Special Rept:On 921021,determined That SG Was Inoperable for More than 30 Days Following Performance of Monthly Surveillance Test.Caused by Failure in Field Sensor.Repair Will Be Made During Next Outage of Sufficient Duration
ML20117A581
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 11/24/1992
From: Marsh W
SOUTHERN CALIFORNIA EDISON CO.
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
NUDOCS 9211300183
Download: ML20117A581 (2)


Text

_

o,

e gwm 5

  1. AM 4-Southern California Edison Company P3 PARKER STREET fHWNE. CALIFORNIA 92718

- wnne c wnsa m mm.

AS$16f ANT MANAGE R.

(714)454-4403 hurt $ AR FtEGs/LATORY AFF A Fig November 24, 1992 i

Mr. John B. Martin, Administrator U. S. Nuclear Regulatory Commission, Region V 1450 Maria Lane, Suite 210 Walnut Cret9, CA 94596-5368

Dear Mr. Martin:

Subject:

Docket No. 50-361 Special Report San Onofre Nuclear Generating Station, Unit 2-This report is being submitted in accordance with Technical Specification (TS) 3.3.3.3.a of Facility Operating License NPF-10,-San Onofre Unit 2.

The TS requires Southern California Edison (SCE' to submit a special re) ort when the seismic monitoring instrumentation becomes inoperable for more t1an 30 days, i

On October 21, 1992, with Unit 2 in Mode 1 at 100% power, steam generator base support strong motion accelerometer (SMA) 2XT-8020B was determined to be Specifically, the vertical channel of 2XT-8020B did not respond as required by

_ l inoperable followino the performance of a routine monthly surveillance test.

procedure S023-11-2.1, " Surveillance Requirement Seismic Time History Accelerometer Model SMA-3 Functional Test."

Initial troubleshooting of the seismic instrumentation components and circuitry identified the malfunction to be associated with the 2XT-80208 field Further troubleshooting will require containment entry for accessing sensor.

2XT-80208. Due to radiation exposure considerations during power operations, personnel are precluded from performing further investigstive efforts.

. Troubleshooting and repair efforts for 2XT-8020B will be performed during the next Unit 2 shutdown of sufficient duration.

Other seismic instrumentation has remained operable (except for routine i

surveillances), so the ability to detect and measure the effects of an earthquake has not been significantly impaired.

l 30002S 9211300183 921124

~

PDR.ADOCK 05000361 S

PDR s

\\ O n

\\;

a

~

Mr. John B. Martin, Administrator November 24, 1992 If you require any additional information, please let me know.

Sincerely, 2lh0llfdi' cc:

U. S. Nuclear Regulatory Commission Document Control Desk M. B. Fields, NRC Project Manager, San Onofre Units 2 and 3 C. W. Caldwell, NRC Senior Resident inspector, San Onofre Units 1, 2 & 3