ML20151Y243

From kanterella
Revision as of 21:05, 10 December 2021 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Forwards Safety Evaluation & Second Interval Inservice Insp Program Cooper Nuclear Station Re 840301 & 850315 Requests for Relief from Inservice Insp Requirements.Relief Requests Granted Except Requests Re RHR Drywell Spray
ML20151Y243
Person / Time
Site: Cooper Entergy icon.png
Issue date: 01/27/1986
From: Muller D
Office of Nuclear Reactor Regulation
To: Pilant J
NEBRASKA PUBLIC POWER DISTRICT
Shared Package
ML20151Y247 List:
References
TAC-54588, NUDOCS 8602120629
Download: ML20151Y243 (3)


Text

- - - _

J Tiet'No.: 50-298 Mr. J. M. Pilant, Technical Staff Manager JAW y 7 ;ggg Nuclear Power Group Nebraska Public Power District Post Office Box 499 Columbus, Nebraska 69601

Dear Mr. Pilant:

SUBJECT:

SECOND 10-YEAR INSPECTION PROGRAM Re: Cooper Nuclear Station By letters dated March 1, 1984 and March 15, 1985, you submitted the Inservice Inspection (ISI) Plan and additional information for the second ten year inspection interval at Cooper Nuclear Station. In these letters you also requested relief from ASME Code requirements for certain items.

We have completed our review of your submittals and we have concluded that your ISI program and relief requests are appropriate except as indicated by the enclosed Safety Evaluation and Technical Evaluation Report. In reaching this conclusion, we have determined that the inspection and testing requirements are impractical for the items for which relief is being granted and, pursuant to 10 CFR 50.55a (g)(6)(i), that the granting of relief is authorized by law, will not endanger life or property or the common defense and security, and is otherwise in the public interest. In making this determination, we have given due consideration to the burden that could result if those requirements were imposed on your facility.

9602120629 e60:27 8 PDR ADOCK 0500 G

Mr. J. M. Pilant .

Therefore, subject to the provisions in the Safety Evaluation, all of your pending relief requests relative to the ISI program are hereby granted except for that associated with Residual Heat Removal Drywell Spray Inside Drywell (Items C5.10 and C5.20).

Sincerely,

, ,1 c: svl L/

c,....;l ;<. M ul:ct ,

Daniel R. ?!uller, Director BWR Project Directorate #2 Division of BWR Licensing

Enclosures:

DISTRIBUTI0ft:

As stated Docket <Eiler.

NRC PDR ccw/ enclosures Local PDR See next page RBernero Sflorris ESylvester Project Manager OELD LHarmon EJordan BGrimes JPartlow TBarnhart (4 cys for each docket No.)

WJones F08 for appropriate Division ACRS (10)

OPA LFMB Gray File OFFICIAL RECORD COPY DBL: PD#2 DBL:PD#2'##' OELD DBL: :D SNo ESylvester f1Karman er 12/43/85 1246/85 01/jj /86 t'//8[

Q. '& \}b

,. s

s Mr. J. M. Pilant Nebraska Public Power District Cooper Nuclear Station cc:

Mr. G. D. Watson, General Counsel Nebraska Public Power District P. O. Box 4999 Columbus, Nebraska 68601 Mr. Arthur C. Gehr, Attorney Snell & Wilmer 3100 Valley Center Phoenix, Arizona 85073 Cooper Nuclear Station ATTN: Mr. Paul Thomason, Division Manager of fluclear Operations P. O. Box 98 Brownville, Nebraska 68321 Director Nebraska Department of Environcental Control P. O. Box 94877 State House Station Lincoln, Nebraska 68509 Mr. William Siebert, Comissioner Nemaha County Board of Connissioners Nemaha County Courthouse Auburn, Nebraska 68305 Resident Inspector U.S. Nuclear Regulatory Comission P. O. Box 218 Brownville, Nebraska 68321 Regional Administrator, Region IV U.S. Nuclear Regulatory Comission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 760';

H. Ellis Simons, Director Division of Radiological Health Department of Health 301 Centennial Mall, South P. O. Box 95007 Lincoln, Nebraska 68509

)

l I

9 . ^{,h