Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
IR 05000412/199900721 October 1999Refers to Special Team Insp 50-412/99-07 Conducted from 990720-29 & Forwards Nov.Two Violations Identified.First Violation Involved Failure to Implement C/A to Prevent Biofouling of Service Water SystemZebra Mussel
Biofouling
ML20217M15919 October 1999Forwards NRC Rept Number 17, Requal Tracking Rept from Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Requal Pass Dates
ML20217C6748 October 1999Forwards RAI Re Licensee 970128 Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions, . Response Requested within 60 Days of Receipt of Ltr
ML20217E0307 October 1999Forwards Insp Repts 50-334/99-06 & 50-412/99-06 on 990809-13 & 990823-27.Violation Noted Involving Failure to Correctly Translate Design Change Re Pertinent Operating Logs & Plant Equipment Labeling
ML20212M26630 September 1999Forwards Order Approving Transfer of Licenses for Beaver Valley from Dlc to Pennsylvania Power Co & Approving Conforming Amends in Response to 990505 Application
ML20216J96230 September 1999Forwards Insp Repts 50-334/99-05 & 50-412/99-05 on 990725-0904.Two Violations Noted & Being Treated as Ncvs.One Violation Re Failure to Follow Operation Manual Procedure Associated with Configuration Control Identified
ML20212K80730 September 1999Informs That on 990916,NRC Staff Completed mid-cycle Plant Performance Review (PPR) of Facility.Staff Conducted Reviews of All Operating NPPs to Integrate Performance Info & to Plan for Insp Activities at FacilityBiofouling
ML20211Q3438 September 1999Informs That During 990903 Telcon Between L Briggs & T Kuhar,Arrangements Were Made for NRC to Inspect Licensed Operator Requalification Program at Plant,Unit 1.Insp Planned for Wk of 991115
ML20211Q5607 September 1999Forwards Insp Rept 50-412/99-07 on 990720-29.Three Apparent Violations Noted & Being Considered for Escalated Ea. Violations Involve Failure to Implement C/As to Prevent bio- Fouling of Svc Water SysBiofouling
ML20211A51118 August 1999Forwards Insp Repts 50-334/99-04 & 50-412/99-04 on 990613- 990724.One Violation Noted & Treated as Non-Cited Violation Involved Failure to Maintain Containment Equipment Hatch Closed During Fuel Movement
ML20209G57012 July 1999Discusses Closure of TACs MA0525 & MA0526 Re Response to RAI Concerning GL 92-0,Rev 1,Suppl 1, Rv Structural Integrity. Info in Rvid Revised & Released as Ver 2 as Result of Review of Response
ML20207H6628 July 1999Forwards RAI Re Util 981112 Response to IPEEE Evaluations for Plant,Units 1 & 2.RAI Was Discussed During 990628 Telcon in Order to Ensure Clear Consistent Understanding by All Parties of Info NeededHigh winds
Design basis earthquake
ML20209D8197 July 1999Forwards Insp Repts 50-334/99-03 & 50-412/99-03 on 990502- 0612.No Violations Noted.Program for Maintaining Occupational Exposures as Low as Reasonably Achievable (ALARA) & for Training Personnel,Generally Effective
ML20207G2617 June 1999Informs That NRR Has Reorganized,Effective 990328.Forwards Organizational ChartEnforcement Discretion
IR 05000412/199800926 May 1999Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-412/98-09
ML20195C44621 May 1999Forwards Insp Repts 50-334/99-02 & 50-412/99-02 on 990321-0501.No Violations Were Identified.Licensee Conduct of Activities at Beaver Valley Power Station Characterized by Safe Conduct of Activities During Refueling Outage
ML20206P12414 May 1999Refers to Proposed Changes Submitted by Dl on 990316 to BVPS QA Program Described in BVPS-2 Ufsar,Chapter 17.2.Forwards RAI Re Proposed QA Program Changes
ML20206N3166 May 1999Responds to Ltr to NRC on Continued Events Re Transfer of Generation Assets Between Dl & Firstenergy.Info Will Be Considered as NRC Monitor Pending License Transfer Application of Bvps,Units 1 & 2 & Pnpp
ML20206H79330 April 1999Ack Receipt of 990426 Request for Enforcement Discretion & 990427 Withdrawal of Request for Enforcement Discretion. Resolution Documented.Enforcement Discretion Not NecessaryEnforcement Discretion
