0 0.0

16. Gross Thermal Energy Generated (MWH) o o nm auni n
17. Gross Electrical Energy Generated (MWH) 0 0 26298300.0 IS. Net Electrics! Energy Generated (MWH) 0 0 25183443.0
19. Unit Service Factor 0 0 57.8
20. Unit Availability Factor 0 0 s7.s
21. Unit Capacity Factor (Using MDC Neti - 0 0 49.6
22. Unit Capacity Factor (Using DER Net) 0 0 4s.8
23. Unit Forced Outage Rate 0 0 14.3
24. Shutdowns Scheduled Over Next 6 Months (Type.Date,and Duration of Each): * '

4 -

Refttolino out ace in proqress Upon cc:::pletion of scheduled 25, If Shut Down At End Of Report Period. Estimated Date of Startup: Maintenance Est. Date (May 1983)

26. Units In Test Status (Pnor to Commercial Operation): Forecast Achieved s

INITIA L CRITIC A f.!TY 8304150338 830310 ITY DRADOCK05000h RATION .

AVERAGE DAILY UNIT POWER LEVEL l DOCKET NO. 50-286 Indian Point UNIT Mn 3 DATE 03-1-83 COMPLETED BY L Keliv TELEPHONE (914) 739-8200 MONTH rebruary 1983 DAY AVERAGE DAILY POWER LEVEL DAY I AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0 g7 0-2 0 18 0 3 0 0 19 4 0 0 20 5 0 21 0 6 0 0 22 7 0 E O l 8 0 24 0 9 0 0 25 10 0 26 0 II O 0 27 12 0 0 28

~

13 0 29 14 0 30 IS 0 33 16 0

INSTRUCTIONS .

On this format. list the average daily unit power levelin MWe Net for each day in the reporting month. Cornpute to the nearest whole rnegawatt.

^

(9/77) 1

. UNIT SifUTDOWNS AND POWER REDUC 110NS DOCKET NO. S0-286 __

UNIT NAME Indian Point No. 1 DATE 03-01-83 COMPLETED BY L. Kelly REPORTMONTil February 1983 TELEPilONE (9141 739-8200 e, '

u B c

,$E };; 4 E3 Licensee E r, gn, Cause & Corrective N.e. Date 5g jg5 Q Event g,7 gO'8 Action to I-

'yE 5 3 e ;g =3 Report # mO o Prevent Recurrence o

b '

04 820325 S 672 B&C N/A N/A N/A Unit in a scheduled cycle III-IV refueling and maintenance outage.

1 2 3 4 F: Fmced Reason: Method:

S: Scheduled Exhibit Instsuctions ATquipment Failure (Explain) 1-Manual for Preparation of Data B Maintenance or Test 2-Manual Scram. Entry Sheets for Licensee C Refueling 3 Automatic Scram.

D Regulatory Restriction Event ReporI (LER) File (NUREG-4-Dther (Explain) 0161)

E-Operator Training & License Examination

  • F-Administrative 5

G-Operational Error (Explain)

(9/77) 1101her(Explain) Exhibit , Same Source 9

SUMMARY

OF OPERATING EXPERIENCE Indian Point Unit.3 remained shutdown for the entire reporting period.

Unit repairs, modifications and preventive maintenance are proceeding as scheduled.

Steam generator sleeving has been completed. Steam generator girth weld repairs are in progress.

n o h i c t t c i A w s

e v n i

t o c e e r r i h r w t o 3 n C d 9 o e 9 M r 1 i a

p y

r e a R u

r b

e F

e d

o m

t n

a n d o n i u t d c e n r T u R f n .

O l i P a n E M o R

i I t c

Y n R u f

O l G a E

T M A

C C

I e

c Y

a L t r

i i n T T e t N m a O p e M i H u 3 q d6 E i#

c At i

cu i c rr oi BC 3

R. 8 W 9 2

l 2

3 _

e 6 t 9 a 1 D 1 C

I

HOtiTilLY HAIllTEllAtiCE REPORT 3. .

Month .

WR e DATE EQUIPMENT -

MALFUtiCTION CORRECTIVE ACTION I-2846 2/83 Boric Acid Injection Tank Inaccurate reading Replaced flow indicator Recirculation Flow Indicator FI-916.

I-3023 2/83 Service Water Pump #35 Low discharge pressure Rebuilt pump ,

I-3197 2/83 Let Down Isolation Valves Valve packing leaks Repacked and tightened

  1. 201 and 202.

I-3216 2/83 Iodine Monitor Channel IV Pump mntor tripped s on thermal Replaced cump vane overload y I-3243 2/83 Fuel Storage Building Loose clutch Readjusted Rolling Door I-3245 2/83 #34 Service Water Strainer Valve jammed Lubricated Blow Down Valve. ,

I-3366 2/83 #35 Fan Cooler Unit B-Damper Frozen linkage Cleaned and lubricated ,

  1. 35 r'an Cooler Unit D-Damper Loose bolts Tightened bolts I-3380 2/83 ,
  1. 32 Auxiliary Feed Pump j Actuator arm misaligned Readjusted I-3383 2/83 ,

Steam Isolation Valve l PCV-1330a. -

  1. 33 Service Water Strainer  ! Valve jammed Cleaned and lubricated I-3427 2/83 i Drain. . ,

I-3368 2/83 Containment Press Relief Dirty slide valve Cleaned and reassembled PCV-1190 Solenoid Valve ,

SOV-1290.