Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
IR 05000412/1999007 | 21 October 1999 | Refers to Special Team Insp 50-412/99-07 Conducted from 990720-29 & Forwards Nov.Two Violations Identified.First Violation Involved Failure to Implement C/A to Prevent Biofouling of Service Water System | Zebra Mussel Biofouling |
ML20217M159 | 19 October 1999 | Forwards NRC Rept Number 17, Requal Tracking Rept from Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Requal Pass Dates | |
ML20217C674 | 8 October 1999 | Forwards RAI Re Licensee 970128 Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions, . Response Requested within 60 Days of Receipt of Ltr | |
ML20217E030 | 7 October 1999 | Forwards Insp Repts 50-334/99-06 & 50-412/99-06 on 990809-13 & 990823-27.Violation Noted Involving Failure to Correctly Translate Design Change Re Pertinent Operating Logs & Plant Equipment Labeling | |
ML20212M266 | 30 September 1999 | Forwards Order Approving Transfer of Licenses for Beaver Valley from Dlc to Pennsylvania Power Co & Approving Conforming Amends in Response to 990505 Application | |
ML20216J962 | 30 September 1999 | Forwards Insp Repts 50-334/99-05 & 50-412/99-05 on 990725-0904.Two Violations Noted & Being Treated as Ncvs.One Violation Re Failure to Follow Operation Manual Procedure Associated with Configuration Control Identified | |
ML20212K807 | 30 September 1999 | Informs That on 990916,NRC Staff Completed mid-cycle Plant Performance Review (PPR) of Facility.Staff Conducted Reviews of All Operating NPPs to Integrate Performance Info & to Plan for Insp Activities at Facility | Biofouling |
ML20211Q343 | 8 September 1999 | Informs That During 990903 Telcon Between L Briggs & T Kuhar,Arrangements Were Made for NRC to Inspect Licensed Operator Requalification Program at Plant,Unit 1.Insp Planned for Wk of 991115 | |
ML20211Q560 | 7 September 1999 | Forwards Insp Rept 50-412/99-07 on 990720-29.Three Apparent Violations Noted & Being Considered for Escalated Ea. Violations Involve Failure to Implement C/As to Prevent bio- Fouling of Svc Water Sys | Biofouling |
ML20211A511 | 18 August 1999 | Forwards Insp Repts 50-334/99-04 & 50-412/99-04 on 990613- 990724.One Violation Noted & Treated as Non-Cited Violation Involved Failure to Maintain Containment Equipment Hatch Closed During Fuel Movement | |
ML20209G570 | 12 July 1999 | Discusses Closure of TACs MA0525 & MA0526 Re Response to RAI Concerning GL 92-0,Rev 1,Suppl 1, Rv Structural Integrity. Info in Rvid Revised & Released as Ver 2 as Result of Review of Response | |
ML20207H662 | 8 July 1999 | Forwards RAI Re Util 981112 Response to IPEEE Evaluations for Plant,Units 1 & 2.RAI Was Discussed During 990628 Telcon in Order to Ensure Clear Consistent Understanding by All Parties of Info Needed | High winds Design basis earthquake |
ML20209D819 | 7 July 1999 | Forwards Insp Repts 50-334/99-03 & 50-412/99-03 on 990502- 0612.No Violations Noted.Program for Maintaining Occupational Exposures as Low as Reasonably Achievable (ALARA) & for Training Personnel,Generally Effective | |
ML20207G261 | 7 June 1999 | Informs That NRR Has Reorganized,Effective 990328.Forwards Organizational Chart | Enforcement Discretion |
IR 05000412/1998009 | 26 May 1999 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-412/98-09 | |
ML20195C446 | 21 May 1999 | Forwards Insp Repts 50-334/99-02 & 50-412/99-02 on 990321-0501.No Violations Were Identified.Licensee Conduct of Activities at Beaver Valley Power Station Characterized by Safe Conduct of Activities During Refueling Outage | |
