Forwards Request for Addl Info Re Proposed Extension of License DPR-9,per 860915 & s,In Order to Complete Review.Requested Info Expected by 880915
ML20151M012
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 07/28/1988
From: Erickson P
Office of Nuclear Reactor Regulation
To: Orser W
DETROIT EDISON CO.
References
NUDOCS 8808040222
Download: ML20151M012 (5)


Text

_ _ _ - _ _ _

l July 28, 1988 l Docket No. 50-16 Mr. it. S. Orser, Vice President Nuclear Operationc Detroit Edison Company 6400 North Dixie Highway Newport, Michigan 48166 1

Dear Mr. Orser* '

SUBJECT:

FERMI-1, EXTENSION OF POSSESSION-ONLY-LICENSE, REQUEST FC'l ADDITIONAL. INFORMATION By letter dated May 17, 1985 as revised by letters dated July 23 and I September 15, 1986 and September 25, 1987 you proposed an amendment to extend the Fermi Unit 1 possession-only License No. DPR-9 for 40 years to March of 2025.

During Jur review we determined that additional information as identified in Enclosure No. 1 would be needed for us to complete our review. Please provide the requested information by September 15, 1988. ,

Sincerely, '

original signed by l Peter B. Erickson, Project Manager Standardization and Non-Power l Reactor Project Directorate i Divisica of Reactor Projects - III, IV, I V and Special Projects '

Office of Nuclear Reactor Regulation

Enclosure:

I As stated 1 cc See next page DISTRIBUTION:

EDocket, File NRC & Local PDR PDSNP Reading EHylton PErickson ,

EJordan BGrimes p OGC-Rockville /{

ACRS (10) t (O c-JW V l P h E, on PDSNP PErickson: w AD:PDSNP CMiller f s\

0 /88 07/)F/88 07/,l3/88 8808040222 880728 PDR l

P ADOCK 05000016 '

PNU

i

'o UNITED STATES 7

, [h ~g g NUCLEAR REGULATORY COMMISSION 7 ;E WASHINGTON, D. C. 20555

,/ July 28, 1988 Docket No. 50-16 Mr. W. S. Orser, Vice President Nuclear Operations Detroit Edison Company 6400 North Dixie Higi.say Newport, Michigan 48166

Dear Mr. Orser:

SUBJECT:

FERMI-1, EXTENSION OF POSSESSION-ONLY-LICENSE, REQUEST FOR ADDITIONAL INFORilATION By 'ietter dated May 17, 1985 as revised by letters dated tuly 23 and September 15, 1986 and September 25, 1987 you proposed an t.mendment to extend the Fermi Unit 1 possession-only License No. DPR-9 for 40 years to itarch of 2025.

During our review we determined that additional information as identified in Enclosure No. 1 would be needed for us to complete our review. Please provide the requested information by September 15, 1988.

Sincerely, Peter B. Erickson, Project Manager Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects - III, IV, Y and Special Projects Office of Nuclear Reactor Regulation

Enclosure:

As stated '

cc: See next page

r Mr. W. S. Orser Fermi-1 Facility Detroit Edison Company CC*

Mr. Ronald C. Callen Ms. Lynn Goodman Adv. Planning Review Section Supervisor - Licensing Michigan Public Service Commission Detroit Edison Company 6545 Mercantile Way Fermi Unit 2 P. O. Box 30221 6400 North Dixie Highway Lansing, Michigan 48909 Newport, Michigan 48166 John Flynn, Esq.

