DOE Presentation for July 16, 2020 Meeting on Idaho Spent Fuel Facility
ML20196L733
Person / Time
Site: 07200025
Issue date: 07/16/2020
From:
US Dept of Energy, Idaho Operations Office
To:
Office of Nuclear Material Safety and Safeguards
KLBanovac NMSS/DFM/STL 415.7116
References
CAC 001028, EPID: L-2019-LRM-0080
Download: ML20196L733 (12)


Text

June 2019 DOE-Idaho Spent Fuel Facility License Amendment to Extend the Expiration Date Meeting with NRC July 16, 2020 Idaho Cleanup Project

Agenda

  • Opening Remarks
  • License Amendment to Extend the Expiration Date
  • Facility Location
  • Facility Description
  • Idaho Spent Fuel Facility Licensing History
  • Idaho Spent Fuel Facility Status
  • Schedule
  • Closing Remarks Idaho Cleanup Project 2

License Amendment to Extend the Expiration Date

  • Review the Idaho Spent Fuel Facility (ISFF) Safety Analysis Report (FSAR), programs, and environmental report for time-sensitive information
  • Evaluate the condition of the material to be stored to ensure its still bounded by the application
  • License Amendment Request (LAR) would request license expiration extension with technical and regulatory basis explained
  • LAR package would include proposed changes, if necessary, to:

- ISFF FSAR

- Environmental Report

- Other programs affected by expiration date extension Idaho Cleanup Project 3

License Amendment to Extend the Expiration Date

  • §72.42 timely renewal provision not applicable
  • DOE intends to extend the initial license term from 20 to 40 years, re-setting the initial license expiration date to 11/30/2044
  • Because neither the facility nor any Part 72 important-to-safety components exist, a license amendment to extend the license term is necessary, a license renewal is not.

Idaho Cleanup Project 4

Facility Location Idaho Nuclear Technology and Engineering Complex TMI-2 ISFSI Idaho Cleanup Project 5

Facility Description

  • Idaho Spent Fuel Facility is an ISFSI designed to store material already at the Idaho National Laboratory under DOE control:

- Peach Bottom Unit 1 spent fuel (~1600 elements)

- Training, Research, Isotopes, General Atomics (TRIGA) spent fuel

(~1600 elements)

- Shippingport spent fuel (~2,970 rods)

  • Facility operating concept is:

- Receive the material in the cask receipt area

- Perform remote-manual, dry repackaging of the material into new welded Idaho Standard Canisters

- Transfer the Idaho Standard Canisters to individual storage tubes located in the storage vault area

- Storage tubes are closed with bolted lids having dual metallic seals Idaho Cleanup Project 6

Idaho Spent Fuel Facility Description Idaho Cleanup Project 7

Idaho Spent Fuel Facility Description Idaho Cleanup Project 8

Idaho Spent Fuel Facility Licensing History

  • Spent Nuclear Material License 2512
  • 20-year term expires 11/30/2024
  • Amendment 1: Transferred license from Foster-Wheeler to DOE
  • License transfer order issued July 2009
  • Conforming amendment issued September 2009
  • Amendment 2: Added Essential Program Control to Technical Specification
  • Amendment issued September 2015
  • Amendment 3: Changed licensee delegation of authority
  • Amendment issued June 2017 Idaho Cleanup Project 9

Idaho Spent Fuel Facility Status

  • Construction never commenced
  • No procurement of important-to-safety components has occurred
  • License, FSAR, and essential programs have been maintained per Part 72 requirements Idaho Cleanup Project 10

Schedule

  • Assuming no regulatory prohibition on this approach is identified by DOE or NRC:

- License Amendment Request (LAR) development:

4th Quarter 2022 through 3rd Quarter 2023

- Pre-application meeting with NRC:

1st Quarter 2023 through 2nd Quarter 2023

- LAR submitted: 3rd Quarter 2023

- NRC dockets application: 4th Quarter 2023

- Requests for Additional Information (RAI): 1st Quarter 2024

- RAI response: 2nd Quarter 2024

- Amendment issued: 3rd Quarter 2024 Idaho Cleanup Project 11

Questions?

Idaho Cleanup Project 12