Probabilistic Risk Assessment
Earthquake
ML20206B27522 April 1999Forwards Insp Repts 50-334/99-01 & 50-412/99-01 on 990207- 0320.One Violation of NRC Requirements Identified & Being Treated as non-cited Violation Consistent with App C of Enforcement Policy
ML20206A83820 April 1999Forwards Reactor Operator Initial Exam Rept 50-412/99-301 on 990322-25.All Three Reactor Operator Applicants Passed. Initial Written Exam Submittal Was Determined Not to Meet NRC Guidelines in Certain Instances
ML20205R90720 April 1999Forwards Second Request for Addl Info Re Response to GL 95-07, Pressure-Locking & Thermal-Binding of Safety-Related Power-Operated Gate Valves, for Beaver Valley Power Station,Units 1 & 2
ML20205Q83114 April 1999Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-334/98-11 & 50-412/98-11 Issued on 990225.Actions Will Be Examined During Future Insp of Licensed ProgramCondition Adverse to Quality
ML20205P2439 April 1999Discusses 990225 PPR & Forwards Plant Issues Matrix & Insp Plan.Ltr Provided to Minimize Resource Impact on Staff & to Allow for Scheduling Conflicts & Personnel Availability to Be Resolved in Advance of Inspector ArrivalSystematic Assessment of Licensee Performance
Maintenance Rule Program
Fire Protection Program
ML20205L0349 April 1999Forwards SER Accepting Util 971209 & 980729 Submittal of Second 10-year Interval ISI Program Plan & Associated Relief Requests for Beaver Valley Power Station,Unit 2.TER Also Encl
ML20205K0905 April 1999Informs of Individual Exam Result on Initial Retake Exam Conducted on 990322-25 at Licensee Facility.Three Individuals Were Administered Exam & All Three Passed. Forwards Encl Re Exam.Without Encl
ML20205R17930 March 1999Responds to Issue Re Generic Implication of part-length Control Rod Drive Mechanism Housing Leak at Praire Island, Unit 2 & Beaver Valley Power Station,Units 1 & 2Non-Destructive Examination
Hydrostatic
Probabilistic Risk Assessment
Operating Basis Earthquake
Earthquake
Pressure boundary leak
ML20205C03026 March 1999Informs That Util Responses to GL 97-04, Assurance of Sufficient Net Positive Suction Head for Emergency Core Cooling & Containment Heat Removal Pumps Acceptable
ML20204D73716 March 1999Advises That RW Lindsey Authorized to Administer Initial Written Exams to Sh Cencic,Tf Lardin & Ta Pittas on 990322. Region I Operator Licensing Staff Will Administer Operating Tests
ML20207E02025 February 1999Forwards Insp Repts 50-334/98-11 & 50-412/98-11 on 981227- 990206 & Forwards Notice of Violations Re Uncontrolled Reduction of Main Condenser VacuumMaintenance Rule Program
ML20203D06910 February 1999Forwards SE Accepting Approval of Proposed Revs to Plant QA Program Description in Chapter 17.2 of Updated Fsar,Per Util 981224 Submittal
ML20206U3015 February 1999Forwards Insp Repts 50-334/98-09 & 50-412/98-09 on 981116-1217 & Nov.Violation Identified Re Inadequate Design Control in Unit 2 Dc Voltage Drop Calculation
ML20203A0814 February 1999Forwards Request for Addl Info Re Review of Beaver Valley Power Station,Unit 1 License Amend to Allow one-time Extension of Steam Generator Insp Interval
ML20199E66814 January 1999Forwards RAI Re Licensee Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs, for Plant,Units 1 & 2Probabilistic Risk Assessment
ML20199F19613 January 1999Forwards Insp Repts 50-334/98-10 & 50-412/98-10 on 981115-1226.No Violations Noted.Informs That Overall Fire Protection Program Functioning WellFire Protection Program
ML20199F51029 December 1998Discusses Third 10-year Interval ISI Program Plan & Associated Relief Requests for BVPS-1 Submitted by Dlc on 970917 & 980618.Informs That NRC Has Adopted Ineel Recommendations in TER INEEL-98-00893.Forwards SE & TER
ML20198K59124 December 1998Forwards Emergency Response Data Sys Implementation Documents Which Include Data Point Library Updates for Fermi (Number 268),Peach Bottom (Number 269) & Beaver Valley (Number 270).Without Encls
ML20198K82521 December 1998Forwards SER Granting Licensee 980611,as Suppl 981015 Pump Relief Request PRR-5 for Third 10-year IST Interval for Beaver Valley Power Station,Unit 1 Pursuant 10CFR50.55(a)(f)(6)(i)
