ML20206S145

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-298/87-06
ML20206S145
Person / Time
Site: Cooper Entergy icon.png
Issue date: 04/17/1987
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Trevors G
NEBRASKA PUBLIC POWER DISTRICT
References
NUDOCS 8704220343
Download: ML20206S145 (2)


See also: IR 05000298/1987006

Text

-.

'. ( '

-

'

APR 17 US

In Reply Refer To:

Docket: 50-298/87-06

4

Nebraska Public Power District .

ATTN: George A. Trevors

Division Manager - Nuclear Support

P. O. Box 499

Columbus, NE 68601

Gentlemen:

Thank you for your letter of April 8,1987, in response to our letter and

Notice of Violation dated March 16, 1987. We have reviewed your reply and find

l it responsive to the concerns raised in our Notice of Violation. We will

review the implementation of your corrective actions during a future inspection

to determine that full compliance has been achieved and will be maintained.

Sincerely,

f Original Signed By

J. E. Gagliardo ,,

J. E. Gagliardo, Chief

Reactor Pro.jects Branch

'

CC:

Guy Horn Division Manager

i

of Nuclear Operations

Cooper Nuclear Station

P. O. Box 98

,

Brownville, Nebraska 68321

i

l Kansas Radiation Control Program Director

Nebraska Radiation Control Program Director

i

bec: (seenextpage)

1

l

, ,

PI N

WMMcNeill:cs

C:RPB/AM'/

JPJaudon f, C:RPB

JEGagl)ardo fi

4/d/87 4/ /J/87 4/p/8 \-

i

'

0704220343 870417

'

PDR ADOCK 05000290

. O PDR

i

_ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .

. _. - - - , . .- . -_.- _ _ _ _ _ _ _

,

M.: s

Nebraska Public Power District -2-

,

bec-toDMB(IE01)

bec distrib.-by RIV:

RPB DRSP

'.

'

RRI R. D. Martin, RA

SectionChief(RPB/A) D. Weiss, RM/ALF

,

R&SPB. RSB

MIS System Project Inspector

RIV File R. Hall

RSTS Operator

i

,

1

s

$

i

a

.

!

1

4

Y

/

g -- , , c. ., , ..a- ., b . - , . . , . . , ,..,__.,._,,,m .y, . , . , ,, w.-.* -e-., . ,.,.

4. .

'

GENERAL OFFICE

,

M Nebraska Public Power District " " ""##o"3054'0^10'" *"

- - - - - - - -

CNSS874167 .

7

I b I

,

April 8, 1987 'f {

.

APR I 01987 .

'

\

[ @

U.S. Nuclear Regulatory Commission

Attention: Document Control Desk

Washington, DC 20555 -

Subject: NPPD Response to IE Inspection Report No. 50-298/87-06

Gentlemen -

This letter is written in response to your letter dated March 16, 1987, .-

transmitting Inspection Report No. 50-298/87-06. Therein you indicated that

one of our activities was in violation of NRC requirements.

The following is the statement of the violation and our response in accordance

with 10 CFR 2.201:

Statement of Violation

Failure to Follow a Maintenance and Test Equipment Procedure

Appendix B Criterion V of 10 CFR Part 50 and the licensee's approved

Quelity Assurance Program require that activitics cffecting quality be

accomplished in accordance with the drawings and procedural instructions.

CNS Procedure 0.4, " Preparation, Review, and Approval of Procedures," -

Revision 7, dated July 2, 1986, states that approved written station

procedures shall be adhered to by all station personnel. Instrument

and Control Procedure 7.5.4.2, " Pressure Test Gauge Calibration," Revision

19, dated May 1, 1986, requires that calibration data be recorded in

the appropriate as-found and as-left data blank.

Contrary to the above, page 11 of Attachment "B" to Instrument and Control

Procedure 7.5.4.2 performed on December 16, 1986, failed to have data

for the zero calibration point recorded in the as-found and as-left data

blank, and page 31 of the above named procedure for the same date also

failed to have data for the zero calibration point recorded in the as-left

data blank.

This is a Severity Level IV violation. (Supplement I) (298/8706-04)

,

y&

,

dC-T1 \\O

.

O

9

a h

_ _ _ _ _ _ _

,

.

'S' CNSS874167 '

'- April 8, 1987 -

l Fage 2

1 n

Reason For The Violation

Attachment "B" of Instrument and Control (I&C) Procedure 7.5.4.2, " Pressure

j Test cauge Calibration," performed on December 16, 1986, failed . to have

'

the as-found and as-left data recorded on page 11 for the zero calibration

point. In addition, page 31 of the above named procedure and performance

data failed to have the as-left data recorded for the zero calibration

point. The reason for this violation is personnel error in completing

and reviewing the data sheet in accordance with procedures.

,I

Corrective Steps Which Have Been Taken And The Results Achieved

The two instruments which were calibrated per page 11 and 31 of Attachment

'

i

"B" of I&C Procedure 7.5.4.2 on December 16, 1986, have been re-calibrated

and this calibration properly documented.

Additional corrective steps taken have been the discussion of the event -

by the Operations Department Manager and I&C Supervisor with the I&C

Foremen. The foremen were counseled on the importance of completing .

a thorough review and evaluation of those I&C procedures requiring a

,

review subsequent to the completion of the testing accomplished in the -

l procedure. Further discussion of the event took place between I&C Foremen

1 and I&C Technicians. During these discussions, the technicians were ..

counseled on the importance of recording data per station procedural

requirements. Both of these actions should ensure data is recorded

properly by I&C Technicians per station procedural requirements and that

the required procedural review and evaluation takes place to verify

necessary data has been recorded.

Corrective Steps Which Will Be Taken To Avoid Further Violations

J

!

'

All I&C procedures requiring review subsequent to completion of the testing ,

accomplished in the procedure will have the signoff space stating " Reviewed '

By", changed to " Test Complete and Reviewed". This corrective step will

_ require a review to be performed and documented before the procedure

is to be considered fully completed.

.

Date When Full Compliance Will Be Achieved

Full compliance will be achieved by August 1, 1987.

G. A. Trevors

Division Manager

Nuclear Support

4

.

/rg

cc U.S. Regional Office

Region IV

'

Resident Inspector

Cooper Nuclear Station

1

-<--3- *- -- w- -,-t- ~ + " - ---m---- --,y- - - - - , - - - -