Part 21 Rept Re Deficiency Identified in Event 32725, Corrected by Mgp Instruments Inc.Licensee Verified,Affected Equipment Has Been Reworked & Tested at Sce.Design Mod Completed
ML20236N387
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 07/09/1998
From: Rosanski K
AFFILIATION NOT ASSIGNED
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
REF-PT21-98 NUDOCS 9807150108
Download: ML20236N387 (1)


Text

f L l4jMGP INSTRUMENTS Suite 150 -

5000 Highlands Parkway )

Smyrna. GA 30082 -

Tel: (770)432 2744 Fax: (770)432-9179

' July 9,1998 US NRC Headquaners Operations Center Document Control Desk Nuclear Regulatory Commission Washington DC 20555

Subject:

Closure of Corrective Ac ela== relative for 10 CFR 21 Notification MGP instruments Inc.

Radiation Monitoring System, Power Supply Circuit Boards Premature electronic component failure of component "VD-9" US NRC Ref. Event 32725

Dear Madam or Sir,

As a counesy, MGP Instruments Inc (MGPI) wishes to inform the Commission that the deficiency identified in Event No. 32725, has been corrected by MGP Instruments Inc. Please note:

1. The affected equipment (i.e. Radiation Monitor- Safety Related Local Processing Units) was confirmed to have an impact only at Southern California Edison's, San Onofre site as originally notified.
2. MGPI has verified that all affected equipment (total 28 safety related units) has been reworked and tested at Southern California Edison.

i

3. Corrective action in the form of design modification has also been completed.

Additional information about this issue can be obtained by contacting the undersigned or Mr. David Jarrow MGP Instruments Inc. Quality Assurance Manager at (770) 432-2744, extension 119.

Sibcerely Yours:

C i k <!.

- Kenribth F. RosanskT '

Senior Vice President

KFR/dj .[iVUU7 / \

l M l Attachments: 1 cc: Southern California Edison - Mr. Ken Slagle, Manager Nuclear Oversight Division.

Southern California Edison - Mr. James K. Huey, Project Manager, RMS Southern California Edison - Mr. Robert Mc Wey Quality Assurance MGP Instruments SA, Lamanon France: J. F Croce Spinelli, F. Chlosta, B. Morel, A. Pommier l MGP instruments Inc. Atlanta: Mr. David Jarrow, Mr. Mike Edelmen, Mr. Sergio Lopez 9907150108 980709 E 1