Package of Four Comments Urging Denial of Util Request for Exemption from Requirement Under 10CFR50,App E That Full Participation Exercise of Emergency Response Plan Be Conducted within 1 Yr Prior to Commerical Operation
ML18019B146
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 09/02/1986
From: Blotnich J, Davis S, Riconde V, Vanghan J
AFFILIATION NOT ASSIGNED
To: Harold Denton
NRC COMMISSION (OCM), Office of Nuclear Reactor Regulation
References
NUDOCS 8609050261
Download: ML18019B146 (10)


Text

REGULA Y INFORMATION DISTR IBUTI SYSTEN (R IDS)

ACCESSION NBR: 860905026i DOC. DATE: 86/09/02 NOTARIZED: NO DOCKET 0 FAC IL: 50-400 Shearon Harris Nuclear Poeer Plant> Unit i. Carolina 05000400 AUTH. NAI"1E AUTHOR AFFILIATION D*VISE S. E. Affiliation Not Assigned VANQHANiS. K.. Affiliation Not Assigned R ICONDEE V. Affiliation Not Assigned RECIP. NAME RECIPIENT AFFILIATION DENTON> H. Commissioners

SUBJECT:

Package of four comments urging denial of util request for exemption from requirement under iOCFR50i App E that full participation exercise of emergencg response plan be conducted within i gr prior to commerical operation.

DIBTRIDUTIQN CODE: YEQBD CQPIEB RECEIVED: LTR Q ENCL Y/ BI IE:

TITLE: Request for NRR Action (e. g. 2. 206 Petitions) Zc Related Carr spondenc NOTES:Application for permit. renewal filed. 05000400 RECIPIENT COPIES I REC I P ENT COP1ES

.ID CODE/NAt'iE LTTR ENCL ID CODE/MANE LTTR ENCL PNR-A PD2 LA PMR-* PD2 PD BUCKLEYI B Oi INTERNAL EDO/ACB ELD/HDSi NRR DIR 0 FILE 04 EXTERNAL: LPDR 03 NRC PDR 02 NSIC 05 TOTAL NUBBER OF COPIES REQUIRED: LTTR i ENCL ii

<<<<k I

I V V V

<< 'It

>>I'a <<ii 1 'I'ti V g P>> <<li h'<<" ll k k

~ "h Il k ) <<kit<<<<I fl

$ ) kk qgti .

(,kS.." << "~ It I Pli,ll <<

li<<2 4 'I r.

,j .: 'k'h'.;k 'k>, " k S<<v <<kk'<<'k i<<k I k

'l l" ~ I

' ~P," I Ji 4 <<kg'" Ph f9<<I( i h. *l ~

lit Il r'I<< I V 4 << ~ t>> '

h I<<

t Yr

<<f

Mr. Harold Denton, Director Office of Nuclear Reaction Regulation Nuclear Regulatory Commission Washington, DC 20555 4

t.

~

~ ~

~ g ~ '~

Dear Mi'. Denton:

I wash to urge denial of CPSL's request for exemption from the requirement, unde@ 10 CFR 50, Appendix E, that the Company conducV a full participation exercise of the Emergency Response plan for its Shearon Harris nuclear power plant within one year before beginning commercial operation of the plant'r before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I believe this exercise should be conducted before the plant is permitted to

operate at all.

Sincerely, I

J Mr. Harold Denton, Director Office of Nuclear Reaction Regulation Nuclear Regulatory Commission Washington, DC 20555 Dea'r Mr. Denton:,

C p

We are pleased that you denie'4~'backfit status" for'vo design changes to Shearon Harris. We are hoping that you vill require CPS,L to meet

=th'e specific NRC regulations in full. We also hope that you are fully investigating the substance of our concerns in the Petition to Intervene and the Motion to Stay the Immediate Effectiveness of the NRC's Licensing Board's Final Decision on Shearon Harris.

Sincerely, Y,,V

r b

Yl."

t"

~ ~

i Q,c> ~Vv a v aSj~~W)S I

vvvq'v ~ ~1' USS,, j J~

Mr. Harold Denton, Director Office of Nuclear Reaction Regulation Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Denton:

I wish to urge denial of CPSL's request for exemption from the requirement, under 10 CFR 50, Appendix E, that the Company conduct a'ull participation exercise of the Emergency Response plan-for its Shearon Harris nuclear power plant within one year before begi'nning commercial operation of the plant or before operating at greater than five percent of rated power.

Because of the need for changes in the evacua-tion plan, I'believe this exercise should be conducted before the plant is permitted to operate at all.

Sincerely, r

8 bOP0502b1 8b0~02 pDR ADOCK 05000400 pDR H

l Mr. Harold Denton, Director Office of Nuclear Reaction Regulation Nuclear Regulatory Commission Washington, DC 20555 1E, Dear Mr. Denton I wish to urge denial of CPSL's request for CPR 50, exemption from the requirement, under 10full Appendix E, that the Company conduct a participation exercise of thenuclear Emergency Respons plan for its Shearon Harris power plant

.within one year before beginning commercial operation of the plant or before operating at of rated greater than five percentchanges power.

Because of the need for in the evacua-tion plan, I believe this exercise should to be conducted before the plant is permitted operate at all.

Sincerely,

1