t REGULATORY INFORMATION DISTRIBUTION SYSTEM 86/09/01 t (RIDS)

ACCESSION NBR: 8609110182 DOC. DATE: NOTARIZED: NO DOCKET 5 FACIL: 50-400 Shearon Harris Nuclear Poeer Plant> Unit 1. Carolina 05000400 AUTH. NANE AUTHOR AFFILIATION ROGERS> A. Affiliation Not Assigned ROQERSi D. L. Affiliation Not Assigned DALTON> R. Affiliation Not Assigned RECIP. NAKE RECIPIENT AFFILIATION DENTON NRC No Detailed Affiliation Qiven

SUBJECT:

Package of five comments urging denial of util request for exemption from 10CFR50> App E requirement re conduct of full participation emergency response plan exercise toithin 1 gr before beginning commercial operation.

DISTRIROTION CODE: YEOSD TITLE: Request for COPIES RECEIVED: LTR Q ENCL NRR, Action (e. g. 2. 206 Petitions) Zc lRelated SIZE:

Correspondenc NOTES:Application for permit renewal filed. 05000400 RECIPIENT COPIES REC IP I ENT COPIES ID CODE/NAl'1E LTTR ENCL ID CODE/MANE. LTTR ENCL PNR-A PD2 L* PWR-A PD2 PD

.BUCKLEY B 01 INTERNAL: EDO/ACB ELD/HDS1 ELD/ NRR DIR EXTERNAL: LPDR 03 NRC PDR 02 NSIC 05 TOTAL NUf'ABER OF COPIES REQUIRED: LTTR ENCL if

RI

~

RI ~ I

'I >It R'4 SR>] 4

" tv, 1 4 R II ti 44 4 ~ 4 R 4 I I I

44vjP t

144, ~ II

>4R 4

4. 3 1,

I' I vll'v 4>4

~~jgpcdn1917 s ~ sr ~ ylj@L jl'7Cgy c

pG 075/0g

~""(,

Director Mr. Harold Denton, Reaction Regulatiop f Nuclear Office o Regulatory u

Commission Nuclear 20555 washington, DC

Dear Mr. Denton:

wish to urge denial of CPS,L's request10 for

.. exemp ion' t'rom cAppendix E, that the requirement, under a u CFR 50, the Company conduct of the Emergency Response cI~garticipation exerciseHarris nuclear power plant oon. lan for its Shearon th'e year before beginning operation of the plant or befoxe rated commercial operating at power.

a greater thanthefive percent of 'evacua-ecause of kneed for changes in the Q~+

ion plan, I believe this exercise should be to onducted before the plant is permitted goo.. operate at all.

yc49 mn XSincerely, P~<~ AW~W P ~gg~p +~~

C

~ i'd ~,

Mr Harold office Dento nton, Director ce of Nuclear N 3. R ngton I to Reaction Co n g

20555

Dear Mr. Denton:

I wish to ur denial of CPSL's request for exemption from the requirement,@+der 10 CPR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

l t

I

-. W~cC dg Q//8/P X I.FX

~~c +Pjig /&86 coillhct 1'ovA I'tPYO

(~

Mr. Harold Denton, Director Office of Nuclear Reaction Regulation Nuclear Regulatory Commission Washington, DC 20555 II

Dear Mr. Denton:

I wish to urge denial of CPSL's request for exemption from the requirement, anger 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

'?

~(~ e~~ tlEx T D.~Y DELIvcAY i C.

J %fP4%FPQ~+>

0)

'AG4 IS66 COtkfe'IC T' Rw K, CUR PO~ ICF 4,,g L

Mr. Harold Denton, Director Office of Nuclear Reaction Regu.'<

Nuclear Regulatory Commission ~

Washington, DC 20555 h

Dear Mr. Denton:

I wish to urge denial of CPRL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full p rticipatiorv,.exercise of the Emergency Response P3;an for its Sh'earon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes jn the evacua-tion plan, I believe this exerciph should be conducted before the plant is peimitted to operate at all.

Sincerely,

VSh ii, p.'g

~

~ fA K

gg>~csv Awc> <rp- ~@~ l~ 'w

~iaaf~ '~a~a

, nc. Ir:t6 ..

27K i@'

Mr. Harold Denton, Director Office of Nuclear Reaction Regulation Nuclear Regulatory Commission Nashington, DC 20555 p( a ~

)y)

C t

t

Dear Mg. '5'ent,

on: I Cp wish to urge denial of CPSL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a full participation exercise of the Emergency Response Plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely,

'I gl