Text
l
,.
.
UNITED STATES
/p nogo
NUCLEAR REGULATORY COMMISSION
'*
[
' '
REGloN lli
o
.J
y
801 WARRENVILLE ROAD
I
s
/
e
lisle, ILLINOls 60532-4351
~
.....
June 1,1999
Mr. D. R. Gipson
Senior Vice President
j
Nuclear Generation
i
The Detroit Edisen Company
6400 North Dixie Highway
Newport, MI 48166
SUBJECT:
FERMI INSPECTION REPORT 50-341/99007(DRP)
Dear Mt. Gipson:
This refers to the inspection conducted on April 2 through May 15,1999, at the Fermi 2 Facility.
The enclosed report presents the results of this inspection.
During this inspection period, we noted that the operation of your facility was conducted in a
deliberate and conservative manner. Specifically, we observed effective coordination between
operations and maintenance personnel, and appropriate management oversight during the
conduct of planned maintenance on the main condenser and the scram solenoid pilot valves.
Other observed routine surveillance and maintenance activities were also performed in
accordance with established procedures, and we noted that effective radiation protection
measures were implemented. In addition, we observed your staff effectively identifying and
documenting deficiencies in the corrective action program, and the causes of these deficiencies
were being thoroughly investigated.
We are concerned with the overtime program weaknesses that you identified, specifically the
requirement for management approval of overtime deviations not being met. Additional!y, you
identified that the overtime program did not meet the original intent of previously issued Generic
Letters. We recognize that your staff identified these issues, the corrective actions that you
have initiated were appropriate, and no apparent safety consequences resulted from the
overtime program weaknesses. You are encouraged to continue to periodically assess the
adequacy of this program, as well as other required programs, to ensure inat the programs are
being implemented as initially intended by the regulatory requirements.
Based on the results of this inspection, the NRC has determined that one violation of NRC
j
requirements occurred concerning the failure to meet Technical Specification requirements
regarding the approval of overtime deviations. This violation is being treated as a Non-Cited
i
Violation (NCV), consistent with Appendix C of the Enforcement Policy. This NCV is described
in the subject inspection report. If you contest the violation or severity level of the NCV, you
should provide a response within 30 days of the date of this inspection report, with the basis for
your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk,
9906070053 990601
ADOCK 05000341
0
F
,
4
)
i
D. Gipson
-2-
l
Washington, DC 20555-0001, with copies to the Regional Administrator, Region Ill, and the
Director, Office of Enforcement, United States Nuclear Regulatory Commission,
Washington, DC 20555-0001.
i
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter its
t
enclosure, and your response, if you choose to provide one, will be placed in the NRC Public
Document Room.
'
Sincerely,
Original signed by
l
A. Vegel, Chief
J
Reactor Projects Branch 6
Docket No. 50-341
License No. NPF-43
Enclosure:
Inspection Report 50-341/99007(DRP)
cc w/ encl:
N. Peterson, Director, Nuclear Licensing
P. Marquardt, Corporate Legal Department
R. Gaston, Compliance Supervisor
R. Whale, Michigan Public Service Commission
Michigan Department of Environmental Quality
Monroe County, Emergency Management Division
Emergency Management Division
,
Ml Department of State Police
DOCUMENT NAME: G:\\FERM\\FER99007.DRP
To receive a copy of this document, Indicate in the box *C" = Copy w/o att/end "E* = Copy w/attlend "N" = No copy
I OFFICE
RtRQRP _ #
l
Rill:DRP j lE.
l
l
NAME
ECobeM
AVegel /W
DATE
05/
/99 \\
06/ A/99
OFFICIAL RECORD COPY
.h 4?
. . .
.,
,
D. Gipson
-3-
Distribution:
CAC (E-Mail)_
- RPC (E-Mail)
_ Project Mgr., NRR w/enci
.
- J. Caldwell, Rlll w/enci
- B. Clayton, Rill w/ encl
SRI Fermi w/enci .
~ DRP w/ encl
DRS w/enci .
Rill PRR w/enct
PUBLIC IE-01 w/enci
Docket File w/enci
GREENS
LEO (E-Mail)
DOCDESK (E-Mail)
.
i
4
U70033