Senior Attorney Detroit Edison Company 2000 Second Avenue Detroit, Michigan 48226 Nuclear Facilities and Environmental Monitoring Section Office Divisica of Radiological Health P. O. Box 30035 Lansing, Michigan 48909 Mr. Thomas Randazzo Director, Regulatory Affairs Detroit Edison Company Fermi Unit 2 6400 North Dixie Highway Newport, Michigan 48166 Mr. Walt Rogers U.S. Nuclear Regulatory Commission Resident Inspector's Office 6450 W. Dixie Highway Newport, Michigan 48166 Monroe County Office of Civil Preparedness 963 South Raisinville Monroe, Michigan 48161 Regional Administrator, Region III )

U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyt, Illinois 60137 1

1 I

n

Enclosure Nc. 1 REQUEST FOR ADDITIONAL INFORMATION PROPOSED EXTENSION OF LICENSE NO. DPR-9 FERMI UNIT NO. 1 DETROIT EDISON DOCKET NO. 50-16 The following information is needed with respect to the proposed 40 year extension of License No. DPR-9.

A) Supplerrental Environtrantal Information dated September 25, 1987

1) Page 3.4, Section 3.2.1 Controls, inspections and surveillance requirements of the Technical Specifications should be revised to include all of items 1 through 7 listed in this section.
2) Page 3.8, Section 3.2.2 This section discusses liquid waste contained within two waste tanks in the Fuel and Repair Building (FARB). The two tanks contain a total of 7550 gallons of water that is contaminated with 6 mci of CO-60 and 6 mci of Cs-137.

Regulatory Guide 1.86 Section C.2.a states that all fuel assemblies and the radioactive fluids and wastes should be removed from the site when a facility is placed in a mothballed /SAFSTOR status. We request <

that you provide your plans, schedule and analysis for processing and l disposal of the 7550 gallons of contaminated water.

)

B) Technical Specifications (TS) l The TS should be updated to reflect the present status of Fermi Unit 1 and present NRC rules and guides. TS changes and additions needed are as follows:

1) Section A.8. "Abnormal Occurrence." This definition seems to reflect I what is now termed a "Licensee Event Report" (LER). Definitions I section should be updated to reflect current NRC terminology. l
2) Section B. Figure B-1 should be updated to reflect present status of the facility. The Health Physics Building has been removed. Also, this site map or another map should clearly define the restricted area pursuant to 10 CFR 20.3(a)(14).
3) Section E.1. Blanket subassemblies are no longer onsite. Reference to them should be deleted.
4) Section F. Unless the 7550 gallons of liquid waste presently stored in the tm waste tanks will be processed and disposed of within a short time (6 to 8 months) TS should be added for:

a) Monitoring of tank levels and ground water to detect leakage with actions to be taken if leakage is detected.

i

b) Periodic sampling of liquid to determine concentrations of radionuclides, c) Honitoring of the condition and maintenance of the tanks and the associated valves, piping and pumping equipment.

5) Section F. Limits on the release of radioactive effluents should be established with respect to 10 CFR Part 20 Appendix B Table II. The following has been found acceptable for Mumboldt Bay Unit 3:

a) Liquid Effluents Radioactive waste discharges to offsite locations shall not exceed the limits given in 10 CFR 20, Appendix B, Table II, column 2, a an instantaneous basis.

b) Gaseous Effluents Gaseous effluents shall not result in offsite ground level concentrations exceeding the limits given in 10 CFR 20, Appendix B, Table II, column 1, on an instantaneous basis.

6) Section H.3.d and e. Since sodium drums and blanket subassemblies have been removed from the site these paragraphs are no longer applicable.
7) Section H.4. Inspections should continue to be required (see item A.1. above) but this section which is based on the presence of large amounts of sodium should be revised to reflect the present facility status.
8) Section I. The administrative requirements should be revised to reflect the deletion of PRDC as a licensee and to reflect the present Detroit Edison Organization.
9) Section 1.9. Record requirements should be updated to reflect present use of "LER's" rather than "abnormal occurrences" and to delete records requirements on fuel and blanket subassemblies. Also, the records requirements (10 CFR 50.75(

rule of June 27, 1988 (53 FR 24051) g)) of should bethe new decommissioning added.

10) Figure G-1 Should be updated to show both Fermi Units and any change in the boundary or fences.