ML20206P124 | 14 May 1999 | Refers to Proposed Changes Submitted by Dl on 990316 to BVPS QA Program Described in BVPS-2 Ufsar,Chapter 17.2.Forwards RAI Re Proposed QA Program Changes | |
ML20206N316 | 6 May 1999 | Responds to Ltr to NRC on Continued Events Re Transfer of Generation Assets Between Dl & Firstenergy.Info Will Be Considered as NRC Monitor Pending License Transfer Application of Bvps,Units 1 & 2 & Pnpp | |
ML20206H793 | 30 April 1999 | Ack Receipt of 990426 Request for Enforcement Discretion & 990427 Withdrawal of Request for Enforcement Discretion. Resolution Documented.Enforcement Discretion Not Necessary | Enforcement Discretion Probabilistic Risk Assessment Earthquake |
ML20206B275 | 22 April 1999 | Forwards Insp Repts 50-334/99-01 & 50-412/99-01 on 990207- 0320.One Violation of NRC Requirements Identified & Being Treated as non-cited Violation Consistent with App C of Enforcement Policy | |
ML20206A838 | 20 April 1999 | Forwards Reactor Operator Initial Exam Rept 50-412/99-301 on 990322-25.All Three Reactor Operator Applicants Passed. Initial Written Exam Submittal Was Determined Not to Meet NRC Guidelines in Certain Instances | |
ML20205R907 | 20 April 1999 | Forwards Second Request for Addl Info Re Response to GL 95-07, Pressure-Locking & Thermal-Binding of Safety-Related Power-Operated Gate Valves, for Beaver Valley Power Station,Units 1 & 2 | |
ML20205Q831 | 14 April 1999 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-334/98-11 & 50-412/98-11 Issued on 990225.Actions Will Be Examined During Future Insp of Licensed Program | Condition Adverse to Quality |
ML20205P243 | 9 April 1999 | Discusses 990225 PPR & Forwards Plant Issues Matrix & Insp Plan.Ltr Provided to Minimize Resource Impact on Staff & to Allow for Scheduling Conflicts & Personnel Availability to Be Resolved in Advance of Inspector Arrival | Systematic Assessment of Licensee Performance Maintenance Rule Program Fire Protection Program |
ML20205L034 | 9 April 1999 | Forwards SER Accepting Util 971209 & 980729 Submittal of Second 10-year Interval ISI Program Plan & Associated Relief Requests for Beaver Valley Power Station,Unit 2.TER Also Encl | |
ML20205K090 | 5 April 1999 | Informs of Individual Exam Result on Initial Retake Exam Conducted on 990322-25 at Licensee Facility.Three Individuals Were Administered Exam & All Three Passed. Forwards Encl Re Exam.Without Encl | |
ML20205R179 | 30 March 1999 | Responds to Issue Re Generic Implication of part-length Control Rod Drive Mechanism Housing Leak at Praire Island, Unit 2 & Beaver Valley Power Station,Units 1 & 2 | Non-Destructive Examination Hydrostatic Probabilistic Risk Assessment Operating Basis Earthquake Earthquake Pressure boundary leak |
ML20205C030 | 26 March 1999 | Informs That Util Responses to GL 97-04, Assurance of Sufficient Net Positive Suction Head for Emergency Core Cooling & Containment Heat Removal Pumps Acceptable | |
ML20204D737 | 16 March 1999 | Advises That RW Lindsey Authorized to Administer Initial Written Exams to Sh Cencic,Tf Lardin & Ta Pittas on 990322. Region I Operator Licensing Staff Will Administer Operating Tests | |
ML20207E020 | 25 February 1999 | Forwards Insp Repts 50-334/98-11 & 50-412/98-11 on 981227- 990206 & Forwards Notice of Violations Re Uncontrolled Reduction of Main Condenser Vacuum | Maintenance Rule Program |
ML20203D069 | 10 February 1999 | Forwards SE Accepting Approval of Proposed Revs to Plant QA Program Description in Chapter 17.2 of Updated Fsar,Per Util 981224 Submittal | |
