REQUI ATORY INFORMATION DISTRIBUTION BYBTEN (R IDB)

ACCESSION NBR: 8609120352 DOC. DATE: 86/09/10 NOTARIZED: NO DOCKET ¹ FACIL: 50-400 Shearon Harris Nuclear Potoer Planti Unit ii Carolina 05000400 AUTH. NANE AUTHOR AFFILIATION BARNHILL>J. T. Affiliation Not Assigned CARNEY Affiliation Not Assigned NORREALE+ N. C. Affiliation Not Assigned RECIP. NAI'IE RECIPIENT AFFILIATION DEN TON NRC No Detailed Affiliation Given.

SUBJECT:

Package of comments urging denial of util exemption from requirement to perform full participation exercise within gr before beginning commercial operation.

DISTRIBUTION CODE: YE03D COPIES RECEIVED: LTR ENCL BI ZE:

TITLE: Request for NRR Action (e. g. 2. 206 Petitions) 5 Related Correspondenc NOTES: Application. for permit renewal filed. 05000400 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAI'fE LTTR ENCL PNR-A PD2 L* PWR-A PD2 PD 3UCNLEYe 8 01 INTERNAL: EDO/ACB ELD/HDB1 NRR DIR R FILE 04 EXTERNAL: LPDR 03 NRC PDR 02 NBIC 05 TOTAL NUNBER OF COPIES REQUIRED: LTTR 1 1 ENCL

I hr I

h 1, 1'Il I 1 I,

II 1'

~ h I

1 4

,1!

"' I-'r I

f,. );H ~ Hl .,

H I~ II <<'t<<i 4

)44 l ~ 'I r I <<4 I ~,

ll

Dear Mr. Denton:

I wish to urge denial of CPBL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at, greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

8609120352 860910 PDR ADOCK 05000400 PDR

k 0

I 'I J

P,

Dear Mr. Denton:

I wish to urge denial op CPSL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

-k 4~

l l-'

A; wr.'

gQ~~~Ag 1

GOODYIILL INQU OUR BUSINESS>

FOR OISABLEO Fk

Dear,

Mr. Denton:

I wish to urge denial of CPRL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Cqmpany conduct a full participation exerc'x:se of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year befope beginning commercial operation of the plaht qr before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely, g,oo

ih

)

l

Dear Mr. Denton:

Zl-I wish to urge denial of CPBL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely, Srni4Son 0<<~y