NRC-99-0094, Forwards Safeguards Event Rept 99-S01-00 for Reportable Event That Occurred on 990922.Commitments Made by Util Listed

From kanterella
Jump to navigation Jump to search
Forwards Safeguards Event Rept 99-S01-00 for Reportable Event That Occurred on 990922.Commitments Made by Util Listed
ML20217P338
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 10/22/1999
From: Gipson D
DETROIT EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20217P344 List:
References
CON-NRC-99-0094 NUDOCS 9910290269
Download: ML20217P338 (2)


Text

...  :,

Dougtas R. Ghson Senior Vice President, Nuclear Generation Ferm12 6400 North Dixie llwy, Newport, Michigan 48166 Tel: 734.686.5201 Fax: 734.686.4172 Detroit Edison l 10CFR73.71 Octobei 22,1999

, NRC-99-004 U S Nuclear Regulatory Commission Attention: Document Control Desk Washington D C 20555-0001

Reference:

Fermi 2' NRC Docket No. 50-341 NRC License No. NPF-43 i

Subject:

Safecuards Event Report (SER) No. 99-S01 Please find enclosed Safeguards Event Report (SER) No. 99-S01, dated October 22, 1999 for a reportable event that occurred on September 22,1999, While there was no malevolent intent, and no actual impact en the health and safety of the public associated with this event, Detroit Edison recognizes its significance, and has instituted immediate remedial actions as described in the enclosed report.

The additional measures described belov/, and in the enclosed report, are being taken to address the underlying causes of this event.

The following commitments are being made in this SER:

1. Conduct Manual Procedure MGA09, " Access Control" will be revised to i I

include guidance for vehicle searches when multiple security personnel are required to complete the search. Included in the revision will be guidance to conduct a " pre-job briefing" prior to search activities that will involve more than one person. Also included will be a self-checking or peer checking mechanism, to ensure all steps have been completed. Procedure MGA09 will be revised by December 10,1999.

I

'T 280 013 \

-['

9910290269 991022 31 PDR ADOCK O g  :

A DTE Energy Company

1

NRC-99-0094 Page 2 4 E

2. Security Training Lesson Plans and Critical Task Certification Questions will be developed and/or revised to include " team" searches of vehicles. Training of all personnel in the Security Department who are task certified to the position of Watchperson will be completed by December 31,1999.

i 1

As part of familiarization with the proposed new NRC Oversight Process, Detroit l Edison reviews selected events under that process. This event was evaluated using the current version of the Physical Security Significance Determination Process (SDP) included with SECY-99-007A, " Recommendation for Reactor Oversight Process Improvements." Detroit Edison's assessment of this event using this process considered, the absence of malevolent intent, the immediate actions of the security force, lack of other circumstances which could have aggravated the consequences, I and singularity of this type of event within the past twelve months. Based on these factors, the SDP guidance indicates that this event falls within the Licensee's  ;

Response Band (" Green" band) and would be appropriately resolved within the j conective action program. Detroit Edison realizes that the new NRC oversight process is under development and is continuing to evolve with the experience of the pilot plants. Nonetheless, the application of this process provides an objective assessment of the significance of this event.

Please contact Mr. Joseph Korte, Director - Nuclear Security, et (734) 586-1095 if you have any questions.

Sincerely,

/ \

j) l cc: J. L. Belanger  ;

i J. E. Dyer A. J. Kugler  ;

A. Vegel l M. V. Yudasz, Jr.  ;

NRC Resident Office I Region III Wayne County Emergency Management Division  !