ML20147B419

From kanterella
Revision as of 06:24, 8 August 2022 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards IE Bulletin 78-12 Requiring Action by Util
ML20147B419
Person / Time
Site: Cooper Entergy icon.png
Issue date: 09/29/1978
From: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Pilant J
NEBRASKA PUBLIC POWER DISTRICT
Shared Package
ML20147B423 List:
References
NUDOCS 7810110011
Download: ML20147B419 (1)


Text

CENTRAL FILES haatcoq UNITE D STATES ' M :HQ

, o NUCLEAR REGULATORY COMMISSloN LPDR

  • ~ E "E ' N" TIC 5 .. ,, "$ 611 RYAN PLAZA DRIVE, SulTE 1000 NSIC
  • h

, '2 AR LINGTON, TE XAS 70011

/ September 29, 1978 Docket No. 50-298 , , ,, , _

Nebraska Public Power District ATTN: Mr. J. M. Pilant, Licensing &

Quality Assurance Manager Post Office Box 499 Columbus, Nebraska 68601 Gentlemen:

Enclosed is IE Bulletin No. 78-12 which requires action by you with regard to your power reactor facility with an operating license or a construction permit.

Should you have questions regarding this Bulletin or the actions required of you, please contact this office.

Sincerely, e

s< 4 Karl V. Seyfrit Director

Enclosures:

1. IE Bulletin No. 78-12
2. List of IE Bulletins Issued in 1978 1$lfIl YIY J