ML20205K358

From kanterella
Jump to navigation Jump to search
Submits Request to Reschedule Breaker Maint Insp for Braidwood Nuclear Power Station for Either Wk of 990607 or One of Last Two Wks in Jul 1999
ML20205K358
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 04/06/1999
From: Schwartz G
COMMONWEALTH EDISON CO.
To: Jordan M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 9904130147
Download: ML20205K358 (1)


Text

I o mmonwealm alison comp.my

, FRIORGT ROUTING Braidu oud Gercratmg Station . First Secor$

j, nouie i.n"'*i

-RA RC nraccone, nu.ow>t,"'

l Tei sisasa 2xo DRA EIC l

g l vdR_P orb SGA 01 Ph April 6,1999 DNMS DRE PAO M '

FILE! IA M ,

Michael J. Jordan, Projects Branch Chief 1 l

U. E. Nuclear Regulatory Commission - Region 111 j 801 Warrenville Road I Lisle, IL 60532-4351 l

Subject:

Request to Reschedule Breaker Muintenance Inspection for Braidwood Nuclear Power Station

Reference:

Letter from G. E. Grant (U.S. NRC) to O. D. Kingsley (Comed) l

" Plant Performance Review - Braidwood Units 1 and 2," dated March 26,1999.

1

Dear Mr. Jordan:

The reference letter pravided the Plant Performance Review (PPR) for Braidwood Station. Included with the PPR was the NRC inspecticn plan for 3raidwood Station for the next six months. After reviewing the inspection plan, we request that you reconsider the scheduled dates for the Breaker Maintenance Inspection. This inspection is currently i scheduled to take place April 12 -16,1999, at Braidwood Station. A later inspection dew would allow station personnel to provide better support for the Breaker Maintenance Inspection. At this time, r.umerous resources are being expended on the NRC Engineering and Technical Support / Corrective Actions inspection (which is scheduled to end on April 23,1999), refueling outage preparations, and activities associated with an unplanned Unit 1 shutdown.

Insorder to better accommodate the inspection activity, we propose that this Breaker i Maintenance Inspection for Braidwood Station be rescheduled for either the week of l June 7,1999, or one of the last two weeks in July 1999.

Your consideration for this request is appreciated.

Sincercly, x

) 1 1

h -

G. Keith Schwart- f Strii.n Manager I Braidwood Generating Station

{

9%IByks &ss

, ., .o

! 9904130147 990406 i PDR ADOCK 05000456 0 PDR a A t nicom compan3