ML20198A1309 December 1998Forwards SE Re USI A-46 Program Implentation for Plant Unit 1.Staff Concludes Program Implementation Met Purpose & Intent of Criteria in Generic Implementation Procedure 2 & Suppl SER 2 for Resolution of USI A-46
ML20198B1309 December 1998Advises of Planned Insp Effort Resulting from Beaver Valley Power Station mid-year Insp Resource Planning Meeting Held on 981110.Historical Listing of Plant Issues & Details of Insp Plan for Next 6 Months EnclShutdown Margin
Enforcement Discretion
Fire Protection Program
ML20196J2764 December 1998Forwards Corrected Pages 17 & 18 of NRC Integrated Insp Repts 50-334/98-06 & 50-412/98-06 for Exercise of Enforcement DiscretionEnforcement Discretion
ML20196H2782 December 1998Forwards Insp Repts 50-334/98-08 & 50-412/98-08 on 981026- 30.No Violations Noted.Plant Operations Witnessed by Team Were Conducted in Safe & Controlled Manner
ML20196H3052 December 1998Forwards Insp Repts 50-334/98-06 & 50-412/98-06 on 981004-1114.No Violations Noted.Conduct of Activities at Beaver Valley Power Station Facilities Characterized by Safe Plant OperationsEnforcement Discretion
Process Control Program
ML20196G9921 December 1998Forwards Ltrs from Fk Koob, to JW Pack & CF Wynne Re Plant Deficiencies Assessed During 981006 Exercise Against Hancock County,Wv & Beaver County,Pa,Respectively
ML20196D43725 November 1998Discusses Concerns Re Announced Asset Transfer Between Firstenergy Corp & Duquesne Light Co
ML20196A71024 November 1998Forwards Notice of Withdrawal of Amend to License NPF-73. Proposed Change Would Have Extended on one-time Only Basis, Surveillance Interval for TSs 4.8.1.1.1.b & 4.8.1.2 Until First Entry Into Mode 4 Following Seventh Refueling Outage
ML20195K33318 November 1998Informs That Effective 981214,DS Collins Will Become Project Manager for Beaver Valley Power Station,Units 1 & 2
IR 05000334/199800413 November 1998Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-334/98-04 & 50-412/98-04 Issued on 980915.C/As Will Be Examined During Future Insp of Licensed Program
ML20195J29412 November 1998Forwards Safety Evaluation Re First & Second 10-year Interval Inservice Insp Request for Relief
ML20155K4045 November 1998Forwards Insp Repts 50-334/98-07 & 50-412/98-07 on 981006- 07.No Violations Noted.Overall Performance of Emergency Response Organization Was Good
ML20155A38423 October 1998Forwards Insp Repts 50-334/98-05 & 50-412/98-05 on 980816-1003.Apparent Violations Being Considered for Escalated Enforcement ActionsEnforcement Discretion
ML20155B75721 October 1998Forwards Notice of 970310 Application for Amend to Licenses DPR-66 & NPF-73.Proposed Change Would Have Modified Facility TSs Pertaining to Repair of SG Tubes by Installation of Sleeves
ML20154R94320 October 1998Discusses Completion of Licensing Action for GL 96-01, Testing of Safety-Related Logic Circuits, . Ltrs & 981013 Provided Info Requested & Response Required by GL 96-01.TAC Closed
ML20154R87820 October 1998Forwards SE Accepting & Suppl , Requesting Approval of Proposed Changes in QA Organization Described in Chapter 17.2 of UFSAR
ML20154P72519 October 1998Forwards SE Re Second 10-yr Interval Inservice Insp Request for Relief RR-1-TYP-2-B5.40-1,Rev 0,for Plant,Unit 1
ML20154L27915 October 1998Ack Receipt of Which Responded to 971118 SE Re Relief Requests for Second 10-year IST Program for BVPS-2 (TAC M98909)
ML20154C6601 October 1998Forwards SE Re & Suppl Which Submitted Response to NRC 980406 RAI Re GL 92-08, Thermo-Lag 330-1 Fire Barriers, for Plant,Unit 2Fire Barrier
ML20153G07524 September 1998Informs of Individual Exam Results for Licensee Applicants on Inital Exam Conducted on 980917-21.Encl 1 Complete ES-501-2,encl 2 Contains Individual Results ES-303-1 & 303-2 & Encl 3 Copies of Ltrs Informing Applicants of Results
ML20153F73822 September 1998Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-334/98-03 & 50-412/98-03 Issued on 980805
