Followup Special Rept Re Inoperable Fire Doors Found During Jul 1989 Surveillance & Consists of Nine Latching Mechanism Failures & Two Closure Mechanism Failures.Fire Watches Established.No Doors Found Blocked Open in Jul
ML20246D788
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 08/09/1989
From: Nandy F
SOUTHERN CALIFORNIA EDISON CO.
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
NUDOCS 8908280267
Download: ML20246D788 (2)


Text

_ , _ .

. .; r .,

h. y

..~ $"%yn, Af Southem Califomia Edison Company P. O. BOX 000

.1244 WALNUT GROVE AVENUE ROSEMEAD. CALIFORNIA 91770 F.R.NANDY TEL.E PHONE m~.or o,~ucu. ucE~mwo August 9, 1989 mim = =

c, U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement _.

Region V -

1450 Maria Lane, Suite 210  :-

Walnut' Creek, California 94596-5368 ._

Attention: Mr. J. B. Martin, Regional Administrator N..

cc Gentlemen: -

Subject:

Docket Hos. 50-361 and 50-362 Follow-up Report, Inoperable Fire Doors -- July 1989 San Onofre Nuclear Generating Station, Units 2 & 3 The purpose of this letter is to provide a follow-up report for Technical Specification fire-rated assemblies (specifically fire doors) found inoperable during routine surveillance in July 1989. This monthly report and previous monthly reports provide updated information associated with the initial 1983 report.

The attachment to this letter identife.s fire doors found inoperable during the July reutine surveillance ar.d consists of: 9 1atching mechanism failures and

? closare mechanism failures. As each of these deficiencies was identified, compensatory fire watches were established pursuant to Technical Specification 3.7.9, Action Statement "a". No doors were found to be blocked open in July.

If you require any additional information, please advise.

Very'truly yours,

/

/

Enclosure cc: C. Caldwell (USNRC Senior Resident Inspector, Units 1, 2 and 3)

U. S. Nuclear Regulatory Commission Document Control Desk Institute of Nuclear Power Operations (INPO) kB2Bo267s90go9 r-S DOCK 05000361 sc PNU u.

1

;.gg .

, ph

. ATTACHMENT

, . SOUTHERN CALIFORNIA EDIS0N COMPANY INOPERABLE FIRE DOORS-FOR THE MONTH OF. JULY 1989

SAN ONOFRE' NUCLEAR GENERATING STATION i UNITS 2 AND 3, DOCKET-NOS. 50-361~and 50-362
1. Latchina Mechanism Failures:

Number of doors inoperable - 9, as follows:

Door Number Inonerable Operable AC-121' 06/20/89 07/03/89 AC-105- 06/22/89 - - -

AC-428- 06/27/89 -- -

C2-406 06/30/89 07/31/89 AC-221. 07/05/89 07/25/89 AC-223 07/06/89 07/25/89 FH2-101 07/22/89 - - -

FH3-103 07/22/89 - - -

"FH3-404 07/25/89 - - -

II. Closure Mechanism Failures:

Number of doors inop7rable - 2, as follows:

Door Number Inocerable Operable AC-119 04/30/89 - - -

AC-221 07/05/89 07/25/89 III. Doors Blocked Ooen:

Number of doors blocked open - None

- fdr.jul/l