ML20148U021

From kanterella
Revision as of 18:40, 7 August 2022 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards IE Inspec Repts 50-317/78-29 & 50-318/78-26 on 780410-3 During Which No Items of Noncompliance Were Noted
ML20148U021
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 11/25/1978
From: Galen Smith
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Lundvall A
BALTIMORE GAS & ELECTRIC CO.
Shared Package
ML20148U026 List:
References
NUDOCS 7812060242
Download: ML20148U021 (2)


See also: IR 05000317/1978029

Text

- . _ _ - _ - _ - _ - -

. . i

a

j f %(, UNITED STATES

g. ,, k NUCLEAR REGULATORY COMMISSION

( )?! 3 REGION I

5  ;

..l 631 P %RK AVENUE

0, y J g KING OF PRUSSI A, PENNSYLV ANI A 19406

'NJ

.....

l

OCT 2 51978

Docket Nos. 50-317

50-318

Baltimore Gas and Electric Company

ATTN: Mr. A. E. Lundvall, Jr.

' Vice President, Supply

P. O. Box 1475

Baltimort. Maryland 21203 -

Gentlemen:

Subject: Inspection 50-317/78-29; 50-318/78-26

This refers to the verification tests performed during an inspection

conducted by Dr. C. Paperiello of this office on April 10-13, 1978, at

the Calvert Cliffs Nuclear Plant, Units 1 and 2 of the activities author-

ized by NRC License Nos. DPR-53 and DPR-69. The results of that inspection

are contained in our letter dated May 5,1978, which includes Office of

< Inspection and Enforcement Inspection Report Nos. 50-317/78-13 and 50-

318/78-08.

The results of certain verification tests made at the time of that

inspection are included in the Office of Inspection and Enforcement

Report which is enclosed with this letter. Other aspects of the inspec-

tion were previously discussed in the above referenced correspondence.

Within the scope of this inspection, no items of noncompliance were

observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room. If this report contains any information that you (or your contractor)

t,elieve to be proprietary, it is necessary that you make a written

application within 20 days to this office to withhold such information

from public disclosure. Any such application must be accompanied by an

affidavit executed by the owner of the information, which identifies the

document or part sought to be withheld, and which contains a statement

of reasons which addresses with specificity the items which will be

considored by the Commission as listed in subparagraph (b)(4) of Section

2.790. The information sought to be withheld shall be incorporated as

781206024L

Q

&

. _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ . . . . _ _ _ _

. .

Baltimore Gas and Electric 2

Company

far as possible into a separate part of the affidavit. If we do not

hear from you in this regard within the specified period, the report

will be placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be

pleased to discuss them with you.

Sincerely,

George H. Smith, Chief

Fuel Facility and Materials Safety

Branch

Enclosure: Office of Inspection and Enforcement Inspection Report

Number 50-317/78-29; 50-318/78-26

cc w/ encl:

R. W. Davies, Manager, Quality Assurance

R. M. Douglass, Chief Engineer

W. Gibson, Supervisor Operational QA

l