ML20153F30718 September 1998Forwards SRO Licensing Operating Exams 50-334/98-301OL & 50-412/98-301OL Conducted During Wk of 980817-21.Rept Also Transmits Results of Insps Performed During Wk of 980803-06
ML20151Z31015 September 1998Forwards Insp Repts 50-334/98-04 & 50-412/98-04 on 980628-0815 & NOV Re Failure of Personnel to Establish Appropriate Controls When Addressing Excessive Unit 1 Turbine Driven Auxiliary Feedwater Pump Packing Leakage
ML20151X25711 September 1998Forwards Review of Beaver Valley Power Station,Unit 1 Cycle 13 Steam Generator Tube Insp 90-day Rept,Submitted on 980416.Staff Concluded That Util Implemented voltage-based Repair Criteria in Accordance W/Licensing Basis
ML20151W39610 September 1998Informs That Commission Assigned Two SRAs to Each Regional Ofc as Part of PRA Implementation Plan.T Shedlosky & J Trapp Are Region I SRAsProbabilistic Risk Assessment
ML20239A08131 August 1998Discusses Licensee 980812 Withdrawal of Proposed Rev 2F to BVPS-2 IST Program in Entirety.Extending Length of Time Between Refueling Outages Would Not Require Relief from IST Requirements
ML20237D64425 August 1998Responds to Util Comments on NRC 980531 SE Re Implementation of ATWS Rule.Based on Info & W Analysis for 50% Reactor Power,Nrc Finds Util Current Setpoint of 40% Turbine Load Acceptable & Determined That No Further Actions Required
ML20237E03624 August 1998Forwards Request for Addl Info Re GL 97-01, Degradation of Crdm/Cedm Nozzle & Other Vessel Closure Head Penetrations
ML20237D53621 August 1998Informs of Completion of Review of Dl Response to NRC GL 97-05, SG Tube Insp Techniques, Submitted on 980318. Reviewed Response & Did Not Identify Any Concerns W/Sg Insp Techniques Employed at Beaver Valley Power Station
ML20237B71817 August 1998Requests Addl Info Related to GL 97-04, Assurance of Sufficient Net Positive Suction Head for Emergency Core Cooling & Containment Heat Removal Pumps, for Beaver Valley Power Station,Unit 1
ML20237A76911 August 1998Forwards Request for Addl Info Re Licensee 980611 Submittal of New Pump Relief Request PRR-5 for Unit 1 Third 10-yr Interval Program for Inservice Testing of Pumps & Valves. Info Requested within 60 Days of Ltr Receipt
ML20236Y2637 August 1998Responds to Request from Boykan for Statistics on Allegations Received by NRC Re Beaver Valley.Encl Tables Provide Comparison to Allegations Received at Other Operating Sites for CY93-97 & First Seven Months of 1998
ML20236X8026 August 1998Requests Addl Info Re Proposed QA Organizational Changes for Plant
ML20236X8565 August 1998Forwards Insp Repts 50-334/98-03 & 50-412/98-03 on 980426-0627 & Novs.One Apparent Violation Was Identified & Being Considered for Escalated EASafe Shutdown
Enforcement Discretion
ML20236Y1294 August 1998Informs That Licensee Authorized to Administer Initial Written Exams to Mh Linch,Jp Scott,Pp Sena & KA Tiefenthal During Wk of 980817
ML20236V45228 July 1998Forwards RAI Re Response to GL 88-20,suppl 4,dtd 910628 Concerning Seismic & Fire Analyses in Ipeee.Response Requested within 60 Days of Receipt of LtrHot Short
Safe Shutdown
Boric Acid
Probabilistic Risk Assessment
Earthquake
ML20236J98724 June 1998First Final Response to FOIA Request for Documents.Documents Listed in App a Already Available in Pdr.Documents Listed in App B Being Released in Entirety
IR 05000334/199701118 June 1998Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-334/97-11 & 50-412/97-11 on 980317
IR 05000334/199808018 June 1998Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-334/98-80 & 50-412/98-80
IR 05000334/199800118 June 1998Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-334/98-01 & 50-412/98-01 on 980422
ML20249A35311 June 1998Discusses Response to Request for Interpretation of TS Requirements for Channel Calibr of Resistance Temp Detectors & Thermocouples
ML20248J9774 June 1998Discusses Completion of Licensing Action for GL 97-04, Assurance of Sufficient Net Positive Suction Head for ECC & Containment Heat Removal Pumps