ML20206U301 | 5 February 1999 | Forwards Insp Repts 50-334/98-09 & 50-412/98-09 on 981116-1217 & Nov.Violation Identified Re Inadequate Design Control in Unit 2 Dc Voltage Drop Calculation | |
ML20203A081 | 4 February 1999 | Forwards Request for Addl Info Re Review of Beaver Valley Power Station,Unit 1 License Amend to Allow one-time Extension of Steam Generator Insp Interval | |
ML20199E668 | 14 January 1999 | Forwards RAI Re Licensee Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs, for Plant,Units 1 & 2 | Probabilistic Risk Assessment |
ML20199F196 | 13 January 1999 | Forwards Insp Repts 50-334/98-10 & 50-412/98-10 on 981115-1226.No Violations Noted.Informs That Overall Fire Protection Program Functioning Well | Fire Protection Program |
ML20199F510 | 29 December 1998 | Discusses Third 10-year Interval ISI Program Plan & Associated Relief Requests for BVPS-1 Submitted by Dlc on 970917 & 980618.Informs That NRC Has Adopted Ineel Recommendations in TER INEEL-98-00893.Forwards SE & TER | |
ML20198K591 | 24 December 1998 | Forwards Emergency Response Data Sys Implementation Documents Which Include Data Point Library Updates for Fermi (Number 268),Peach Bottom (Number 269) & Beaver Valley (Number 270).Without Encls | |
ML20198K825 | 21 December 1998 | Forwards SER Granting Licensee 980611,as Suppl 981015 Pump Relief Request PRR-5 for Third 10-year IST Interval for Beaver Valley Power Station,Unit 1 Pursuant 10CFR50.55(a)(f)(6)(i) | |
ML20198A130 | 9 December 1998 | Forwards SE Re USI A-46 Program Implentation for Plant Unit 1.Staff Concludes Program Implementation Met Purpose & Intent of Criteria in Generic Implementation Procedure 2 & Suppl SER 2 for Resolution of USI A-46 | |
ML20198B130 | 9 December 1998 | Advises of Planned Insp Effort Resulting from Beaver Valley Power Station mid-year Insp Resource Planning Meeting Held on 981110.Historical Listing of Plant Issues & Details of Insp Plan for Next 6 Months Encl | Shutdown Margin Enforcement Discretion Fire Protection Program |
ML20196J276 | 4 December 1998 | Forwards Corrected Pages 17 & 18 of NRC Integrated Insp Repts 50-334/98-06 & 50-412/98-06 for Exercise of Enforcement Discretion | Enforcement Discretion |
ML20196H278 | 2 December 1998 | Forwards Insp Repts 50-334/98-08 & 50-412/98-08 on 981026- 30.No Violations Noted.Plant Operations Witnessed by Team Were Conducted in Safe & Controlled Manner | |
ML20196H305 | 2 December 1998 | Forwards Insp Repts 50-334/98-06 & 50-412/98-06 on 981004-1114.No Violations Noted.Conduct of Activities at Beaver Valley Power Station Facilities Characterized by Safe Plant Operations | Enforcement Discretion Process Control Program |
ML20196G992 | 1 December 1998 | Forwards Ltrs from Fk Koob, to JW Pack & CF Wynne Re Plant Deficiencies Assessed During 981006 Exercise Against Hancock County,Wv & Beaver County,Pa,Respectively | |
ML20196D437 | 25 November 1998 | Discusses Concerns Re Announced Asset Transfer Between Firstenergy Corp & Duquesne Light Co | |
ML20196A710 | 24 November 1998 | Forwards Notice of Withdrawal of Amend to License NPF-73. Proposed Change Would Have Extended on one-time Only Basis, Surveillance Interval for TSs 4.8.1.1.1.b & 4.8.1.2 Until First Entry Into Mode 4 Following Seventh Refueling Outage | |
ML20195K333 | 18 November 1998 | Informs That Effective 981214,DS Collins Will Become Project Manager for Beaver Valley Power Station,Units 1 & 2 | |
