ENS 57179 | 14 June 2024 05:00:00 | Alton Steel Inc. | Damaged Gauge | |
ENS 57108 | 25 April 2024 05:00:00 | Domtar | Stuck Shutters | Stuck Shutter |
ENS 57016 | 7 March 2024 06:00:00 | Alton Steel | Damaged Gauges | Moisture Density Gauge |
ENS 57007 | 5 March 2024 17:00:00 | Kirtland Air Force Base | Stuck Irradiator Source | |
ML23264A059 | 31 January 2024 | | Enclosure 2, International Events; October 1, 2022 to September 30, 2023 | Stolen |
ENS 56962 | 18 January 2024 05:00:00 | Buzzi-Unicem Usa | Agreement State - Shutter Stuck Open | |
ML24011A186 | 10 January 2024 | 11006027 | Export License Issued to Alpha Omega Services, Inc., PXB6.43 | Brachytherapy |
ML24003A857 | 2 January 2024 | 11006070 | Letter to the Eb Notifying of the Issuance of PXB3.14 | |
ML23352A347 | 31 December 2023 | 07109390 | NAC International, Safety Analysis Report, Revision 23D | |
ML23360A008 | 27 December 2023 | 07109389 | Safety Evaluation Report for Certificate of Compliance, Revision 0 | Probabilistic Risk Assessment Coatings Nondestructive Examination Fuel cladding Exclusive Use |
ML23321A238 | 26 December 2023 | 07003103 | Enclosure 3 - LES Amendment 100 - 24 Hour Reporting Requirements Exemption Request (Public) | Decommissioning Funding Plan Exemption Request Depleted uranium |
ML23354A064 | 22 December 2023 | Crystal River | Enclosure - Crystal River License Termination Plan Request for Additional Information | |
ML23328A025 | 21 December 2023 | | IP 87125 Materials Processor/Manufacturer Programs | High Radiation Area Grab sample Fire Protection Program Stolen |
NUREG-2175, February 2024 ACRS Meeting - Predecisional - Documents to Support SECY-24-XXXX - Draft NUREG-2175, Revision 1 | 20 December 2023 | | February 2024 ACRS Meeting - Predecisional - Documents to Support SECY-24-XXXX - Draft NUREG-2175, Revision 1 | High winds Tornado Missile Hydrostatic Probabilistic Risk Assessment Condition Adverse to Quality Significance Determination Process License Renewal Earthquake Biofouling Fire Protection Program Fire Watch Stolen |
ML23348A348 | 20 December 2023 | | February 2024 ACRS Meeting - Predecisional - Documents to Support SECY-24-XXXX - Draft Proposed Rule Federal Register Notice | License Renewal Earthquake Stolen Backfit |
ML23349A050 | 20 December 2023 | | February 2024 ACRS Meeting - Predecisional - Documents to Support SECY-24-XXXX - Draft Rule Text Redline Strikeout | Incorporated by reference License Renewal Earthquake |
ML23352A346 | 18 December 2023 | 07109390 | NAC International, Request for a Revision to NAC OPTIMUS-L Transportation Package | Affidavit |
ENS 56895 | 17 December 2023 05:00:00 | Sterigenics U.S. Llc | Stuck Source Rack | |
ML23345A094 | 14 December 2023 | 07109390 | Certificate of Compliance No. 9390, Revision No. 2 | Depleted uranium |
ML23345A211 | 11 December 2023 | 07109390 | NAC International, Inc., Submittal of Replacement Pages for Supplemental Responses to the Nrc'S Request for Additional Information to Nac'S for the NAC OPTIMUS-L Transportation Package and Safety Analysis Report, Revision 1 | |
ML23341A090 | 7 December 2023 | 07109389 | Consolidated Safety Analysis Report Associated with Tn Americas LLC Application for Approval of the TN-40HT Transportation Package | Non-Destructive Examination Hydrostatic Probabilistic Risk Assessment Coatings Nondestructive Examination Earthquake Control of Heavy Loads Fuel cladding Liquid penetrant Loctite Exclusive Use Affidavit |
L-2023-166, Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report | 6 December 2023 | Turkey Point | Turkey Points Units 3 and 4, Correction to the 2022 Annual Radioactive Effluent Release Report | Grab sample Offsite Dose Calculation Manual Anticipated operational occurrence Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Power change |
