ML20217E338

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Sept 1999 for Songs,Units 2 & 3
ML20217E338
Person / Time
Site: San Onofre  
Issue date: 09/30/1999
From: Williams C
SOUTHERN CALIFORNIA EDISON CO.
To:
Shared Package
ML20217E325 List:
References
NUDOCS 9910190171
Download: ML20217E338 (7)


Text

-

i USNRC MONTHLY OPERATING REPORT Docket No:

50-361 SAN ONOFRE NUCLEAR GENERATING STATION Unit Name:

SONGS-2 UNIT 2 Date:

October 13,1999 September 1999 Completed by: C. E. Williams Telephone:

(949) 368-6707 Page 1 of 3 OPERATING DATA REPORT lir Design' Electrical'Rsting (Not MWe))

  • 11070/

2 Maximum Dependable Capacity (Gross MWe) 1127 s3X Maximum Dependsble Capacitf(Not MWe)!

e

< s1070 :

This Month

  • Yr-to-Date* Cumulative
  • 1

@) y@6sr?6(_HaursidPsi6d2, Kd

'$7203m

[5 551]

MMj31%

5 Number of Hours Reactor Was Critical 720 5,296 110,778 l[5338]i -

1Nooj7sf'

{6] LH60rs!Gensriter[Oinlinef%

f,

s720)

+

7 Unit Reserve Shutdown Hours o

o o

(8k Net E3ctrEal Enerby,Generstsdi !?'

E802:2323 5777,61oj 4115 410,852!

1

  • Rounded i

9910190171 991013 PDR ADOCK 05000361 PDR R.

2 USNRC MONTHLY OPERATING REPORT Docket No:

50-361 SAN ONOFRE NUCLEAR GENERATING STATION Unit Name:

SONGS-2 UNIT 2 Date:

October 13,1999 September 1999 Completed by: C. E. Williams Telephone:

(949) 368-6707 Page 2 of 3 UNIT SHUTDOWNS AND POWER REDUCTIONS i

Number -:

' nW vi:iig, < < %$$ n % mM

None Ps '

Date N/A iType'(1)?% ~ WE Y" as m ~ as ?

_ dN/A?

Deration (Hours)

N/A Reason ~(2)?

me J 0^

v (N/As w

Method of shutting down reactor (3)

N/A l

1ER NoE, et 1

'e

- G'-e

  • We

' M iN/Ai "

~.

i 4

System Code (4)

.N/A Component Code (5)i is =drM

^' s' '

J

!N/Ali Cause and corrective action to prevent N/A (1) F-Forced l

S-Scheduled l

(2) Ressort A-Equipment Failure (Explain)

B-Maintenance or Test C-Refuehng.

D-Regulatory Restriction E-Operator Training & Licanoe Examination F-Administrative

[

G-Operational Error (Explain) l H-Other (Expisin)

(3) Method:

1-Manuel 2-Manual Scram 3 Automatic Scram 4-Continuation from Previous Month i

l 5-Reduction in the Average Daily Power Level -

of more than 20% from the previous day 6-Other (Explain) 1 (4) IEEE Std 805-1984 (5) IEEE Std 803A-1983 1

l l

A USNRC MONTHLY OPERATING REPORT Docket No:

50-361 SAN ONOFRE NUCLEAR GENERATING STATION Unit Name:

SONGS-2 UNIT 2 Date:

October 13,1999 September 1999 Completed by: C. E. Williams Telephone:

(949) 368-6707 Page 3 of 3

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH Date Timo Event

- 9/01/995

'00012-Mode"1799.89%' Reactor PowerM167;MWe;t 0

+

09/30/99 2400 Mode 1,99.83% Reactor Power,1173 MWe l

I;I

\\

l NRC Monthly Operating Report, September 1999 San Onofre Nuclear Generating Station, Unit 3 I

i

.f-

USNRC MONTHLY OPERATING REPORT Docket No:

50-362 SAN ONOFRE NUCLEAR GENERATING STATION Unit Name:

SONGS-3 UNIT 3 Date:

October 13,1999 September 1999 Completed by: C. E. Williams Telephone:

(949) 368-6707 Page 1 of 3 OPERATING DATA REPORT n1(

Design Electrical Rating (Net MWe)!

110801 2

Maximum Dependable Capacity (Gross MWe) 1127 li:30 Maximum' Dependable Capacity;(Not MWe)!

?10801 This Month

  • Yr-to-Date* Cumulative
  • N0mber of Hours in Period 5 17200 f 6,5511,

$135,8639 4

Number of Hours Reactor Was Critical 720 5,512 110,e28 15i ; Hours Generator _On-lines 17203 s ;i:5,4.so):

510s,648; 6

Unit Reserve Shutdown Hours o

o o

17e : Net Electrical Energy Generate'd'(MWh):

2795,5254 1:5,967,0122 1:113,629,0641

  • Rounded 1

I i

i i

a USNRC MONTHLY OPERATING REPORT Docket No:

50-362 SAN ONOFRE NUCLEAR GENERATING STATION Unit Name:

SONGS-3 UNIT 3 Date:

October 13,1999 September 1999 Completed by: C. E. Williams Telephone:

(949) 368-6707 Page 2 of 3 UNIT SHUTDOWNS AND POWER REDUCTIONS te (Nonel

.Numbern '

~

Date N/A iType'(1)3 '

sN/Ai Duration (Hours)

N/A Reason ^(2)P hN/A9 4

Method of shutting down reactor (3)

N/A LER NO

?N/A1 System Code (4)

N/A l

Com'pon' nt' Code (5);

tN/At e

Cause and corrective action to prevent N/A (1) F-Forced S-Scheduled (2) Reason:

A-Equipment Failure (Explain)

B-Maintenance er Test C-Refueling D-Regulatory Restriction E-Operator Trairing & License Examination F. Administrative G-Operational Error (Explain)

H-Other (Explain)

(3) Method:

1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation from Previous Month 5 Reduction in the Average Daily Power Level of more than 20% from the previous day 6-Other (Explain)

(4) lEEE Std 8051984 (5) IEEE Std 803A 1983 L

t USNRC MONTHLY OPERATING REPORT Docket No:

50-362 SAN ONGFRE NUCLEAR GENERATING STATION Unit Name:

SONGS-3 UNIT 3 Date:

October 13,1999 September 1999 Completed by: C. E. Williams Telephone:

(949) 368-6707 Page 3 of 3

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH Date Time Event

'09/01/99!

00015 Mode;1}99,91% Reactor'Powerd1153 MWelj 09/30/99 2400 Mode 1,99.90% Reactor Power,1161 MWe 4

I d.

--