ML18022A398

From kanterella
Jump to navigation Jump to search
Urges Denial of Util Request for Exemption from 10CFR50,App E to Conduct Full Participation Exercise of Emergency Response Plan within 1 Yr of Commercial Operation
ML18022A398
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 09/08/1986
From:
AFFILIATION NOT ASSIGNED
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 8609160095
Download: ML18022A398 (4)


Text

REGULA RY INFORMATION DISTRIBUTI SYSTEN (RIDS)

ACCESSION NBR: 8609160095 DOC. DATE: 86/09/08 NOTARIZED: NO DOCKET 0 FACIL: 50-400 Sheav on Havv 35 Nuclear Power Plant> Unit li Cav olina 05000400 AUTH. NAl'tE AUTHOR AFFILIATION Affiliation Not Assigned REC IP. NANE RECIPIENT AFFILIATION DENTONi H. OFfice of Nuclear Reactor Regulationp Div ectov'post 85li25

SUBJECT:

Uv'ges denial of util request for exemption from 10cfr50i App E to conduct full pav ticipation exercise of emergency v esponse plan within 1 gr oF commercial opev'ation.

DIBTRIDUTION CODE: YEOBD TITLE: Request COPIEB RECEIVED: LTR J fov'RR Action (e. g. 2. 206 Petitions)

ENCL 0 BIZE:

5 Related Correspondenc NOTES: Application fov permit v eneutal filed. 05000400 RECIPIENT COPIES RECIPIENT C OP I ES ID CODE/NANE LTTR ENCL ID CODE/MANE LTTR ENCL PWR-A PDZ LA PNR-A PD2 PD BUCKLEY'S B 01 INTERNAL EDO/ACB ELD/HDS1 EL NRR DIR EG EXTERNAL: LPDR 03 NRC PDR 02 NSIC 05 TOTAL NUNBER OF COPIES REQUIRED: LTTR il ENCL

All C," >>h hi)'I i I'0h",

I I"

I'I C'K I

1,) > I

)"

',I t lb>>

h ~, hb,

' E

'I>>

'kg>> 1,1]

lh>>4'""

lb, <"'".'gT -;gag j I, b b I I I bhf 0>>

g <>);),P', @P g ill)>> ~

h1 I I

I

~":i k 'l ) .)

I I

l ~ J>> wh h h II b I'l Ib

Director Regulation roid Denton, Reaction Mr. Haro eac Office of e Nuclear Commission Nuclear R gulatory DC 2055 5 Nashington, (LK

Dear Mr. Denton:

denial of CPS,L"s request for I wish to urge requirement, under iO CFR 50, th I Company conduct a ful exemption from e endix E, that the Response,'-.

9 Appendix exercise o f thee Emergency m

articipation Shearon Harris nucleg power planant

'lan r for i its s before beginning corn ommercial

~within one year or before operating at operation of the plant rated power.

reater than five percent of believe this exercise should be conducted before the plant is permittedd too o crate at all.

I 8

860'))1600'V5 860908 V@q PDR *DOCK 05000400 H PDR