IR 05000334/1998004 | 13 November 1998 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-334/98-04 & 50-412/98-04 Issued on 980915.C/As Will Be Examined During Future Insp of Licensed Program | |
ML20195J294 | 12 November 1998 | Forwards Safety Evaluation Re First & Second 10-year Interval Inservice Insp Request for Relief | |
ML20155K404 | 5 November 1998 | Forwards Insp Repts 50-334/98-07 & 50-412/98-07 on 981006- 07.No Violations Noted.Overall Performance of Emergency Response Organization Was Good | |
ML20155A384 | 23 October 1998 | Forwards Insp Repts 50-334/98-05 & 50-412/98-05 on 980816-1003.Apparent Violations Being Considered for Escalated Enforcement Actions | Enforcement Discretion |
ML20155B757 | 21 October 1998 | Forwards Notice of 970310 Application for Amend to Licenses DPR-66 & NPF-73.Proposed Change Would Have Modified Facility TSs Pertaining to Repair of SG Tubes by Installation of Sleeves | |
ML20154R943 | 20 October 1998 | Discusses Completion of Licensing Action for GL 96-01, Testing of Safety-Related Logic Circuits, . Ltrs & 981013 Provided Info Requested & Response Required by GL 96-01.TAC Closed | |
ML20154R878 | 20 October 1998 | Forwards SE Accepting & Suppl , Requesting Approval of Proposed Changes in QA Organization Described in Chapter 17.2 of UFSAR | |
ML20154P725 | 19 October 1998 | Forwards SE Re Second 10-yr Interval Inservice Insp Request for Relief RR-1-TYP-2-B5.40-1,Rev 0,for Plant,Unit 1 | |
ML20154L279 | 15 October 1998 | Ack Receipt of Which Responded to 971118 SE Re Relief Requests for Second 10-year IST Program for BVPS-2 (TAC M98909) | |
ML20154C660 | 1 October 1998 | Forwards SE Re & Suppl Which Submitted Response to NRC 980406 RAI Re GL 92-08, Thermo-Lag 330-1 Fire Barriers, for Plant,Unit 2 | Fire Barrier |
ML20153G075 | 24 September 1998 | Informs of Individual Exam Results for Licensee Applicants on Inital Exam Conducted on 980917-21.Encl 1 Complete ES-501-2,encl 2 Contains Individual Results ES-303-1 & 303-2 & Encl 3 Copies of Ltrs Informing Applicants of Results | |
ML20153F738 | 22 September 1998 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-334/98-03 & 50-412/98-03 Issued on 980805 | |
ML20153F307 | 18 September 1998 | Forwards SRO Licensing Operating Exams 50-334/98-301OL & 50-412/98-301OL Conducted During Wk of 980817-21.Rept Also Transmits Results of Insps Performed During Wk of 980803-06 | |
ML20151Z310 | 15 September 1998 | Forwards Insp Repts 50-334/98-04 & 50-412/98-04 on 980628-0815 & NOV Re Failure of Personnel to Establish Appropriate Controls When Addressing Excessive Unit 1 Turbine Driven Auxiliary Feedwater Pump Packing Leakage | |
ML20151X257 | 11 September 1998 | Forwards Review of Beaver Valley Power Station,Unit 1 Cycle 13 Steam Generator Tube Insp 90-day Rept,Submitted on 980416.Staff Concluded That Util Implemented voltage-based Repair Criteria in Accordance W/Licensing Basis | |
ML20151W396 | 10 September 1998 | Informs That Commission Assigned Two SRAs to Each Regional Ofc as Part of PRA Implementation Plan.T Shedlosky & J Trapp Are Region I SRAs | Probabilistic Risk Assessment |
ML20239A081 | 31 August 1998 | Discusses Licensee 980812 Withdrawal of Proposed Rev 2F to BVPS-2 IST Program in Entirety.Extending Length of Time Between Refueling Outages Would Not Require Relief from IST Requirements | |
ML20237D644 | 25 August 1998 | Responds to Util Comments on NRC 980531 SE Re Implementation of ATWS Rule.Based on Info & W Analysis for 50% Reactor Power,Nrc Finds Util Current Setpoint of 40% Turbine Load Acceptable & Determined That No Further Actions Required | |
