NRC Monthly Operating Report, July 1999 San Onofre Nuclear Generating Station, Unit 2 i
I 9908160076 990812 PDR ADOCK 05000361 R
PDR.
\\
p.
USNRC MONTHLY OPERATING REPORT Docket No:
50-361 SAN ONOFRE NUCLEAR GENERATING STATION Unit Name:
SONGS-2 UNIT 2 Date:
August 12,1999 July 1999 Completed by: C. E. Williams Telephone:
(949) 368-6707 Page 1 of 3 OPERATING DATA REPORT ld!/.Desigh Electrical. Rating (Net'MWe)s 310703 2
Maximum Dependable Capacity (Gross MWe) 1127 93!
Maximum ~ Dependable' Capacity: (Not MWe)?
M070;;
This Month
- Yr-to-Date*
Cumulative
- jfj WMN8ursh Psriod
@MI -
[5;os73 j)3s,s4sj!
4 5
Number cf Hours Reactor Was Critical 744 3,832 109,314
{6} NoiiifilGsnsfatMOn-Nrie!!Q 174B
,%7741 do74th 7 (Ur.;t Reserve Shutdown Hours 0
0 0
18f Inst Efectricsi;Edergy.Genersied]
- lio25;i167^
$$14(9293 d1D8$170)
- Rounded
USNRC MONTHLY OPERATING REPORT Docket No:
50-361 i
SAN ONOFRE NUCLEAR GENERATING STATION Unit Name:
SONGS-2 UNIT 2 Date:
August 12,1999 July 1999 Completed by: C. E. Williams Telephone:
(949) 368-6707 Page 2 of 3 l
l 1
UNIT SHUTDOWNS AND POWER REDUCTIONS l
JNoh6 F <
- NQmber
,l >
~'l
',Jeb -
Date N/A iT9peL(1)!!.Sa J,
a
' "?
- A 79 N/A F -
Duration (Hours)
N/A Reason (2)1i as (N/Ai
- s.
Method of shutting down reactor (3)
N/A
~#
- LER Nok
.m m
M FN/M an M System Code (4)
N/A ComponentLCode(5)T 4 SMe s c
WW
. !N/A? N Cause and corrective action to prevent N/A (1) F-Forced S-Scheduled (2) Reason:
A-Equipment Fakure (Explain)
J B-Maintenance or Test C-Refueling -
D-Regulatory Restriction 1
E-Operator Training & License Examination F-Administrative G-Operatienal Error (Explain)
H-Other (Explain)
(3) Method 1-Manual 2-Manual Scram 3-Automate Scram 4-Continuation from Previous Month 5-Reduction in the Average RWry Power Level of more than 20% from the previous day 6-Other (Explain)
(4) (EEE Std 805-1984 (5) IEEE Std 803A-1983
USNRC MONTHLY OPERATING REPORT Docket No:
50-361 SAN ONOFRE NUCLEAR GENERATING STATION Unit Name:
SONGS-2 l
UNIT 2 Date:
August 12,1999 I
July 1999 Completed by: C. E. Williams Telephone:
(949) 368-6707 Page 3 of 3
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH Date Time Event 67/01/994 00011 ModeL11l:99;6% Reador P6wern1124 MWei 07/31/99 2400 Mode 1,99.9% Reactor Power,1164 MWe
'r, L
?
I l
4 1
I 1
I
+.
NRC Monthly Operating Report, July 1999 San Onofre Nuclear Generating Station, Unit 3 I
l j
~
]
3
~.,
USNRC MONTHLY OPERATING REPORT Docket No:
50-362 SAN ONOFRE NUCLEAR GENERATING STATION Unit Name:
SONGS-3 UNIT 3 Date:
August 12,1999 July 1999.
Completed by: C. E. Williams Telephone:
(949) 368-6707 Page 1 of 3 OPERATING DATA REPORT di Design'Els:trical' Rating"(Net MWe)1 *Wi#* * % ^.
W1080jh 2
Maximum Dependable Capacity (Gross MWe) 1127 33B : Maximum Dopendable: Capacity;(Not MWe)W < ; we M m
~
u 41080!it l
This Month
- Yr-to-Date* Cumulative
- i
' ?O NumberMHoursistPeriod' dip sa w 47 2s m3 gads.os7ji.
1134; aces 4
Number of Hours Reactor Was Critical 744 4,048 109,164
?5}i Hours Genefits:On-line N aar e ~
6744b is,sesF 1107/182:1=
6 Unit Reserve Shutdown Hours o
o o
1 474 : Net Electrical Energp Generated (MWh)
!417;40e? -
14348~6481
'%112,010,0003
- Rounded i
l
J e
USNRC MONTHLY OPERATING REPORT Docket No:
50-362 SAN ONOFRE NUCLEAR GENERATING STATION Unit Name:
SONGS-3 UNIT 3 Date:
August 12,1999 l:
July 1999 Completed by: C. E. Williams
)
Telephone:
(949) 368-6707 Page 2 of 3 i
UNIT SHUTDOWNS AND POWER REDUCTIONS i
1-Number >
'gg&iWiW9g'
- i % Min % %%
- >None% g s agg <
}
+
Date N/A iTppe'(1)i?
M W *nfW ^ % ~
' ' im e* 94 N/At. # W P s
+
4 Duration (Hours) ~
N/A hl2)T e ' ** "PiMF '
1';'
'M~
iN/A9 24 *
' Method of shutting down reactor (3)
N/A LER NOF " l 4M M' 'N
/'N/Ap a?
+
'c>v-
"^
c?'
System Code (4)
N/A ComponentCode(5)l?" '912"
-&m MM - 58 ' ^ !!N/AL #M N '
Cause and corrective action to prevent N/A 1
(1) F-Forced -
l S-Scheduled (2) Reason:
A-Equipment Failure (Eplain)
B-Maintenance or Teet 1
C-RefuAng D4egulatori Restetion E-operator Training & ucense Examination F. Administrative G-Operational Error (Explain)
H-Other (Explain)
(3) Method 1-Manuel 24Aanuel Scram 3-Automatic Scram 4-Contmustion from Previous Month 5-Reduction in the Average Daily Power Level of more
. then 20% from the previous day ELOther (Explain)
(4) IEEE Std 8051984 (5) IEEE Std 803A 1983 1
I~
'o.
- e USNRC MGNTHLY OPERATING REPORT Docket No:
50-362 l
GAN ONOFRE NUCLEAR GENERATING STATION Unit Name:
SONGS-3 I
UNIT 3 Date:
August 12,1999 July 1999 Completed by: C. E. Williams l
Telephone:
(949) 368-6707 Page 3 of 3
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH l
i F
Date Time Event
- 07/01/992 0001; Mode 21799;9%ReactorPowerA1164
- MWe^1 in i P~*
07/31/99 2400 Mode 1,99.8% Reactor Power,1160 MWe i