ML20248L0393 June 1998Forwards Senior Reactor Operator Initial Exam Rept 50-334/98-300OL Conducted by NRC During Wk of 980420-24
ML20248J9442 June 1998Informs That Individual Exam Results for Applicants on Initial Exam Conducted on 980420-22 & 0518 at Facility completed.ES-501-2 & Individual Results of ES-303-1 & 303-2 Encl.W/O Encl
ML20248E7401 June 1998Forwards Request for Addl Info Re Review of Beaver Valley Power Station Unit 2,second 10-year Interval Inservice Insp Program Plan & Associated Relief RequestsIncorporated by reference
ML20248E94229 May 1998Advises of Planned Insp Effort Resulting from BVPS PPR Review.Insp Provided to Minimize Resource Impact on Staff & to Allow for Scheduling Conflicts & Personnel Availability to Be Resolved in Advance of Inspector Arrival OnsiteSystematic Assessment of Licensee Performance
IR 05000334/199800822 May 1998Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-334/98-08 & 50-412/98-08
IR 05000334/199800220 May 1998Forwards Insp Repts 50-334/98-02 & 50-412/98-02 on 980322- 0425.No Violations Noted
ML20216C2907 May 1998Refers to from Dl Which Identified Apparent Inconsistency Between NRC SE ( ) for BVPS-1 & BVPS-2 Re Implementation of ATWS Rule.Forwards RAI Re Applicability of W Technical Bulletin ESBU-TB-08
ML20217Q5774 May 1998Discusses Licensee 960510 Response to NRC Bulletin 96-002, Movement of Heavy Loads Over Spent Fuel,Over Fuel in Reactor Core,Or Over Safety-Related Equipment. Finds Response Acceptable & Closes TAC M95557 & TAC M95558Safe Shutdown
Control of Heavy Loads
IR 05000334/199700929 April 1998Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-334/97-09 & 50-412/97-09
ML20217F56422 April 1998Forwards Insp Repts 50-334/98-01 & 50-412/98-01 on 980208- 0321 & Notice of Violation Re Failure to Promptly Address Known TS Deficiency in Timely Manner
ML20217B01316 April 1998Forwards Request for Addl Info Re Review of Beaver Valley Power Station,Unit 1,third 10-year Interval Inservice Insp Program Plan & Associated Relief RequestsIncorporated by reference
ML20216G8918 April 1998Forwards RAI Re Util 950817 & 1117 Responses to GL 92-01,rev 1,Suppl 1, Reactor Vessel Structural Integrity. Response Requested within 90 Days of Receipt of Ltr
ML20217N1176 April 1998Informs That Licensee Provided Info Requested in GL 92-08, Thermo-Lag 330-1 Fire Barriers, Dtd 921217.However,there Remains Open Issues Involving Ampacity Derating of Thermo-Lag 330-1 Fire Barriers Protecting ConduitsFire Barrier
ML20217Q4343 April 1998Discusses Statement Re Responses to Violations to Be Submitted Under Oath or Affirmation & Noted in Insp Repts 50-334/97-11 & 50-412/97-11.Informs That Statement Noted Incorrectly in Repts Due to Administrative ErrorEnforcement Discretion
ML20217N8902 April 1998Forwards Revised Forms,Nrc form-398,personal Qualifications statement-licensee & NRC form-396,certification of Medical Exam by Facility LicenseeFitness for Duty
ML20217A13820 March 1998Requests Addl Info to Complete Review of Util Response to GL-96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions,
ML20217B97117 March 1998Forwards Insp Repts 50-334/97-11 & 50-412/97-11 on 971228- 980207 & NOV Re Failure to Log Applicable TS Limiting Conditions of Operation for Inoperable Reactor Trip Channels During 980121 Startup.Security Program Was Also InspectedEnforcement Discretion
ML20216E7879 March 1998Forwards Insp Repts 50-334/98-80 & 50-412/98-80 on 980105-0212 & Notice of Violation.Insp Included Evaluation of 10CFR50.59 Safety Evaluation Program for Preparing SE Relating to Changes,Tests or Experiments at PlantEnforcement Discretion
ML20216B2524 March 1998Forwards RAI Re Summary Rept Concerning Verification of Seismic Adequacy of Mechanical & Electrical Equipment for Plant,Unit 1.Response Requested within 90 Days of Receipt of Ltr
ML20216E24727 February 1998Advises of Change in Scheduled Completion Date to 980401 for Commitment for Conducting Evaluation of Adequacy of Surveillance Procedures That Implement TS Requirements to Ensure That Procedures Properly Implemented Testing