ML20237E036 | 24 August 1998 | Forwards Request for Addl Info Re GL 97-01, Degradation of Crdm/Cedm Nozzle & Other Vessel Closure Head Penetrations | |
ML20237D536 | 21 August 1998 | Informs of Completion of Review of Dl Response to NRC GL 97-05, SG Tube Insp Techniques, Submitted on 980318. Reviewed Response & Did Not Identify Any Concerns W/Sg Insp Techniques Employed at Beaver Valley Power Station | |
ML20237B718 | 17 August 1998 | Requests Addl Info Related to GL 97-04, Assurance of Sufficient Net Positive Suction Head for Emergency Core Cooling & Containment Heat Removal Pumps, for Beaver Valley Power Station,Unit 1 | |
ML20237A769 | 11 August 1998 | Forwards Request for Addl Info Re Licensee 980611 Submittal of New Pump Relief Request PRR-5 for Unit 1 Third 10-yr Interval Program for Inservice Testing of Pumps & Valves. Info Requested within 60 Days of Ltr Receipt | |
ML20236Y263 | 7 August 1998 | Responds to Request from Boykan for Statistics on Allegations Received by NRC Re Beaver Valley.Encl Tables Provide Comparison to Allegations Received at Other Operating Sites for CY93-97 & First Seven Months of 1998 | |
ML20236X802 | 6 August 1998 | Requests Addl Info Re Proposed QA Organizational Changes for Plant | |
ML20236X856 | 5 August 1998 | Forwards Insp Repts 50-334/98-03 & 50-412/98-03 on 980426-0627 & Novs.One Apparent Violation Was Identified & Being Considered for Escalated EA | Safe Shutdown Enforcement Discretion |
ML20236Y129 | 4 August 1998 | Informs That Licensee Authorized to Administer Initial Written Exams to Mh Linch,Jp Scott,Pp Sena & KA Tiefenthal During Wk of 980817 | |
ML20236V452 | 28 July 1998 | Forwards RAI Re Response to GL 88-20,suppl 4,dtd 910628 Concerning Seismic & Fire Analyses in Ipeee.Response Requested within 60 Days of Receipt of Ltr | Hot Short Safe Shutdown Boric Acid Probabilistic Risk Assessment Earthquake |
ML20236J987 | 24 June 1998 | First Final Response to FOIA Request for Documents.Documents Listed in App a Already Available in Pdr.Documents Listed in App B Being Released in Entirety | |
IR 05000334/1997011 | 18 June 1998 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-334/97-11 & 50-412/97-11 on 980317 | |
IR 05000334/1998080 | 18 June 1998 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-334/98-80 & 50-412/98-80 | |
IR 05000334/1998001 | 18 June 1998 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-334/98-01 & 50-412/98-01 on 980422 | |
ML20249A353 | 11 June 1998 | Discusses Response to Request for Interpretation of TS Requirements for Channel Calibr of Resistance Temp Detectors & Thermocouples | |
ML20248J977 | 4 June 1998 | Discusses Completion of Licensing Action for GL 97-04, Assurance of Sufficient Net Positive Suction Head for ECC & Containment Heat Removal Pumps | |
ML20248L039 | 3 June 1998 | Forwards Senior Reactor Operator Initial Exam Rept 50-334/98-300OL Conducted by NRC During Wk of 980420-24 | |
ML20248J944 | 2 June 1998 | Informs That Individual Exam Results for Applicants on Initial Exam Conducted on 980420-22 & 0518 at Facility completed.ES-501-2 & Individual Results of ES-303-1 & 303-2 Encl.W/O Encl | |
ML20248E740 | 1 June 1998 | Forwards Request for Addl Info Re Review of Beaver Valley Power Station Unit 2,second 10-year Interval Inservice Insp Program Plan & Associated Relief Requests | Incorporated by reference |
ML20248E942 | 29 May 1998 | Advises of Planned Insp Effort Resulting from BVPS PPR Review.Insp Provided to Minimize Resource Impact on Staff & to Allow for Scheduling Conflicts & Personnel Availability to Be Resolved in Advance of Inspector Arrival Onsite | Systematic Assessment of Licensee Performance |
