ML20083M985

From kanterella
Revision as of 03:23, 26 September 2022 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Responds to NRC Re Violations Noted in IE Insp Rept 50-382/82-18.Corrective Actions:Procedure ASP-I-3 Indoctrination & Training, Revised & Training Continuing on Ongoing Basis
ML20083M985
Person / Time
Site: Waterford Entergy icon.png
Issue date: 12/22/1982
From: Maurin L
LOUISIANA POWER & LIGHT CO.
To: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20083M945 List:
References
Q-3-A35.02.01, W3I82-0153, W3I82-153, NUDOCS 8302010520
Download: ML20083M985 (2)


Text

~ * -

.N ~

sus 2 jg LOUISIANA 242 octanoNoe Srnter

{~ - J POWER & LIGHT P O BOX 6000

  • NEW ORLEANS. LOUIS 2 - < u v4 * (504) 366-2345

'iSONsvsE u

L. V. MAURIN December 22, 1982 W3I82-0153 Q-3-A35.02.01 Mr. G. L. Madsen Reactor Projects Branch, Region IV U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76012

SUBJECT:

USNRC Request for Additional Information -

(50-382/82-18) dated December 3, 1982

REFERENCE:

LP&L letter W3I82-0088, L. V. Maurin to G. L. Madsen dated October 29, 1982

Dear Mr. Madsen:

On December 6, 1982 LP&L received a copy of your request for additional information, dated December 3, 1982, relative to USNRC Inspection Report 50-382/82-18 and its attached Notice of Violation. With respect to the specific violation, LP&L was requested to provide the following information:

"(1) What Specific Training actions LP&L has initiated to ensure that craft personnel follow your procedures, record, and signoff the required hold points, and (2) the date by which LP&L will have completed appropriate training of these craft personnel."

The following information is provided in response to your request.

I. Corrective Actions Which Have Been Taken A. Specific to the violation in USNRC Inspection Report 50-382/82-18 which discusses an unspecified weld that had been used to attach a plate to an angle brace instead of attaching the plate with bolting as specified in Ebasco drawing G-842D, Ebasco Force Account craft personnel, involved in the Structural Steel Area, received training in procedure CP-717, " Weld Identification and Traveler System" on November 15, 1982.

B. Training was conducted during the period September 24-30, 1982; 549 Ebasco Force Account craf t personnel (all disciplines) received the orientation training which included emphasis on the need to follow procedures, and to record and signoff the required procedure hold points.

8302010520 830127 PDR ADOCK 05000392 C PDR

i... = '

e- .,,

i Mr. G. L. Madsen -

W3I82-0153 Page 2 C. Procedure ASP-I-3, " Indoctrination and Training", which addresses ,

training of Ebasco personnel, has been revised to include:

1. Site Orientation (Quality Assurance and Safety), and
2) Procedure orientation for personnel performing safety-related activities II. Corrective Steps Which Will Be Taken l'

Impicmentation of the site indoctrination and training program commenced on September 24, 1982 and in addition to the personnel that were aircady trained, is being presented on an ongoing basis j to new personnel as they are hired, in accordance with ASP-I-3.

III. Date When Full Compliance Will Be Achieved:

.i With completion of the initial ro::nd cf training on September 30, 1982 full compliance was achieved. r If you have any questions concerring this response, please advise.

/

L. V. Maurin M

LVM/WAC:keh cc: E. Blake, W. Stevenson, J. Wilson i

h i.

1

-- _ . - . . . . ~ _ _ _ _ _ _ _ . . _ . _ _ _ . . .__ ._