Advises That Util 900126 Response to NRC Bulletin 89-002, Stress Corrosion Cracking of High-Hardness Type-410 Stainless Steel Internal Preloaded Bolting in Anchor/Darling Model S350W Swing Check Valves... Acceptable
ML20059E929
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 08/30/1990
From: Stang J
Office of Nuclear Reactor Regulation
To: Orser W
DETROIT EDISON CO.
References
IEB-89-002, IEB-89-2, TAC-74255, NUDOCS 9009110007
Download: ML20059E929 (3)


Text

__

August 30, 1990 y

p. L Docket No. 50-341' Mr. William S. Orser R' Senior Vice President - Nuclear Operations

. Detroit Edison Company 6400 North Dixie Highway Newport, Michigan 48166

Dear Mr. Orser:

SUBsECT: FERMI-2 RESPONSE TO NRC BULLETIN 89-02 " STRESS CORROSION CRACKING OF 3 HIGH-HARDI4ESS TYPE-410 STAINLESS STEEL INTERNAL PRELOADED BOLTING. IN ANCHOR DARLING MODEL S350W SWING CHECK VALVES GR VALVES OF EIMILAR-DESIGN" (TAC NO. 74255) q{

By letter dated January 26, 1990 (NRC-90-0013), Detroit Edison. Company'(Deco) j responded to-NRC Bulletin 89-02 concerning certain swing check valve.c which i may contain preload bolting material of ASfM Specification A193, prade-B6, ,

type-410 stainless steel. The subject bulletin requested Detroit idison Company (DECO) to identify whether any swing. check valves which ma,' contain  !

type-410 stainless steel bolting material were installed at Fe:m' .a .vour- '

response confirmed that the inspections requested by the subject P.11etin had 4

bei. ?erformed and these inspections indicated that no such check vi ves were installed at Fermi-2. In addition, your response stated that the ma ufacturers  ;

of other safety-related check valves were consulted and their documeits reviewed, i None of these manufacturers used preload type-410 stainiess steel bolcing. I matarial in their check valves supplied to Fermi-2.

The staff has reviewed your response to Bulletin 89-0? and finds your response has met all the requirements of the bulletin. - Therefore, the staff finds your response to Bulletin 89-02 to be acceptable and no additional actions are required. The staff recommends that the analysis prepared in resoonse to-the bulletin be kept on file for further review by NRC inspectors.

Si nc'erely, '

i hMN '

John Stang, Project Manager Project Directorate III-1 _ i s Division of Reactor Projects - III, i IV, V & Special Projects .

Office of Nuclear Reactor Regulation .I.

cc: See next page DISTRIBUTION /

Docket fi~.e V EJordan NRC & Local PDRs TMarsh PD31'R/F DCrutchfield JZwolinski ACRS(10)

OGC JStang BClayton, RIII SMeador f

LA/PD31:D PM/ 1:DRSP DRSP NRR/E .B D/P$

o or J RPi tsn TMar SMeag/9 j/p 9' /90  %/SM9 /90 g 9009110007 900630 v PDR ADOCK 05000341 Q PDC 1{d

d o - UNITED STATES g

[ p NUCLEAR REGULATORY COMMISSION 5  :

  • WASHINGTON, 0. c. 20665 g /. August 30, 1990 Docket No.-50-341  !

1 i

l

( Mr. William S. Orser I Senior Vice President - Nuclear

! Operations Detroit Edison Company 6400 North Dixie Highway Newport, Michigan 48166

Dear Mr. Orser:

SUBJECT:

FERMI-2 RESPONSE TO NRC 80LLETIN 89-02, " STRESS CORROSION' CRACKING OF HIGH-HARDNESS TYPE-413 STAINLESS STEEL INTERNAL PRELOADED BOLTING IN ANCHOR DARLING MODEL S350W SWING CHECK VALVES OR VALVES OF SIMILAR ,

DESIGN" (TAC NO. 74255)

By letter dated Jant:ary 26, 1990 (NRC-90-0013), Detroit Edison Company (Deco) responded to NRC Bulletin 89-02 concerning certain swing check valves which may contain preload bolting material of ASTM Specification A193, grade B6, type-410 stainless stc0 The subject bulletin requested Detroit Edison Company (DECO) to identiiy whether any swing check valves which may contain

( type-410 stainless steel bolting material were installed at Fermi-2. Your'  ;

response confirmed that the inspections requested by the subject bulletin had been performed and these in g 5. ions indicated that no such check valves were installed at Fermi-2. In addition, your response stated that the manufacturers of other safety related check valves were consulted and their documents reviewed.

None of these manufacturers used preload type-410 stainless steel bolting material in their check valves supplied to Fermi-2.

The staff has reviewed your response to Bulletin 89-02 and findi, your response has met all the requirements of the bulletin. Therefore, the staff finds your response to Bulletin 89-02 to be acceptabic and no additional actions are required. The staff recommends that the analysis prepared in response to the bulletin be kept on file for further review by NRC inspectors.

Sincerely, ohn Stang, Project Manager i Project Diractorate III-1 Division of Reactor Projects - III, IV, V & Special Projects Office of Nuclear Reactor Regulation ec: See next page

a Mr. Willierr. Orser Fermi-2 Facility ~  :

Detroit Edison Company '

cc:

John Flynn Esq.

Senior Attorney

[. Detroit Edison Company .i i

2000 Second Avenue Detroit, Michigan 48226

!!uclear Facilities and Environinental Monitoring Section Office-Division of Radiological Health ,

F. O. Box 30195 '

Larising, Michigan 48909

!!r. Walt Rogers U.S. iluelear Regulatory Connission -

Resident Inspector's Office 6450 W. Dixie Highway Newport, Michigan 48166 tionroe County Office of Civil Preparedness 963 Scuth Raisinville

!!cnroe, Michigan 48161 Regior,a1 Adn.inistrator, Region III U.S. Nuclear Regulatory Courission 799 Roosevelt' Road Glen Ellyn, Illinois 60137

~

Ms. Lynr.e Goodman Supervisor - Licerising Detroit Edison Company .

Feriti Uriit 2 6400 f: orth Dixie Eighway.

I l'ewport, Michigan 48166 s

l o 1

4 l

.. -, . . . - . - . . -. ..-. . , , .