IR 05000334/1998008 | 22 May 1998 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-334/98-08 & 50-412/98-08 | |
IR 05000334/1998002 | 20 May 1998 | Forwards Insp Repts 50-334/98-02 & 50-412/98-02 on 980322- 0425.No Violations Noted | |
ML20216C290 | 7 May 1998 | Refers to from Dl Which Identified Apparent Inconsistency Between NRC SE ( ) for BVPS-1 & BVPS-2 Re Implementation of ATWS Rule.Forwards RAI Re Applicability of W Technical Bulletin ESBU-TB-08 | |
ML20217Q577 | 4 May 1998 | Discusses Licensee 960510 Response to NRC Bulletin 96-002, Movement of Heavy Loads Over Spent Fuel,Over Fuel in Reactor Core,Or Over Safety-Related Equipment. Finds Response Acceptable & Closes TAC M95557 & TAC M95558 | Safe Shutdown Control of Heavy Loads |
IR 05000334/1997009 | 29 April 1998 | Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-334/97-09 & 50-412/97-09 | |
ML20217F564 | 22 April 1998 | Forwards Insp Repts 50-334/98-01 & 50-412/98-01 on 980208- 0321 & Notice of Violation Re Failure to Promptly Address Known TS Deficiency in Timely Manner | |
ML20217B013 | 16 April 1998 | Forwards Request for Addl Info Re Review of Beaver Valley Power Station,Unit 1,third 10-year Interval Inservice Insp Program Plan & Associated Relief Requests | Incorporated by reference |
ML20216G891 | 8 April 1998 | Forwards RAI Re Util 950817 & 1117 Responses to GL 92-01,rev 1,Suppl 1, Reactor Vessel Structural Integrity. Response Requested within 90 Days of Receipt of Ltr | |
ML20217N117 | 6 April 1998 | Informs That Licensee Provided Info Requested in GL 92-08, Thermo-Lag 330-1 Fire Barriers, Dtd 921217.However,there Remains Open Issues Involving Ampacity Derating of Thermo-Lag 330-1 Fire Barriers Protecting Conduits | Fire Barrier |
ML20217Q434 | 3 April 1998 | Discusses Statement Re Responses to Violations to Be Submitted Under Oath or Affirmation & Noted in Insp Repts 50-334/97-11 & 50-412/97-11.Informs That Statement Noted Incorrectly in Repts Due to Administrative Error | Enforcement Discretion |
ML20217N890 | 2 April 1998 | Forwards Revised Forms,Nrc form-398,personal Qualifications statement-licensee & NRC form-396,certification of Medical Exam by Facility Licensee | Fitness for Duty |
ML20217A138 | 20 March 1998 | Requests Addl Info to Complete Review of Util Response to GL-96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions, | |
ML20217B971 | 17 March 1998 | Forwards Insp Repts 50-334/97-11 & 50-412/97-11 on 971228- 980207 & NOV Re Failure to Log Applicable TS Limiting Conditions of Operation for Inoperable Reactor Trip Channels During 980121 Startup.Security Program Was Also Inspected | Enforcement Discretion |
ML20216E787 | 9 March 1998 | Forwards Insp Repts 50-334/98-80 & 50-412/98-80 on 980105-0212 & Notice of Violation.Insp Included Evaluation of 10CFR50.59 Safety Evaluation Program for Preparing SE Relating to Changes,Tests or Experiments at Plant | Enforcement Discretion |
ML20216B252 | 4 March 1998 | Forwards RAI Re Summary Rept Concerning Verification of Seismic Adequacy of Mechanical & Electrical Equipment for Plant,Unit 1.Response Requested within 90 Days of Receipt of Ltr | |
ML20216E247 | 27 February 1998 | Advises of Change in Scheduled Completion Date to 980401 for Commitment for Conducting Evaluation of Adequacy of Surveillance Procedures That Implement TS Requirements to Ensure That Procedures Properly Implemented Testing |