7 4
August 11, 1998 hw L Mr. J. E. Cross President-Generation Group
.m Duquesne Ught Company.
Post Office Box 4 -
iSh pingport, PA 15077
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION (RAI) REGARDING REVIEW Ol' BEAVER VALLEY POWER STATION, UNIT NO.1 (BVPS-1) INSERVICE TESTING PROGRAM RELIEF REQUEST PRR-5 (TAC NO. MA2114)
' ear Mr. Cross:-
D i
By letter dated June 11,1998, Duquesne Light Company (DLC) submitted a new pump relief l request PRR-5 for the BVPS-1 third 10-year interval program for inservice testing of pumps and valves. The NRC staff is reviewing and evaluating the subject relief request. The NRC staff has.
determined that additionalinformation is required from DLC to complete the review. The
. required additional information is identified in the enclosed RAl. DLC is requested to provide the
' additional information within 60 days of receipt of this letter so that the NRC staff may complete its review within a timely manner, Should you have a question on this matter, please contact me at (301) 415-1409.
Sincerely,
/S/
Donald S. Brinkman, Senior Project Manager Project Directorate 1-2 Division of Reactor Projects - 1/II Office of Nuclear Reactor Regulation Docket No. 50-334 M
Enclosure:
RAI cc w/ encl: See next page DISTRIBUTION Docket File.
PUBLIO.
PDI-2 Reading iJZwolinski RCapra.
DBrinkman -
MO'Brien,
OGC.
h f
.ACRS:
- KDempsey I
DTermo '
pf 0)
~
RWessman -
MEvans,- RGN-l OFFICE PDI-2/PM Njli PDA$[hb PDI-2/D
._ m -
y 'efu; y '
NAME-DBrinkman:rb '
MO'Brien RCapra p
DATE -'
I/~7/98-.
$/9/98" 8 /It'198
- OFFICIAL RECORD COPY
[h-DOCUMENT NAME:- BV2114.RAl -
i$p$d brcWr~* T"jy e
q
.e b
i 9808170088 990811 lt POR. ADOCK.05000334 P
. POR o
.c
'N 1
3 6
UNITED STATES j
j NUCLEAR REGULATORY COMMISSION
%,.....[*
P84sHINGToN. D.C. 2066dL4001 August 11, 1998 Mr. J. E. Cross President - Generation Group Duquesne Light Company Post Office Box 4 Shippingport, PA 15077
SUBJECT:
REQUEST FOR ADDITIONAL INFORMATION (RAl) REGARDING REVIEW OF BEAVER VALLEY POWER STATION, UNIT NO.1 (BVPS-1) INSERVICE TESTING PROGRAM RELIEF REQUEST PRR-5 (TAC NO. MA2114)
Dear Mr. Cross:
By letter dated June 11,1998, Duquesne Light Company (DLC) submitted a new pump relief request PRR-5 for the BVPS-1 third 10-year interval program for inservice testing of pumps and valves. The NRC staffis reviewing and evaluating the subject relief request. The NRC staff has determined that additionalinformation is required from DLC to complete the review. The required additionalinformation is identified in the enclosed RAl. DLC is requested to provide the additionalinformation within 60 days of receipt of this letter so that the NRC staff may complete its review within a timely manner.
Should you have a question on this matter, please contact me at (301) 415-1409.
Sincerely, ht h.
Donald S. Brinkman, Se7ior Project Manager Project Directorate 1-2 Division of Reactor Projects - 1/11 office cf Nuclear Reactor Regulation Docket No. 50-334
Enclosure:
RAI cc w/ encl: See next page
I w
i J. E. Cross Beaver Valle' sower Station, Units 1 & 2 Duquesne Light Company cc:
Jay E. Silberg, Esquire Bureau of Radiation Protection Shaw, Pittman, Potts & Trowbridge Pennsylvania Department of 2300 N Street, NW.
Environmental Resources Washington, DC 20037 ATTN: Michael P. Murphy Post Office Box 2063 Director-Safety and Licensing Harrisburg, PA 17120 Department (BV-A) j
)
Duquesne Light Company Mayor of the Borrough of j
Beaver Valley Power Station Shippingport i
PO Box 4 Post Office Box 3 Shippingport, PA 15077 Shippingport, PA 15077 Commissioner Roy M. Smith Regional Administrator, Region i West Virginia Departmen'.of Labor U.S. Nuclear Regulatory Commission Building 3, Room 319 475 Allendate Road Capitol Complex King of Prussia, PA 19406 Charleston, WVA 25305 Resident inspector Director, Utilities Department U.S. Nuclear Regulatory Commission Public Utilities Commission Post Office Box 298 180 East Broad Street Shippingport, PA 15077 Columbus, OH 43266-0573 Director, Pennsylvania Emergency Duquesne Light Company Management Agency Beaver Valley Power Statien Post Office Box 3321 PO Box 4 Harrisburg, PA 17105-3321 Shippingport, PA 15077 ATTN: S. C. Jain, Vice President Ohio EPA-DERR Nuclear Services (BV-A)
ATTN: Zack A. Clayton Post Office Box 1049 Mr. J. A. Hultz, Manager Columbus, OH 43266-0149 Projects & Support Services First Energy Dr. Judith Johnsrud 76 South Main Street National Energy Committee Akron, OH 44308 Sierra Club 433 Orlando Avenue State College, PA 16803 Duquesne Light Company Beaver Valley Power Station PO Box 4 Shippingport, PA 15077 ATTN: R. L. Grand, Division Vice President, Nuclear Operations Group and Plant Manager (BV-SOSB-7) t t
n
.d REQUEST FOR ADDITIONAL INFORMATION RELIEF REQUEST PRR-5 FOR THIRD 10-YEAR INSERVICE TESTING flST) INTERVAL BEAVER val I NY POWER STATION. UNIT NO.1 DOCKET NO. 50-334
- 1. Regulatory Guide 1.26, " Quality Group Classifications and Standards for Water, Steam, and Radioactive-Waste-Containing Components of Nuclear Power Plants," provirles guidance on classification of equipment according to national standards (e.g., the ASME Code).
Section 2.2 of NUREG-1482 discusses the scope of the IST program and specifically lists the diesel fuel oil system identified in PRR 5 as being outside the scope of Regulatory i
Guide 1.26. Discuss the applicability of the above guidelines with regard to whether the pumps identilled in this relief request are outside the scope of the IST program.
j
- 2. Section 3.4 of NUREG-1482 states that testing of a major component is an acceptable means of testing a component subassembly; however, the licensee is responsible for establishing the basis for the adequacy of the testing for assuring the operational readiness of the component subassemblies. For PRR-5, address (1) whether the diesel generator and j
the diesel fuel oil transfer pumps can be considered as the major component and the component subassemblies, respectively, and (2) the applicability of NRC guidelines in Section 3.4 of NUREG-1482 for the pumps in this relief request.
I ENCLOSURE i