NRC-99-0085, Forwards Rev 15 to Fermi 2 Security Personnel Training & Qualification Plan, IAW 10CFR50.54(p)(2).Without Encl

From kanterella
Jump to navigation Jump to search
Forwards Rev 15 to Fermi 2 Security Personnel Training & Qualification Plan, IAW 10CFR50.54(p)(2).Without Encl
ML20217P707
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 10/22/1999
From: Peterson N
DETROIT EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CON-NRC-99-0085 NUDOCS 9910290372
Download: ML20217P707 (2)


Text

Ferm12

. 6400 North Dixie liwy., Neoport, MI 48166 Detroit Edison October 22,1999 NRC-99-0085 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D C 20555-0001

Reference:

Fermi 2 NRC Docket No.50-34i NRC License No. NPF-43

Subject:

Submittal of Fermi 2 Security Personnel Training and Oualification Plan. Revision 15 The purpose of this letter is to submit the Fermi 2 Security Personnel Training and Qualification Plan (SPT&QP), Revision 15, in accordance with 10CFR50.54(p)(2).

A summary of the changes made in the Sirr&QP is enclosed. Additionally, Chapter 3 and the Table of Contents are enclosed. Changes to the text are highlighted (shaded). Deleted text is not identified with markings. The changes made under this revision do not decrease the overall effectiveness of the SPT&QP.

If there are questions regarding this submittal, please contact Mr. Joseph H. Korte, Director - Nuclear Security at (734) 586-1095.

Sincerely, Norman K. Peterson l Director - Nuclear Licensing Enclosures i cc: J. R. Creed [2 copies w/ enclosures]

A. J. Kugler [w/o enclosure]

NRC Resident Office [w/o enclosure]

Regional Administrator, Region III [w/o enclosure]

p ;,()9 USNRC Document Control Desk [3 copies w/ original]

L-9910290372 991022 L PDR ADOCK 05000341 F PDR A DTE Energy Company

Enclosure 1 to MRC-99-0085 4 Page1of1 I

The new periodicity of night firing for familiarization in SPT&QP, Section 3.4.2, was selected based on the performance of the plant's protected and vital area lighting. Performance factors considered include:

=

There have not been any lighting failures / deficiencies noted in the Safeguards Event Log for the past 24 months. .

=

An effective preventive maintenance program is in place for the protected area lighting.

=

' Nuclear Security personnel routinely patrol the protected area, noting any lighting deficiencies.

=

Maintenance personnel repair any lighting deficiencies based on input from Nuclear Security inspections.

=

The vital areas have normal lighting, essential lighting which runs off of an emergency power supply, and emergency lighting which has a battery backup.