Responds to NRC Re Violations Noted in IE Insp Repts 50-456/81-14 & 50-457/81-14.Corrective Actions:Liftoff Test Will Be Performed on Last Tendon Stressed on Each Day Gauges Found Out of Tolerance.Final Rept Available 830228
ML20064E560
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 12/13/1982
From: Tramm T
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20064E548 List:
References
5570N, NUDOCS 8301060054
Download: ML20064E560 (1)


Text

N Commonwealth Edison e, , - ) one First Nihon11 Plaza. Chicago, Ilhnois O Addr:s3 R: ply to: Post Office Box 767 Chicago Illinois 60690 December 13, 198 2 Mr. James G. Keppler, Regional Administrator Directorate of Inspection and Enforcement - Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137

Subject:

Braidwood Station Units 1 and 2 I&E Inspection Report Nos.

50-456/81-14 and 50-457/81 Re ference (a): January 5, 1982, letter from C. E. Norelius to Cordell Reed.

(b): February 4, 1982, letter from L. O. De1Geo rge to J. G. Kepple r.

(c): August 18, 1982, letter from T. R. Tramm to J. G. Kepple r.

Dear Mr. Keppler:

This is to provide information regarding liftoff testing of tendons stressed at Braidwood Unit 1 using gauges which were later found to be out of tolerance. This matter was discussed in the inspection report attached to reference (a) and was the subject of a No tice o f Violation.

In responding to the Notice of Violation we indicated that a liftof f test would be performed on the last tendon stressed on each day the gauges were f ound to be out o f tolerance. The results of these tests would be evaluated by the architec t-engineer to determine if further action is necessary. We originally expected to be able to supply a report o f this evaluation by June 30, 1982. The testing has not yet been done, however, because the work force is still completing tendon work on Unit 2. It now appears that the testing will be done in January 1983 and that our final report will be available by February 28, 1983.

Please address questions regarding this matter to this office.