L.
!
- .
!.
,,
~
.
,.
JUN 2 31989
I
l
Docket No. 50-341
l
The Detroit Edison Company
ATTN:
B. Ralph _ Sylvia.
Senior.Vice President
Nuclear Operations
6400 North Dixie Highway
Newport, MI 48166
Gentlemen:
This refers to the routine safety inspection conducted by Mr. J. Patterson and
others of this office .on June 13-15, 1989, of activities'at Fermi Nuclear Power
Plant, Unit. 2 authorized by License No. NPF-43 and to the discussion of our
findings with you, Mr. S. Catola and others of your staff at the conclusion
of the inspection. .
The enclosed copy of our inspection. report identifies areas examined during
the inspection. Within these areas, the inspection consisted of~a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No violations of NRC requirements were identified during the course of this
,
inspection,
liowever, one Exercise Weakness was identified during this
inspection wnich will require corrective action'.
This Weakness is identified
in the Apperdix to this letter. As required by 10 CFR 50, Appendix ? (IV.F),
any weakr, esses tl,at are identified must be corrected. According?y, you are
requested to su5mit a written statement within 30'de)s of the date of this
letter describing your planned actions for correcting the Weakness identified
in the Appendix.
,-
In accordance with 10 CFR 2.790'of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC-
Public Document Room.
l
I
- l
d-
t
)
l
i s
'
/f
/(
4
'
I
G906290477 890623
i
ADOCK 05000341
-Q
_ _ _ _ _ - _ -
_ _ _ - _ _ _ _ _
'
.
"
.
.
The Detroit Edison Company
2 M 23 %
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
W
L. Robert Greger, Chief
Reactor Programs Branch
Enclosures:
1.
Appendix, Exercise Weakness
2.
Inspection Report
No. 50-341/89019
cc w/ enclosures:
Patricia Anthony, Licensing
P. A. Marquardt, Corporate
Legal Department
DCD/DCB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
Ronald Callen, Michigan
Public Service Commission
Harry H. Voight, Esq.
Michigan Department of
Public Health
Monroe County Office of
Civil Preparedness
'
T.. W. Travers, NRR, EPB
D. Bement, FEMA, Region V
J. Foster, RIII
1"
RIII c y)
RIII
RIII
RII
N f'
Pattb'(so( n/ jaw
g(sS
v1#kGle
,
-4
Snell
M-
G
r/p/SrT
G/PfN
NIN
b[yer
_
i
i
.
_ _
',
.
.
.
1
APPENDIX
EXERCISE WEAKNESS
The licensee failed to adequately demonstrate assembly and accountability
which was requested following the Alert declaration at 0932. The Security
Shift Supervisor informed the Emergency Director in the TSC at 1002 that
within the'30-minute goal, 64 people were not properly accounted for. At
1018, 16 people were still missing. All were finally accounted for by 1033,
or 60 minutes from the time the PA announcement was made for
assembly / accountability. The number of people unaccounted for within the
30-minute goal, and the total time of 60 minutes to account for all people
were both unacceptable.
Open Item No. 341/89019-01 (Section 4.b).
<
k
i
i
d
i
J
4
_ _ _ _ _ _ _ _ _ - _ . _ _ _ _ _ - _ _ _ _ _ _ _ - _ _