ML23341A013 | 6 December 2023 | 07109313 | Tn Americas LLC, Consolidated Safety Analysis Report Associated with the Application for Revision 4 to Certificate of Compliance No. 9313 for the Model No. TN-40 Packaging | Weld Overlay Hydrostatic Coatings Finite Element Analysis Fuel cladding Liquid penetrant Loctite Exclusive Use Affidavit |
ML23335A167 | 6 December 2023 | | Final - NRR Presentation to INPO New RPM Seminar December 2023 | High Radiation Area Overexposure |
ML23338A245 | 4 December 2023 | | Annual Policy Letter Notification of Initial Reciprocity Filing of NRC Form 241 Requirement for Calendar Year 2024 | High winds Stolen Backfit |
ML23334A192 | 30 November 2023 | Holtec | HI-2210161-A, Topical Report on the Radiological Fuel Qualification Methodology for Dry Storage Systems | Fuel cladding |
ML23334A186 | 30 November 2023 | 07109374 | International, Safety Analysis Report on the HI-STAR 80 Package, Revision 5 | Non-Destructive Examination Weld Overlay Internal Flooding Hydrostatic Probabilistic Risk Assessment Coatings Finite Element Analysis Design basis earthquake Control of Heavy Loads Fuel cladding Liquid penetrant Exclusive Use Depleted uranium |
ML23334A182 | 30 November 2023 | Pilgrim | Biennial Report for the Defueled Safety Analysis Report Update, Technical Specification Bases Changes, 10 CFR 50.59 Evaluation Summary, and Regulatory Commitment Change Summary November 2021 Through October 2023 | Safe Shutdown High winds High Radiation Area Ultimate heat sink Grab sample Offsite Dose Calculation Manual Fire Barrier Tornado Missile Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Emergency Lighting Locked High Radiation Area Tornado-Generated Missile Aging Management Abnormal operational transient Design basis earthquake Annual Radiological Environmental Operating Report License Renewal Earthquake Control of Heavy Loads Accidental discharge Fire Protection Program Fire Watch Scaffolding |
ML23333A863 | 29 November 2023 | 11006571 | Export License Issued to Halliburton Energy Services PXB245.00 | |
ML23345A084 | 28 November 2023 | Susquehanna | Technical Requirements Manual | Unanalyzed Condition Shutdown Margin Reactor Vessel Water Level Ultimate heat sink Grab sample Offsite Dose Calculation Manual Water Inventory Control Post Accident Monitoring Annual Radiological Environmental Operating Report Process Control Program Battery sizing Power change |
ML23345A088 | 28 November 2023 | Susquehanna | Technical Requirements Manual | Unanalyzed Condition Shutdown Margin Reactor Vessel Water Level Ultimate heat sink Grab sample Offsite Dose Calculation Manual Water Inventory Control Post Accident Monitoring Annual Radiological Environmental Operating Report Process Control Program Battery sizing Hourly Fire Watch Power change |
ML23332A177 | 28 November 2023 | Saint Lucie | Correction to the 2022 Annual Radioactive Effluent Release Report | Grab sample Offsite Dose Calculation Manual Met Tower Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Recently irradiated fuel Power change |
ML23317A246 | 21 November 2023 | 07109316 | Enclosure 1 - Coc No. 9316, Rev 12 Aos | Exclusive Use |
ML23320A242 | 16 November 2023 | | Ots Chapter 246-231 Wac Package Transportation (002) | Condition Adverse to Quality Exclusive Use Depleted uranium |
ML23320A203 | 15 November 2023 | 07109390 | Supplemental Responses to the Nrc'S Request for Additional Information to Nac'S for the NAC OPTIMUS-L Transportation Package, Certificate of Compliance 71-9390, and Safety Analysis Report, Revision 23C | Non-Destructive Examination Hydrostatic Nondestructive Examination Finite Element Analysis Liquid penetrant Exclusive Use |
ML23286A306 | 8 November 2023 | Zion | Safety Evaluation Report Related to the Partial Site Release | High Radiation Area Annual Radioactive Effluent Release Report Exemption Request |
