ML20216E247

From kanterella
Jump to navigation Jump to search
Advises of Change in Scheduled Completion Date to 980401 for Commitment for Conducting Evaluation of Adequacy of Surveillance Procedures That Implement TS Requirements to Ensure That Procedures Properly Implemented Testing
ML20216E247
Person / Time
Site: Beaver Valley  FirstEnergy icon.png
Issue date: 02/27/1998
From: Neil Perry
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Jain S
DUQUESNE LIGHT CO.
References
NUDOCS 9803170450
Download: ML20216E247 (2)


Text

<

r l February 27, 1998 l Mr. S. C. Jain Vice Prr.sident, Nuclear Services l Generat%n Group Duquesne Light Company Post Office Box 4 Shippingport, Pennsylvania 15077

SUBJECT:

CHANGE IN SCHEDULED COMPLETION DATE FOR COMMITMENT

Dear Mr. Jain:

This letter refers to your January 30,1998, correspondence describing your need to extend the completion date for conducting an evaluation of the adequacy of surveillance procedures that implement technical specification requirements to ensure that the procedures properly implemented the required testing. The new completion date established is April 1,1998. The NRC Region I acknowledges this commitment date l extension. However, in the future, we would appreciate it if you would make us aware of the need and justification for extensions prior to the week originally committed to.

1 Your cooperation with us is appreciated.

Sincerely,

/

t Neil S. Perry, Acting Branch Chief Project Branch No. 7 Division of Reactor Projects Docket Nos. 50-334;50-412 cc w/ encl:

R. LeGrand, Division Vice President, Nuclear Operations Group & Plant Manager W. Kline, Manager, Nuclear Engineering Department

B. Tuite, General Manager, Nuclear Operations Unit l

M. Pergar, Acting Manager, Quality Services Unit J. Arias, Director, Safety & Licensing Department J. MacDonald, Manager, System and Performance Engineering M. Clancy, Mayor Ccmmonwealth of Pennsylvania i State of Ohio State of West Virginia 'fk l O

" I 7 f)() v v-9803170450 980227 Il Il

{llgllllllllililllllullllllull lig PDR ADOCK 05000334 5 Im m t P PDR

''u '

4 Mr. S. C. Jain 2 Distribution w/ encl:

Region 1 Docket Room (with concurrences)

PUBLIC Nuclear Safety Information Center (NSIC)

NRC Resident inspector W. Axelson, DRA N. Perry, DRP D. Haverkamp, DRP A. Linde, DRP J. Stolz, PDI-2, NRR ,

D. Brinkman, PM, PDI-2, NRR  !

B. McCabe, OEDO i R. Correia, NRR I F. Talbot, NRR DOCDESK ,

inspection Program Branch, NRR (IPAS)

DOCUMENT NAME: G:\ BRANCH 7\BVREP.WPD Ta receive a copy of this document. Indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy with attachment / enclosure "N" = No copy 0FFICE RI/DRP l/ / l / l l l NAME NPerry v/V DATE 02/-sl!!i/98 02/ /98 02/ /98 02/ /98 02/ /98 F 0FFICIAL RECORD COPY

(._ ..

  • V ey Power Station i

ShWpingport PA 1$077 0004 l

SUSHIL C.JAIN M12) 303 $$12

@,,a g"*a' January 30,1998 Fax Hit) 643 8069 l

""'a' 'a** o**a L-98-024 l

l U. S. Nuclear Regulatory Commission Attention: Document Control Desk l Washington, DC 20555-0001 1

Subject:

Beaver Valley Power Station, Unit No.1 and No. 2 i BV-1 Docket No. 50-334, License No. DPR-66 i BV-2 Docket No. 50-412, License No. NPF-73 Change in Scheduled Completion Date for Commitment

References:

BV-1, LER 97-011-00 dated June 9,1997 BV-2, LER 97-003-00 dated June 20,1997' BV-1, LER 97-013-00 dated July 10,1997 l BV-1, LER 97-014-00 dated July 10,1997 Reply to Notice of Violation EA 97-255 dated August 1,1997 i PV-1, LER 97-026-00 dated September 12,1997 i BV-1, LER 97-028 00 dated September 24,1997 l BV 1, LER 97-030-00 dated October 8,1997 l BV-1, LER 97 036-00 dated December 12,1997 In the correspondence referenced above, Duquesne Light Company (DLC)

! committed to conduct an evaluation of the adequacy of surveillance procedures that implement technical specification requirements to ensure that the procedures properly implemented the required testing. The schedule provided for the completion of this

evaluation, including appropriate procedure revisions was January 30, 1998. The majority of this effort has been completed, however, additional reviews remain to be completed. Recent findings durmg these reviews warrant the extension of scope and the need to extend the completion of this action to April 1,1998. Based on the fact that following the performance of surveillances that resulted from this review, equipment operability was found acceptable, DLC believes that the extension request does not represent a challenge to plant safety.

DELIVERING

! QUAlliY ENEIGY q-50'&900o-M gpp

- e eenesraws v%s

\

Beaver Valley P wcr Station, Unit No. I and No. 2 Change in Scheduled Completion Date for Commitment Page 2 .,

The need and justification for this extension request has been discussed with NRC l Region I staff.

If there are any questions concerning this matter, please contact Mr. J. Arias, Director, Safety & Licensing at (412) 393-5203.

Sincerely, l

A - >_- 1 0_ y Sushil C. Jam l

c: Mr. D. S. Brinkman, Sr. Project Manager Mr. D. M. Kern, Sr. Resident Inspector j Mr. H. J. Miller, NRC Region I Administrator I

\

J 4

l I

1 TOTAL P.03

[