NRC-99-0076, Forwards Rev 8 to ITS Submittal to Provide Update to ITS Submittal for ITS Section 3.7.Brief Abstract of Changes Included

From kanterella
Jump to navigation Jump to search
Forwards Rev 8 to ITS Submittal to Provide Update to ITS Submittal for ITS Section 3.7.Brief Abstract of Changes Included
ML20196K154
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 06/30/1999
From: Gipson D
DETROIT EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20196K157 List:
References
CON-NRC-99-0076, CON-NRC-99-76 NUDOCS 9907080187
Download: ML20196K154 (6)


Text

r Douglas R. Gipson Senior Vice President, Nuclear Generation Fermi 2 6400 North Dixie Hwy., Newport, Michigan 48166 Tel: 731.586.5201 Far 734586.4172 Detroit Mison

~

June 30,1999 NRC-99-0076 U. S. Nuclear Regulatory Commission Attention: Document Control Desk

- Washington D C 20555-0001

References:

1) Fermi 2

_ NRC Docket No. 50-341 NRC License No. NPF-43

2) Detroit Edison Letter to NRC, ,

" Proposed Technical Specification Change (License Amendment)-Conversion to Improved Standard Technical Specifications",

dated April 3,1998

3) NRC Letter to Detroit Edison " Request for Additional Information Regarding Conversion to Improved Standard Technical Specifications for Fermi 2, Section 3.7 (TAC No. MA1465)",

dated November 20,1998

4) Detroit Edison Letter to NRC,

" Detroit Edison Response to Request for q Additional Information Regarding Conversion to {

Improved Standard , Technical Specifications for Fermi 2, Section 3.7 (TAC No. MA1465)",

dated January 8,1999

Subject:

Transmittal of Revision 8 to Fermi 2 Improved Technical Speci0 cation Submittal (TAC No. MA1465)

Attached please End Revision 8 to the Fermi 2 Improved Technical Specification (ITS) Submittal (Keference 2). The purpose of this revision is to provide the update to the ITS submittal for ITS section 3.7, Plant Systems. The update includes changes  !

! associated with the Reference 3 Request for Additional Information as responded to l I I l

- @C( (;

,,o7osose7 990630 PDR ADOCK 0 PDR N1 p

AIJTE Energy Cornpany

]

/

e USNRC NRC-99-0076 Page 2

- by Detroit Edison in Reference 4. Additional changes associated with section 3.7 are also included.

Attachment I contains a brief abstract of the changes included in this revision.

Attachment 2 contains the revised pages for the submittal along with revision instructions.

Should you have any questions or require additional information, please contact Mr. Norman K Peterson of my staff at (734) 586-4258.

Sincerely, _

Attachments cc: A. J. Kugler A. Vegel

- NRC Resident Office Regional Administrator, Region III Supervisor, Electric Operators, Michigan Public Service Commission i

~

l

/

^o USNRC' NRC-99-0076 Page 3 I, DOUGLAS R. GIPSON, do hereby affirm that the foregoing statements are based on facts and circumstances which are true and accurate to the best of my knowledge and belief.

DOUGLASh. GIPSON Senior Vice President, Nuclear Generation On this 30 fb day of dW ,1999 before me personally appeared Douglas R. Gipson, being first duly swom and says that he executed the j foregoing as his free act and deed.

f l- Nota'ry P'ublic NORMAN K. PETER $0N Netary Public, Monroe County, MI My Commemon Expires July 24,2002 1

1 i

f 0

t I

i l

i i

ATTACHMENT 1 TO NRC-99-0076 f f

J ABSTRACT OF REVISION 8 TO THE FERMI 2 IMPROVED TECHNICAL SPECIFICATION SUBMITTAL

- Abstract of Revision 8 to the Fermi 2 Improved Technical Specification Submittal

?

Revision' 8 to the Fermi 2 Improved Technical Specification (ITS) submittal incuporates the January 8,1999 responses to the Requests for Additional Information (RAl) for ITS Section 3.7 (Plant Systems) Revision bars are provided to aid in identification of the ,

changed material. For those changes associated with an RAI, the RAI number is included with the revision bar.

Minor corrections are included in this revision. These changes consist of various format, spelling, labeling, and editorial enhancement and/or technical changes typically identified '

during implementation preparation. The revision bars for these changes are, except where noted, marked with a circled "A."

The following lists specific changes in Revision 8:

Clean-typed pages that are included for replacement solely due to "page-roll" changes from other RAl-related changes (annotated next to the page footer).

Typo's corrected: pages B 3.7.1-2, B 3.7.1-6, B 3.7-2, B 3.7-6,3.7.3 DOCS A.5 and L.2,3.7.6 DOCS A.2 and A.3.

I Incorporation of Amendment 132.

Changes to Specification 3.7.5 related to RAI 3.4-15 and are marked as 3.4 RAI.

Addition of new Specification 3.7.8 for Emergency Diesel Generator Service Water system. This material is related to RAI 3.8.1-17 and is marked as 3.8 RAI.

t The following additional information is provided regarding the RAI responses provided in Reference 4:

The inconsistency within the Bases for Residual Heat Removal Service Water (RHRSW) i noted in RAI 3.7-1 has been resolved by eliminating reference to the 8250 gpm flow rate.  !

The change referred to in RAI 3.7 2 has not been made. This resulted from the decision l l

to include the Suppression Pool Spray function in the ITS. This issue is related to RAI y l- S3.6.4.2-1.

l I

l

a l

ATTACIIMENT 2 TO NRC-99 0076 INSERT AND REMOVAL SIIEETS i

1 l

1 i

1 I

J