Forwards Safety Insp Rept 50-341/89-19 on 890613-15.No Violations Noted.Exercise Weakness Discussed
ML20245H402
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 06/23/1989
From: Greger L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Sylvia B
DETROIT EDISON CO.
Shared Package
ML20245H408 List:
References
NUDOCS 8906290477
Download: ML20245H402 (3)


See also: IR 05000341/1989019

Text

- -

<

,

-. L.  !

,, !.

~

.

,.

JUN 2 31989

I

l

Docket No. 50-341

l

The Detroit Edison Company

ATTN: B. Ralph _ Sylvia.

Senior.Vice President

Nuclear Operations

6400 North Dixie Highway

Newport, MI 48166

Gentlemen:

This refers to the routine safety inspection conducted by Mr. J. Patterson and

others of this office .on June 13-15, 1989, of activities'at Fermi Nuclear Power

Plant, Unit. 2 authorized by License No. NPF-43 and to the discussion of our

findings with you, Mr. S. Catola and others of your staff at the conclusion

of the inspection. .

The enclosed copy of our inspection. report identifies areas examined during

the inspection. Within these areas, the inspection consisted of~a selective

examination of procedures and representative records, observations, and

interviews with personnel.

, No violations of NRC requirements were identified during the course of this

inspection, liowever, one Exercise Weakness was identified during this

inspection wnich will require corrective action'. This Weakness is identified

in the Apperdix to this letter. As required by 10 CFR 50, Appendix ? (IV.F),

any weakr, esses tl,at are identified must be corrected. According?y, you are

requested to su5mit a written statement within 30'de)s of the date of this

letter describing your planned actions for correcting the Weakness identified

in the Appendix.

,-

In accordance with 10 CFR 2.790'of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC-

Public Document Room.

l

I

d- :l

t

l

)

i

s

'

/f

/( 4

'

I

G906290477 890623 i

PDR ADOCK 05000341

-Q PDC

_ _ _ _ _ - _ -

_ _ _ - _ _ _ _ _

'

.

"

.

.

The Detroit Edison Company 2

M 23 %

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

W

L. Robert Greger, Chief

Reactor Programs Branch

Enclosures:

1. Appendix, Exercise Weakness

2. Inspection Report

No. 50-341/89019

cc w/ enclosures:

Patricia Anthony, Licensing

P. A. Marquardt, Corporate

Legal Department

DCD/DCB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Ronald Callen, Michigan

Public Service Commission

Harry H. Voight, Esq.

Michigan Department of

Public Health

Monroe County Office of

Civil Preparedness '

T.. W. Travers, NRR, EPB

D. Bement, FEMA, Region V

J. Foster, RIII

1"

RIII Ncf'y) RIII RIII , RII

Pattb'(so( n/ jaw

g(sS

Snell

v1#kGle

M- _

G

-4

r/p/SrT G/PfN NIN b[yer

i

i

.

_ _

.

',

.

.

1

APPENDIX

EXERCISE WEAKNESS

The licensee failed to adequately demonstrate assembly and accountability

which was requested following the Alert declaration at 0932. The Security

Shift Supervisor informed the Emergency Director in the TSC at 1002 that

within the'30-minute goal, 64 people were not properly accounted for. At

1018, 16 people were still missing. All were finally accounted for by 1033,

or 60 minutes from the time the PA announcement was made for

assembly / accountability. The number of people unaccounted for within the

30-minute goal, and the total time of 60 minutes to account for all people

were both unacceptable.

Open Item No. 341/89019-01 (Section 4.b).

<