Text
F..~
{
.
.
,
- g" 8%g
UNITED STATES
o,#
NUCLEAR REGULATORY COMMISSION
['
- o
REGION til
g
801 WARRENvlLLE ROAD
LISLE,ILLINots 60532-4351
- %
/
Oe**+
February 22, 1999
, Mr. D. R. Gipson'
Senior Vice President
' Nuclear Generation
The Detroit Edison Company
6400 North Dixie Highway
Newport, MI 48166
SUBJECT:
CORRECTIONS TO INSPECTION REPORT 50-341/98015(DRP)
Dear Mr. Gipson:
On December 7,1998, the NRC issued Inspection Report 50-341/98015. In Section 01.1 and
in the executive summary of the report, it was reported that a fire existed in an emergency
diesel generator control panel when, in fact, only smoke had been seen coming from the panel.
Further, in Section M3.1 and in the executive summary, it was incorrectly documented that
loose intemal sleeving on a turbine control valve caused power oscillations greater than
10 percent during plant operation when, in fact, worn threads in a tongue block used to engage
the valve spindle caused power fluctuations of less than 10 percent during plant operation.
Finally, in Section E2.1 and in the executive summary, it was incorrectly reported that the scoop
tube was locked when the unit was returned to service when, in fact, it was unlocked during
plant restart but was returned to the locked position shortly after restart. We are enclosing
corrected sections of the report.
l
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
f
enclosure will be placed in the NRC Public Document Room.
J
Sincerely,
Anton Vegel, C
Reactor Projects Branch 6
Docket No.: 50-341
j
License No.: NPF-43
Enclosures:
Corrections to inspection
Report 50-341/98015(DRP)
j
See Attached Distribution
9903110026 990222
ADOCK 05000341
e
pm
,
.
-~ ..
..
..
..
.
.-
~..
.
.-
...
. . -
- - - . _ . .- .-
.
.
,.
.
, _ ,
.
D. Gipson
-2-
cc w/enci:
N. Peterson, Director, Nuclear Licensing
P. Marquardt, Corporate Legal Department
R. Gaston, Compliance Supervisor
R. Whale, Michigan Public Service Commission
Michigan Department of Environmental Quality
,
Monroe County, Emergency Management Division
l
- Emergency Management Division., Mi Department -
'
of State Police
'
Distnbution-
CAC (E-Mail)
RPC (E-Mail)
Project Mgr., NRR w/enci
J. Dyer, Rl!l w/enci-
)
J. Caldwell, Rlll w/enci
B. Clayton, Rlll w/enci
l
SRI Fermi w/enci
-
DRP w/enci
TSS w/enci
+
DRS (2) w/enci
i
Rill PRR w/enci
PUBLIC IE-01 w/enci
.
Docket File w/enci-
' GREENS
.!
LEO (E-Mail)
DOCDESK (E-Mail)
/
/
i
l
,
10900 W
)
i
h
V ,,e
.
,
V:
February 22, 1999
Mr. D. R. Gipson
'
Senior Vice President-
'
t.
Nuclear Generation -
The Detroit Edison Company
'6400 North Dixie Highway -
- Newport, MI 48166
SUBJECT:
CORRECTIONS TO INSPECTION REPORT 50-341/98015(DRP)
Dear Mr. Gipson:
' On December 7,1998,~ the NRC issued Inspection Report 50-341/98015. In Section 01.1 and
' in the executive summary of the report, it was reported that a fire existed in an emergency
diesel generefor control panel when, in fact,.only smoke had been seen coming from the panel.
Further, in Section M3.1 and in the executive summary, it was incorrectly documented in the
report that loose internal sleeving on a turbine control valve caused power oscillations greater
than 10 percent during plant operation when, in fact, wom threads in a tongue block used to
engage the valve spindle caused power fluctuations of less than 10 percent during plant
operation; Finally, in Section E2.1 and in the executive summary, it was incorrectly reported
that the scoop tube was locked when the unit was retumed to service when, in fact, it was
unlocked during plant restart but was returned to the locked position shortly after restart. We
,
are enclosing corrected sections of the report.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its
- enclosure will be placed in the NRC Public Document Room.
Sincerely,
/s/ A. Vegel
Anton Vegel, Chief
Reactor Projects Branch 6
Docket No.: 50-341
License No.: NPF-43
Enclosures:
Corrections to inspection
,
Report 50-341/98015(DRP)
See Attached Distribution
. DOCUMENT NAME: G:\\FERM\\FER98019.DRP
1.
_. .
--
v . c
-~. v . co
-. . . %
OFFICE
Rill
ltl
Rlll
_ ; l'
l
l
NAME-
CPhillips/mi M
AVegel - /hl
'
DATE
02/)h99
'
02M/99
OFFICIAL RECORD COPY
-
,
. . . . - _ . - .
.-..- - -__ _
.
. . .
D. Gipson-
-2-
<
cc w/enet:
N. Peterson, Director, Nuclear Licensing
P. Marquardt, Corporate Legal Department
R. Gaston, Compliance Supervisor
R. Whale, Michigan Public Service Commission
i
Michigan Department of Environmental Quality
Monroe County, Emergency Management Division
' Emergency Management Division, MI Department -
. of State Police
i
!
I
'
li-
.
,
j
l1
l
L
,
,
'&
'
.!
,
,
J
?
+.
._
- . ,
, . ,
=.
-