Forwards Insp Rept 50-341/99-01 on 990619-0723 & Nov. Violation of Concern Because Operators Did Not Understand License Requirements & Placed Plant in Configuration Where EDG 11 Was Removed from Service
ML20210Q403
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 08/10/1999
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Gipson D
DETROIT EDISON CO.
Shared Package
ML20210Q409 List:
References
50-341-99-01, EA-99-185, NUDOCS 9908160022
Download: ML20210Q403 (5)


Text

SUBJECT:

FERMI INSPECTION REPORT 50-341/99010(DRP) AND NOTICE OF VIOLATION

Dear Mr. Gipson:

-

This refers to the inspection conducted on June 19 through July 23,1999, at the Fermi 2 Facility. The enclosed report presents the results of this inspection.

During this inspection period, the plant was operated in a safe and conservative manner.

Responses to a severed offsite fiber optic cable, that caused a loss of telecommunication with Monroe County local authorities, and to a small fire on a radiation monitor sample pump were prompt and effective. Engineering support to resolve equipment deficiencies was effective.

Although management had focused resources to resolve zebra mussel infestation on the risk significant general service water system, racent heat exchanger fouling caused by the zebra mussels has placed burdens on plant personncl. Eradication of zebra mussels could have been resolved earlier had this issue initially been addressed aggressively.

Based on the results of this inspection, the NRC has determined that a violation of NRC requirements occurred. The violation is cited in the enclosed Notice of Violation (Notice) and the circumstances surrounding it are described in detail in the subject inspection report. The violation is of concem because operators did not understand license requirements and placed the plant in a configuration where Emergency Diesel Generator 11 was removed from service and the opposite division Standby Liquid Control System B was inoperable for approximately 32 hours3.703704e-4 days <br />0.00889 hours <br />5.291005e-5 weeks <br />1.2176e-5 months <br />. Consequently, a plant shutdown was not performed per Technical Specification requirements. This is considered a Severity Level IV violation.

As a result of discussions with your staff on July 23,1999, we understand that you do not agree with our conclusions regarding the applicability of the Technical Specification to the configuration in question. Accordingly, you have not initiated corrective actions to prevent rec'Jrrence of the violation and, therefore, this violation is being cited consistent with our enforcement policy.

You are required to respond to this letter and should follow the instructions specified in the enclosed Notice when preparing your response. In your response letter, you are encouraged to provide the technical basis for your denial of the violation. The NRC will use your response, in part, to determine whether further enforcement action is necessary to ensure compliance with regulatory requirements.

"

9908160022 990810 PDR ADOCK 05000341

PDR

l

.

. Based on the results of this inspection, the NRC has also determined that an additional violation of NRC requirements occurred in 1998 regarding the adequacy of a dedicated shutdown procedure. This violation is being treated as a Non-Cited Violation (NCV), consistent with Appendix C of the Enforcement Policy. The NCV is described in the subject inspection report.

If you contest the violation or severity level of the NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear

- Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001, with copies to the Regional Administrator, Region Ill, and the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 20555-0001, In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its enclosure, and your response, will be placed in the NRC Public Document Room.

Sincerely,

,

O E f. W jffre E. Gr Direc Division of Reactor Projects

)

Docket No. 50-341 License No. NPF-43 Enclosures:

1. Inspection Report 50-341/99010(DRP)

2. Notice of Violation cc w/encis:

N. Peterson, Director, Nuclear Licensing P. Marquardt, Corporate Legal Department R. Gaston, Compliance Supervisor R. Whale, Michigan Public Service Commission Michigan Department of Environmental Quality Monroe County, Emergency Management Division Emergency Management Division Ml Department of State Police u

f

'n

,..,

.

l

-

,

h-Distribution:

' CAC (E-Mail)

RPC (E-Mail)

' OE:EA File R. Borchardt, OE w/encls

.

