1 - +

J OPERATING DATA REPORT DOCKET NO. 50-286 DATE 11-1-82 COMPLETED BY I. Auterino TELEPHONE (9141 7'49-8200 OPERATING STATUS

1. Unit Name: Indian Point No. 3 Nuclear Power P1 "t
2. Reporting Period: October 1992
3. Licensed Thermal Power IMWt): 3025
4. Namepiste Rating (Gross MWe): 1013
5. Design Electrical Rating (Net MWe): 965 .

7

6. Maximum Dependable Capacity (Gross MWe): 926
7. Maximum Dependable Capacity (Net MWe): 891
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

'r

9. Power Level To Which Restricted. If Any (Net MWe):
10. Reasons For Restrictions,if Any:

This Month Yr..to.Date Cumulative'

11. Hours In Reporting Period 745 7,296.0 54,097.0
12. Number Of Hours Reactor Was Critica! 0 1,984.0 34,090.8
43. Reactor Reserve Shutdown Hours 0 . 0 0-
14. Hours Generator On-Line 0 1.969.6 32.913.1

--15. Unit Reserve Shutdown Hours 0 0 0

16. Gross Thermal Energy Generated (MWH) 0 5.060.030 86.143.401
17. Gross Electrical Energy Generated (MWH) 0 1.502.170 26.298.'400
18. Net Electrical Energy Generated (MWH) 0 1,436,036 25,183,443
19. Unit Service Factor 0 27.0 60.8
20. Unit Availability Factor 0 27.0 -

60.8

21. Unit Capacity Factor (Using MDC Neti 0 22.1 52.2
22. Unit Capacity Factor (Using DER Net) 0 20.4 48.2
23. Unit Forced Outsge Rate 0 2.3 14.3
24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each): ,

Refuelino outane in prooress.

Upon completion of scheduled 25, if Shur Down At End Of Report Period. Estimated Date of Startup: maintenance Est. date (Jan. RO

26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION ,

8212290160 821110 PDR ADOCK 05000286 R PDR

~ ._ . _ - . __ G4/77i

c.

DOCKET NO. 50-286

. UNITSilUTDOWNS AND POWER REDUCTIONS

  • UNIT NAME Indian Poirf t No.,3 DATE 11-1-82 COMPLETED BY L. Auterino REPORT MONTil October 1982 TELEPilONE (914) 739-8200 n.

- E E

' "' # Cause & Corrective No. Date E. ';; e  :- 4 x - n .c = cc I:veni -

9.}o Action to -

'$5 5 j d5 y Report * <E 0 5

}U Prevent Recurrence s

04 820325 S 744 BaC N/A N/A N/A Unit in a scheduled cycle III-IV refueling and maintenance outage.

I I

l l

I 2 3 4 F: Forced Reason: Method:

S: Scheduled Exhibit - Inst ructions A Equipment Failure (Explain) l-Manual for Preparation of Data B Maintenance or Test 2 Manual Scra n.

Emry Sheets for Licensee C. Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain). 0161)

E-Operator Training A License Examination ~

F-Administrative 5 G. Operational Error (Explain)

(9/77) Il-Other (Explain) Exhibit . Same Source 9

,- AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. _50-286 Indian Point UNIT Mn 3 DATE 11-1-82 COMPLETED BY L. Auterino TELEPHONE (914) 739-8200

.\f0 NTH October 1982 DAY- AVERAGE DAILY POWER LEVEL DAY /

AVER AGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0 0 37 2 0 is 0 3 0 ,, o 4 0 20 0 5 0 0 21 6 0 0 22 7 0 0

' - - - ' -~ ~~

23 8 0 0 24 9 0 25 0 10 0 0 26 II 0 0 27 12 0 0 28 13 0 0 29 14 0 0 30 15 0 0 33 16 0 INSTRUCTIONS On this format, list the average daily unit power level in MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.

O

MONTilLY htAINTEN.'.NCE REPORT -

October 1982 -

Month -

WP d DATE EQUIPMENT .

MALFUNCTION CORRECTIVE ACTION 3140 10-12-82 Residual Heat Renoval Valve Condeit to valve interferes with Reroute conduit f10V-731 access to steam generator 2988 9-27-82 liain steam stop valve f1S-2-2 Inspection of valve seating surface Cleaned valve seating surface. .

3158 10-26-82 Auxiliary boiler feed pumps Valves not seating properly Repaired seating surfaces emergency city water valves PCV-ll87 and PCV-ll88.

S e

I .

4 J

o MONTHLY I & C CATEGORY I REPORT {

_0c_tober 1982 Month DATM MALFUNCTION CORRECTIVE ACTION W.R. No. EQUIPMENT 10-5-82 TI-1203 Containment Temp, Erratic Indication Repaired loose connection IC-1-1730 erature Indicator on Indicator IC-1-1804 9-23-82 RE-315 Administration Intermittent alarm Resoldered all connections in Bldg. Area Radiation connector at drawer for Detector Monitor. Cable.

}

  • me w e %s y

i

  • ..)g.' :.

SUMMARY

OF OPERATING EXPERIENCE.

Indian Point Unit 3 ' remained shutdown for the entire reporting peridd.

Unit' repairs, modifications and preventive maintenance is proceeding as scheduled.