ML20011F621

From kanterella
Jump to navigation Jump to search
Forwards Revised PHOENIX-P/ANC Benchmark Scope to Replace Existing Ark & 2D Codes Used to Perform Neutronic Analyses for PWR Reload Designs.Codes Expected to Be Used in Dec 1990 for Cycle 3 Design Calculations
ML20011F621
Person / Time
Site: Braidwood Constellation icon.png
Issue date: 02/21/1990
From: Silady J
COMMONWEALTH EDISON CO.
To: Murley T
Office of Nuclear Reactor Regulation
References
0689T, 689T, NUDOCS 9003070048
Download: ML20011F621 (4)


Text

]

M.' ' j. -

P o

1 1 N Commonwealth Edison:

I T 1400 Opus Pl:ce..

1

+-*<d=/

fu

'y, O

Downers Crove, Illinois 60515 b '.

February 21, 19PO i

Dr. Thomas E. Murley Of fice-of Nuclear Reactor Regulation

'U.S. Nuclear Regulatory Commission Washington, D.C.

20555 e

7

' Subjects Braidwood Nuclear Power Station Unit 1 Transition in Neutronics Codes for PWR Reload Design NRC Docket No. 50-456 Referencesi :(a) October 20, 1988 conference call between t,2Co (J.A. Silady, B.F. Momsen, D.J. Wanner, et al.)

s:

sud NRR (C. Patel, B. Siegel, D. Fieno).

(b) January 10, 1990 conference call between CECO H

(J.A. Silady, H.S. Kim, D.J. Wanner, et al.)

and NRR (D. Fieno)

Dr. Murley

I s

l Conunonwealth. Edison Company (CECO)'is planning to implement the NRC-approved Westinghouse codes PHOENIX-P'and ANC to replace its existing ARK and 2D codes which are used to perform neutronic analyses for PWR reload designs.

In' support of this cc,de transition, CECO plans to submit a Licensing Topical Report (LTR) by July'15, 1990. The new codes are expected to be used-c L

starting-in December of 1990 for Braidwood Unit 1 Cycle 3 (BW103)- design L

calculations. Application of these codes for other CECO reload designs for Braidwood, Byron. and Zion would follow this initial use for BW103.

.-CECO plans.with respect to the content of the LTR have previously 1

been discussed with your staff on the Reference (a) and (b) conference calls.

Attachment A outlines the general scope of the submittal as modified based on the. staff ~ guidance.

It reflects the tact that the subject computer codes have l

been previously reviewed and approved for similar applications by

. Westinghouse.

L Attachment B summarizes the proposed LTU submittol schedule. CECO

(

will be available to meet with the NRC as needed to facilitate the review of

.the - LTR.

0 b0 i' \\\\\\

. v.

-9003070048 900221 t

R_-.ADOCK0500g6

+.

y Dr. Thomas'E. Murley' ~ February 21, 1990t i

l Please contact this office should further information be required.

Very truly.yours, 7

r J.A. Silady.

3 Nuclear Licensing Administrator Attachments

~A. Revised PHOENIX-P/ANC Benchmark Scope B. Proposed-CECO PHOENIX-P/ANC Topical Submittal Schedule cc A.B. Davin - Region Administrator,~RIII 0.P. Patel - Zion Project Manager, NRR S.P. Sands - Braidwood Project Manager, NRR P.O. Shemanski - Byron Pr3 ject Manager, NRR R.C. Jones - Reactor Systems Branch Chief, NRR 0689T.

F

+

i

e,s j

.1

)

.t;..

ATTACHMENT A ReYine.d PHOENIX-P/ANC Benchmark Scope 1.

Comparison to Station Measurements-A.

Core Reactivity

1. -Byron 1 Cycle 4 Startup C-itical Boron 2.

Zion 1 Cycle 11 Lifetime Predictions B.

Power Distribution

1. Byron 1 Cycle 4 BOL HZP and BOL HFP Flux Maps 2.

Zion 1 Cycle 11 BOL, MOL and EOL Flux Maps C.

Control Rod Worths 1.

Byron 1 Cycle 4 Rod Swap Data D.

Isothermal Temperature Coefficient 1.

Byron 1 Cycle 4 MTC, DTC and ITC Data

'l II.

Comparison to Selected Vendor Results i

A.

Model Comparisons l

i 1.

Braidwood 2 Cycle-2 Boron Letdown 2..

Braidwood 2 Cycle 2 Power Distributions B.

Neutronics Input to SPIL Calculations

{

1.

Braidwood 2_ Cycle 2 Delayed Neutron Fraction 2.

Braidwood 2 Cycle 2 Rod Ejection Calculations III.

PHOENIX-P/ANC Code Uncertainties j

A.

Justification for Use of Westinghouse Uncertainties 1

l 1

0689T i

3 3

p',

~q.

P t :,.c; - w

{

, pf V.g.

  • ~ ^

I

{

c h

b p.

FIpposed Ceco P110ENIX-P/ANC__ Topical Submittal' Schedule t

Event Date

?

Initial Discussion of CECO Plans 10/20/90*

CECO Discusses F110ENIX-P/ANC Topical Scope 01/10/90*

l.

f CECO Submits Pi!0ENIX-P/ANC Topical to NRC 07/15/90 c

Meeting (s) to Address Staff Questions To be scheduled as

^ '

needed First CECO Use of PliOENIX-P/ANC 12/15/90 (Braidwood Unit'l Cycle 3)

  • -' Action completed