D. Dambly, OGC w/encls V. Ordaz, NRR w/encls -

Project Mgr., NRR w/encls J. Caldwell, Rill w/encls j

B. Clayton, Rlll w/encls i

SRI Fermt w/encls DRP w/encls DRS w/encls

Rlli PRR w/encls

'

PUBLIC IE-01 w/encls.

Docket File w/encls GREENS LEO (E-Mall)

DOCDESK (E-Mail)

i l

i I

i IG0002 l

.

L

1.

I

! Based on the results of this inspection, the NRC has also determined that an aCditional violation of NRC requirements occurred in 1998 regarding the adequacy of a dedicated shutdown procedure. This violation is being treated as a Non-Cited Violation (NCV), consistent with Appendix C of the Enforcement Policy. The NCV is described in the subject inspection report.

If you contest the violation or severity level of the NCV, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001, with copies to the Regional Administrator, Region lit, and the Director, Office of Enforcement, United l

States Nuclear Regulatory Commission, Washington, DC 20555-0001.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its enclosure, and your response, will be placed in the NRC Public Document Room.

Sincerely,

/S/ G. E. Grant Geoffrey E. Grant, Director Division of Reactor Projects

'

Docket No. 50-341 License No. NPF-43 Enclosures:

1. Inspection Report 50-341/99010(DRP)

2. Notice of Violation cc w/encls:

N. Peterson, Director, Nuclear Licensing P. Marquardt, Corporate Legal Department R. Gaston, Compliance Supervisor R. Whale, Michigan Public Service Commission Michigan Department of Environmental Quality Monroe County, Emergency Management Division Emergency Management Division Mi Department of State Police f

DOCUMENT NAME: G:\\FERM\\FER99010.DRP

'

  • See previous concurrences To receive a co >y of thiS JoCument. Indicate in the box "C" = Copy w/o attach /enci "E" = Copy w/ attach /enci "N" = No copy l

OFFICE

'rsill:DRP l

' Rill:EICS Rill:DRP l

l NAME AVegel/ml/kic BClayton GGrant @b)(

DATE 08/03/99 08/06/99 085) /99( )/ )

._

OFFICIAL RECORD COPY

m

.,

i l i..

L

= Based on the results of this inspection, the NRC has also determined that 'an additional violation of NRC requirements occurred in 1998 regarding the adequacy of a dedicated shutdown

,-

procedure. This violation is being treated as a Non-Cited Violation (NCV), consistent with

'

Appendix C of the Enforcement Policy. ' The NCV is described in the subject inspection report.

. If you contest the violation or severity level of the NCV, you should provide a response within

. 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear

.

. Regulatory Commission, ATTN: Document Control Desk, Washington DC 20555-0001, with

!:

l

, copies to the Regional Administrator, Region Ill, and the Director, Office of Enforcement, United l

States Nuclear Regulatory Commission, Washington, DC 20555-0001.

l-

'

. In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its enclosure, and your response, will be placed in the NRC Public Document Room.

Sincerely, l-Geoffrey E. Grant, Director Division of Reactor Projects

!

Docket No. 50-341 i

!

License No. NPF-43 Enclosures:

1. Inspection Report 50-341/99010(DRP)

2. Notice of Violation

!

l cc w/encis:

N. Peterson, Director, Nuclear Licensing P. Marquardt, Corporate Legal Department R. Gaston, Compliance Supervisor R. Whale, Michigan Public Service Commission Michigan Department of Environmental Quality Monroe County, Emergency Management Division

l Emergency Management Division Ml Department of State Police DOCUMENT NAME: G:\\FERM\\FER99010.DRP To receive a co >y of this document, indicate in the box "C" = Copy w/o attach /enci"E" = Copy w/ attach /enct "N" = No copy OFFICE Rill:DRP

/6 Rlli:EICS lE Rlll:DRP l

l

,

NAME AVegel/ml/kJM BClayton /c #

GGrant

DATE 108/3/99-08/4499 08/ /99

,

6&ahscockn( M O yre ft/gt & G