ML20059B783

From kanterella
Jump to navigation Jump to search

Advises That NRC Considers 900724 Application for Amend to License NPF-43 Re Turbine Overspeed Protection Sys Withdrawn
ML20059B783
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 08/22/1990
From: Stang J
Office of Nuclear Reactor Regulation
To: Orser W
DETROIT EDISON CO.
References
TAC-74568, NUDOCS 9008300094
Download: ML20059B783 (2)


Text

i August 22, 1990 e ,

i .

[

, .s ,'

'4 Docket ~No. 50-341 Mr. William S. Orser - i Senior Vice President - Nuclear Operations ,

Detroit Edison Company 1 6400 North Dixie Highway i Newport, Michigan 48166

Dear Mr. Orser:

SUBJECT:

FERMI WITHDRAWAL OF AN AMENDMENT REQUEST REGARDING TURBINE OVERSPEED PROTECTION (TAC NO. 74568)  !

By letter dated July 24,1989, (NRC-C9-0108), you submitted an application for amendment to the Fermi-2 Operating License, No. NPF-43. The proposed )

i change would change the Technical Specifications by making minor modifications to better specify the requirements of the Turbine Overspeed Protection System.

~However, your staff. subsequently informed the NRC during meetings at the site l and in phone conversations that the amendment is no longer requested. Therefore, your proposed change is considered to-be withdrawn. If this information is not I correct, please notify the NRC of your intended actions within 10 days of receipt of this letter.

Sincerely,

@sigudby John F. Stang, Project Manager Project Directorate III-1 Division of Reactor Projects - III IV, V and Special Projects Office of Nuclear Reactor Regulation cc: See next page DISTRIBUTION /

Docket Filev OGC NRC & Local PDRs EJordan JStang ,

L PD31 Reading 'ACRS(10) JZwolinski PShuttleworth Plant File LA/PD31:DR PH/PD l

JSTANG[

P D/PD3h,61 J SP SMEAJOR RPIERh  ;

9 /p/90 8 /90 i h\/90 0"O19 I hg L

pOO*3ObOch000bb41 p PDC FER 74568 v

August 22, 1990 Ibcket No. 50-341 Mr. William S. Orser Senior Vice President - Nuclear Operations Detroit Edison Company ,

6400 North Dixie Highway l Newport, Michigan 48166 1

Dear Mr. Orser:

1

SUBJECT:

FERMI WITHDRAWAL OF AN AMENDMENT REQUEST REGARDING TURBINE l OVERSPEED PROTECTION (TAC NO. 74568) i By letter dated July 24,1989,(NRC-89-0108), you submitted an application i for amendment to the Fermi-2 Operating License, No. NPF-43. The proposed j char.ge would change the Technical Specifications by making minor modifications to better specify the requirements of the Turbine Overspeed Protection System.

However, your staff subsequently informed the NRC during meetings at the site l

j and in phone conversations that the amendment is no longer requested. Therefore, I your proposed change is considered to be withdrawn. If this information is not I 1

correct, please notify the NRC of your intended actions within 10 days of  !

receipt of this letter.

Sincerely,

\

@ tigMd by l

l l John F. Stang, Project Manager l Project Directorate III-1 l l Division of Reactor Projects - III l l IV, Y and Special Projects '

Office of Nuclear Reactor Regulation cc: See next page DISTRIBUTION Docket File- OGC .

NRC & Local PDRs EJordan JStang PD31 Reading ACRS(10) JZwolinski PShuttleworth Plant File LA/PD31:DR PM/PD P D/PD3)J SP i- SMEA OR JSTANG( RPIERj0ll l 1/{/90 /90 L h\/90 1

FERMI 74568

t,

    • at([* ,, UNITO STATES I

[<

'E  ;

NUCLEAR REGULATORY COMMISSION WASMlldGTON, D. C. 70646

  • *t August 22, 1990 g

e...+

Docket No. 50-341 Mr. William S. Orser Senior Vice President - Nuclear Operations 4 Detroit Edison Company.  !

6400 North Dixie Highway Newport, Michigan 48166 {

Dear sr. Orser:

1

SUBJECT:

FERMI WITHDRAWAL OF AN AMENDMENT REQUEST REGARDING TURBINE <

OVERSPEEDPROTECTION(TACNO.74568)  !

l 4

By letter dated July 24,1989,(NRC-89-0108), you submitted an application I for amendment to the Fermi-2 Operating License, No. NPF-43. The proposed

. change would change the Technical Specifications by making minor modifications to better specify the requirements of the Turbine Overspeed Protection System. ,

However, your staff subsequently nformed the NRC during meetings at the site and in phone conversations that the amendment is no longer requested. Therefore, your proposed change is considered to be withdrawn. If this information is not correct, please notify the NRC of your intended actions within 10 days of receipt of this letter.

Sincerely, d.J.

Jhn F. Sta , Project Manager Project Directorate III-1 Division of Reactor Projects - III IV, Y and Special Projects Office of Nuclear Reactor Regulation cc: See next page

, N WV Af /,

n- j i

M'r. Willier Orser Fenni-2 Facility Detroit Edison Company  ;

cc:

John Flynn, Esq.

Senior Attorney Detroit Edison Company .;

2000 Second Avenue ,

Detroit, Michigan 48226 i Nuclear F6cilities and Environmental  :

Monitoring Section Office Division of Radiological Health P. O. Box 30195 1 Lahring, Michigan 48909  !

tir. Walt Rogers U.S. lluelear Regulatory Comission Resident Inspector's Office 6450 L'. Dixie Highway  ;

Newport, Michigan 48166 Monroe County Office of Civil l l preparedness l E

963 South Raisinville lionroe, Michigan 48161 l Regiora1 Adtninistrator, Region III U.S. Nuclear Regulatory Correission - -

799 Roosevelt Road ,

Glen Ellyn, Illinois 60137 Ms. Lynne Goodman Supervisor - Licensing Detroit Edison Company Fermi Unit 2 6400 f: orth Dixie Highway Newport, Michigan 48166 l

1 l

- , . .