ML20210Q652

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for July 1999 for Songs,Units 2 & 3
ML20210Q652
Person / Time
Site: San Onofre  
Issue date: 07/31/1999
From: Williams C
SOUTHERN CALIFORNIA EDISON CO.
To:
Shared Package
ML20210Q651 List:
References
NUDOCS 9908160076
Download: ML20210Q652 (8)


Text

-.

NRC Monthly Operating Report, July 1999 San Onofre Nuclear Generating Station, Unit 2 i

I 9908160076 990812 PDR ADOCK 05000361 R

PDR.

\\

p.

USNRC MONTHLY OPERATING REPORT Docket No:

50-361 SAN ONOFRE NUCLEAR GENERATING STATION Unit Name:

SONGS-2 UNIT 2 Date:

August 12,1999 July 1999 Completed by: C. E. Williams Telephone:

(949) 368-6707 Page 1 of 3 OPERATING DATA REPORT ld!/.Desigh Electrical. Rating (Net'MWe)s 310703 2

Maximum Dependable Capacity (Gross MWe) 1127 93!

Maximum ~ Dependable' Capacity: (Not MWe)?

M070;;

This Month

  • Yr-to-Date*

Cumulative

  • jfj WMN8ursh Psriod

@MI -

[5;os73 j)3s,s4sj!

4 5

Number cf Hours Reactor Was Critical 744 3,832 109,314

{6} NoiiifilGsnsfatMOn-Nrie!!Q 174B

,%7741 do74th 7 (Ur.;t Reserve Shutdown Hours 0

0 0

18f Inst Efectricsi;Edergy.Genersied]

  • lio25;i167^

$$14(9293 d1D8$170)

  • Rounded

USNRC MONTHLY OPERATING REPORT Docket No:

50-361 i

SAN ONOFRE NUCLEAR GENERATING STATION Unit Name:

SONGS-2 UNIT 2 Date:

August 12,1999 July 1999 Completed by: C. E. Williams Telephone:

(949) 368-6707 Page 2 of 3 l

l 1

UNIT SHUTDOWNS AND POWER REDUCTIONS l

JNoh6 F <

NQmber

,l >

~'l

',Jeb -

Date N/A iT9peL(1)!!.Sa J,

a

' "?

  • A 79 N/A F -

Duration (Hours)

N/A Reason (2)1i as (N/Ai

s.

Method of shutting down reactor (3)

N/A

~#

LER Nok

.m m

M FN/M an M System Code (4)

N/A ComponentLCode(5)T 4 SMe s c

WW

. !N/A? N Cause and corrective action to prevent N/A (1) F-Forced S-Scheduled (2) Reason:

A-Equipment Fakure (Explain)

J B-Maintenance or Test C-Refueling -

D-Regulatory Restriction 1

E-Operator Training & License Examination F-Administrative G-Operatienal Error (Explain)

H-Other (Explain)

(3) Method 1-Manual 2-Manual Scram 3-Automate Scram 4-Continuation from Previous Month 5-Reduction in the Average RWry Power Level of more than 20% from the previous day 6-Other (Explain)

(4) (EEE Std 805-1984 (5) IEEE Std 803A-1983

USNRC MONTHLY OPERATING REPORT Docket No:

50-361 SAN ONOFRE NUCLEAR GENERATING STATION Unit Name:

SONGS-2 l

UNIT 2 Date:

August 12,1999 I

July 1999 Completed by: C. E. Williams Telephone:

(949) 368-6707 Page 3 of 3

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH Date Time Event 67/01/994 00011 ModeL11l:99;6% Reador P6wern1124 MWei 07/31/99 2400 Mode 1,99.9% Reactor Power,1164 MWe

'r, L

?

I l

4 1

I 1

I

+.

NRC Monthly Operating Report, July 1999 San Onofre Nuclear Generating Station, Unit 3 I

l j

~

]

3

~.,

USNRC MONTHLY OPERATING REPORT Docket No:

50-362 SAN ONOFRE NUCLEAR GENERATING STATION Unit Name:

SONGS-3 UNIT 3 Date:

August 12,1999 July 1999.

Completed by: C. E. Williams Telephone:

(949) 368-6707 Page 1 of 3 OPERATING DATA REPORT di Design'Els:trical' Rating"(Net MWe)1 *Wi#* * % ^.

W1080jh 2

Maximum Dependable Capacity (Gross MWe) 1127 33B : Maximum Dopendable: Capacity;(Not MWe)W < ; we M m

~

u 41080!it l

This Month

  • Yr-to-Date* Cumulative
  • i

' ?O NumberMHoursistPeriod' dip sa w 47 2s m3 gads.os7ji.

1134; aces 4

Number of Hours Reactor Was Critical 744 4,048 109,164

?5}i Hours Genefits:On-line N aar e ~

6744b is,sesF 1107/182:1=

6 Unit Reserve Shutdown Hours o

o o

1 474 : Net Electrical Energp Generated (MWh)

!417;40e? -

14348~6481

'%112,010,0003

  • Rounded i

l

J e

USNRC MONTHLY OPERATING REPORT Docket No:

50-362 SAN ONOFRE NUCLEAR GENERATING STATION Unit Name:

SONGS-3 UNIT 3 Date:

August 12,1999 l:

July 1999 Completed by: C. E. Williams

)

Telephone:

(949) 368-6707 Page 2 of 3 i

UNIT SHUTDOWNS AND POWER REDUCTIONS i

1-Number >

'gg&iWiW9g'

i % Min % %%

- >None% g s agg <

}

+

Date N/A iTppe'(1)i?

M W *nfW ^ % ~

' ' im e* 94 N/At. # W P s

+

4 Duration (Hours) ~

N/A hl2)T e ' ** "PiMF '

1';'

'M~

iN/A9 24 *

' Method of shutting down reactor (3)

N/A LER NOF " l 4M M' 'N

/'N/Ap a?

+

'c>v-

"^

c?'

System Code (4)

N/A ComponentCode(5)l?" '912"

-&m MM - 58 ' ^ !!N/AL #M N '

Cause and corrective action to prevent N/A 1

(1) F-Forced -

l S-Scheduled (2) Reason:

A-Equipment Failure (Eplain)

B-Maintenance or Teet 1

C-RefuAng D4egulatori Restetion E-operator Training & ucense Examination F. Administrative G-Operational Error (Explain)

H-Other (Explain)

(3) Method 1-Manuel 24Aanuel Scram 3-Automatic Scram 4-Contmustion from Previous Month 5-Reduction in the Average Daily Power Level of more

. then 20% from the previous day ELOther (Explain)

(4) IEEE Std 8051984 (5) IEEE Std 803A 1983 1

I~

'o.

  • e USNRC MGNTHLY OPERATING REPORT Docket No:

50-362 l

GAN ONOFRE NUCLEAR GENERATING STATION Unit Name:

SONGS-3 I

UNIT 3 Date:

August 12,1999 July 1999 Completed by: C. E. Williams l

Telephone:

(949) 368-6707 Page 3 of 3

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH l

i F

Date Time Event

07/01/992 0001; Mode 21799;9%ReactorPowerA1164
MWe^1 in i P~*

07/31/99 2400 Mode 1,99.8% Reactor Power,1160 MWe i