NRC-99-0079, Forwards Rev 15 to Fermi 2 ITS Submittal,Dtd 980403.Rev Provide Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Attachment 1 Contains Brief Abstract of Changes Included in Rev

From kanterella
Jump to navigation Jump to search

Forwards Rev 15 to Fermi 2 ITS Submittal,Dtd 980403.Rev Provide Update for Remaining Open Issues Associated with NRC Review of ITS Submittal.Attachment 1 Contains Brief Abstract of Changes Included in Rev
ML20211Q727
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 09/08/1999
From: Oconnor W
DETROIT EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20211Q732 List:
References
CON-NRC-99-0079 TAC-MA1465, NUDOCS 9909150135
Download: ML20211Q727 (6)


Text

_ _ _ _ _ _ _ _ _ _ _

Fermi 2 1 6400 North Dixie llwy., Newport, M148166 Detroit Edison September 8,1999 NRC-99-0079 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D C 20555-0001

References:

1) Fermi 2 NRC Docket No. 50-341 NRC License No. NPF-43
2) Detroit Edison Ixtter to NRC, NRC-98-0043,

" Proposed Technical Specification Change (License Amendment)- Conversion'to Improved Standard Technical Specifications",

dated April 3,1998

3) NRC Ixtter to Detroit Edison,

" Fermi 2 - Draft Safety Evaluation Regarding the Proposed Conversion of the Current Technical Specifications to Improved Standard Techracal Specifications (TAC No. MA1465)",

dated August 6,1999

Subject:

Transmittal of Revision 15 to Fermi 2 Improved Technical \

Snecification Submittal (TAC No. MA1465) l Attached please find Revision 15 to the Fermi 2 Improved Technical Specification (ITS) Submittal (Reference 2). The purpose of this revision is to provide an update for the remaining open issues associated with NRC review of the ITS submittal.

Attachment I contains a brief abstract of the changes included in this revision. -

Attachment 2 contains the revised pages for the sul mittal along with revision 0

.\

0 instructions. N In Reference 3, the NRC provided a draft copy of the Fermi 2 ITS Safety Evaluation (SE) for comment. In addition, Reference 3 requested that Detroit Edison provide a copy of the Fermi 2 TFS and Bases for issuance.

9909150135 990908 PDR ADOCK 05000341 p PDR A IrTE Energy Company

USNRC NRC-99-0079 Page 2 Attachment'3 contains our comments on the draft SE. Attachment 4 contains the Fermi 2 ITS and Bases.

Should you have any questions or require additional information, please contact Mr. Norman K. Peterson of my staff at (734) 5864258.

Sincerely, LO 3 O 'h W. T. O'Connor, Jr.

Assistant Vice President Nuclear Assessment Attachments cc: A. J. Kugler A. Vegel NRC Resid;m Office Regional Administrator, Region III Supervisur, Electric Operators, Michigan Public Service Commission l

l l

1 I

t i i

% l

USNRC.

NRC-99-0079 Page 3 1, WILLIAM T. O'CONNOR, JR., do hereby affirm that the foregoing statements are based on facts and circumstances which are true and accurate to the best of my knowledge and belief.

B d ( b% .

WILLIAM T. O'CONNOR, JR. ()

Assistant Vice President Nuclear Assessment On this day of AdtLI999 before me personally appeared William T. O'Connor, Jr., beilig first duly sworn and says that he executed the foregoing as his free act and deed.

f

{JttdEL lfMLbL-Notary Public ROSAUE A. ARMETTA ROTARY PUBUC.WOF COUNTY M!

MYCOMMISSION EXPIRES 10/11SS d

L

ATTACHMENT 1 TO NRC-99-0079 ABSTRACT OF REVISION 15 TO THE FERMI 2 IMPROVED TECHNICAL SPECIFICATION SUBMITTAL i,,. . .

2

I Attachment I to l NRC-99-0079 -

' Page 2 Abstract of Revision 15 to the Fermi 2 Improved Technical Specification Submittal l Revision 15 to the Fermi 2 Improved Technical Specification (ITS) submittal incorporates issues l remaining from NRC review of the ITS. Revision bars are provided to aid in identification of the changed material. For those changes associated with an RAI, the. RAI number is included with

! the revision bar.

l Minor corrections are included in this revision. These changes consist of various format, l spelling, labeling, and editorial enhancement and/or technical changes typically identified during

)

implementation preparation. The revision bars for these changes are, except where noted, marked with a circled "A".

The following lists specific changes in Revision 15:

=

A correction is made to the Bases for ITS 3.3.1.1, RPS Instrumentation regarding the number of position switches for each MSIV that provide MSIV closure signals to the RPS.

=

Additional information is provided in the Bases of ITS 3.3.5.2, RCIC System Instrumentation, for the Manual Initiation function. As requested by the NRC reviewer, this material is similar to that provided for the HPCI System in a previous submittal revision.

=

The NUREG markup for SR 3.7.4.1 has been annotated with Justification for Differences.

SR 3.10.5.5 has been modified to be consistent with the LCO and Bases.

1

\

{

l 1

ATTACIIAIENT 2 TO NRC-99-0079 INSERT AND REAfOVAL SIIEETS l