ML23310A312 | 8 November 2023 | Zion | Enclosure - Final Status Survey Safety Evaluation Report - Remaining Survey Units Outside the ISFSI | Annual Radioactive Effluent Release Report |
ML23312A165 | 6 November 2023 | | NRC-2016-000539 - Nrr&Nro_Released Set | Grab sample Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report License Renewal Chernobyl Environmental Justice Power change |
ML23310A108 | 3 November 2023 | Zion | Confirmatory Survey Report 2023 | |
IR 05000397/2023093 | 1 November 2023 | Columbia | Final Significance Determination of a White Finding, Notice of Violation and Follow-Up Assessment Letter; NRC Inspection Report 05000397/2023093 | Significance Determination Process Preliminary White Finding Substantial potential for overexposure Overexposure |
ML23304A361 | 31 October 2023 | 05200050 | LLC Revision 1 to Standard Design Approval Application, Part 2, Chapter 12, Radiation Protection | Loop seal High Radiation Area Ultimate heat sink Grab sample Anticipated operational occurrence Coatings Emergency Lighting Fuel cladding |
ML23304A482 | 31 October 2023 | 05200050 | LLC Response to NRCs Request for Docketing of Resolved Audit Responses, Chapter 12, Response to Sdaa Question 12.2-3, Re Information Related to FSAR Section 12.2, Radiation Sources | |
ML23353A157 | 31 October 2023 | Nine Mile Point | UFSAR Revision 28 (Redacted Version) | Safe Shutdown Shutdown Margin Reactor Vessel Water Level Safety Limit Minimum Critical Power Ratio High Radiation Area Half scram Ultimate heat sink Mission time Grab sample Offsite Dose Calculation Manual Fire Barrier Stroke time Anticipated operational occurrence Weld Overlay Hydrostatic Probabilistic Risk Assessment Operating Basis Earthquake Temporary Modification Squib VT-2 Emergency Lighting Aging Management Abnormal operational transient Pressure and Temperature Limits Report Surveillance Frequency Control Program Design basis earthquake Scram Discharge Volume Process Control Program Feedwater Controller Failure Battery sizing Overtravel License Renewal Earthquake Control of Heavy Loads Power-Operated Valves Hardened vent Fuel cladding Recently irradiated fuel Accidental discharge Fire Protection Program Power change Coast down GOTHIC Unidentified leakage Failure to Scram |
ML23304A483 | 31 October 2023 | 05200050 | LLC Response to NRCs Request for Docketing of Resolved Audit Responses, Chapter 12, Section 12.2-5, Information Related to Radiation Sources | |
ML23319A076 | 31 October 2023 | Farley | 1 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management | Boric Acid Grab sample Offsite Dose Calculation Manual Anticipated operational occurrence Safe Shutdown Earthquake Fuel cladding Pressure Boundary Leakage Power Uprate |
ML23319A077 | 31 October 2023 | Farley | 1 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection | Boric Acid High Radiation Area Grab sample Anticipated operational occurrence Fuel cladding Overexposure |
ML23299A224 | 26 October 2023 | 11006160 | Export License Issued to International Isotopes Inc PXB190a.03 | |
ML23286A155 | 13 October 2023 | Oyster Creek | Defueled Safety Analysis Report (DSAR) | Offsite Dose Calculation Manual Fire Barrier Tornado Missile Safe Shutdown Earthquake Hydrostatic Coatings Operating Basis Earthquake Aging Management Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program License Renewal Earthquake Turbine Missile Fire Protection Program |
ML23292A142 | 12 October 2023 | Susquehanna | 1 to Updated Final Safety Analysis Report, Section 11.1, Source Terms | Fuel cladding Power Uprate |
ML23292A141 | 12 October 2023 | Susquehanna | 1 to Updated Final Safety Analysis Report, Chapter 15, Section 15.6, Decrease in Reactor Coolant Inventory | Safe Shutdown Safe Shutdown Earthquake Excess Flow Check Valve Earthquake Power Uprate |