ML20199F077

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Dec 1998 for Songs,Units 2 & 3
ML20199F077
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 12/31/1998
From: Williams C
SOUTHERN CALIFORNIA EDISON CO.
To:
Shared Package
ML20199F066 List:
References
NUDOCS 9901210187
Download: ML20199F077 (8)


Text

.. -...

~

NRC Monthly Operating Report, December 1998 San Onofre Nuclear Generating Station, Unit 2 9901210187 990115 5

PDR ADOCK 05000361dJ R

PDR b

USNRC MONTHLY OPERATING REPORT Docket No:

50-361 SAN ONOFRE NUCLEAR GENERATING STATION Unit Name;.

SONGS-2 UNIT 2 Date:

January 15,1999 December 1998 -

Completed by: C. E. Williams Telephone:

(949) 368-6707 Page 1 of 3 OPERATING DATA REPORT 11s Design Electncel Rating ^(Not MWe))

  • l1070s '

2 Maximum Dependable Capacity (Gross MWe) 1127 s39 Maximum Dependable Capacity (Not MWe))

~

s1070?

This Month

  • Yr-to-Date*

Cumulative

  • E4s N. umber?of HoursWP.eriod ca

. ~ 97. 4. 4!

X8.,7. 6. 6li ji34l761) 5 Number of Hours Reactor Was Critical 744 7,811 105,481 (61i Hours Generator On-line S744l!

27,7921f

< (103;,83M 7

Unit Reserve Shutdown Hours 0.0 0.0 0.0

{8j Net' Electrical Enerdy;;Generstid'(MWh)!

$794356

[8330,2121 1109,633,242i)

  • Rounded

USNRC MONTHLY OPERATING REPORT Docket No:

50-361 SAN ONOFRE NUCLEAR GENERATING STATION Unit Name:

SONGS-2 UNIT 2 Date:

January 15,1999 December 1998 Completed by: C. E. Williams Telephone:

(949) 368-6707 Page 2 of 3 UNIT SHUTDOWNS AND POWER REDUCTIONS Number 1

~

s 1107901 ~

Date 12/16/98 Type'(1)3 (Si

+

Duration (Hours)

N/A Reason'(2)#

ai

?Cs Method of shutting down reactor (3)

N/A LER No2 san JP '

iN/Ai

^

System Code (4)

N/A Component Code'(5)3 LN/At Cause and corrective action to prevent recurrence N/A (1) F-Forcrd S-Scheduled (2) Reason:

A-Equipment Failure (Explain)

B-Meintenance or Test C-Refuehng D-Regulatory Restriction E-Operator Training & l.icense Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain)

(3) Method 1-Manuel 2-Manual Scram 3-Automatic Scrum 4-Continuation from Previous Month 5-Reduction in the Average Deity Power Level of more than 20% from the previous day 6-other (Explain)

(4) lEEE Std 805-1984 (5) IEEE Std 803A-1983 l

~

USNRC MONTHLY OPERATING REPORT Docket No:

50-361 SAN ONOFRE NUCLEAR GENERATING STATION Unit Name:

SONGS-2 UNIT 2 Date:

January 15,1999 December 1998 Completed by: C. E. Williams Telephone:

(949) 368-6707 Page 3 of 3

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH Date Time Event

12/01/98i 0001?

Mode'.:1l 99.9% Reactor Powere1162.MWel541.0 EFPD4 12/16/98 0718 Started reactor power coast down for re-fueling.

12/31/98;!

2400i Mode.1/86.3% Reactor Power,994 MWel571.3 EFPD::

~

l

\\

f l

i NRC Monthly Operating Report, December 1998 l

San Onofre Nuclear Generating Station, Unit 3 l

i i

('

USNRC MONTHLY OPERATING REPORT Docket No:

50-362 SAN ONOFRE NUCLEAR GENERATING STATION Unit Name:

SONGS-3 UNIT 3 Date:

January 15,1999 December 1998 Completed by: C. E. Williams Telephone:

(949) 368-6707 Page 1 of 3 OPERATING DATA REPORT iij

! Design Electrical Rating'(Net MWe)lj

!;:10801 2

Maximum Dependable Capacity (Gross MWe) 1127 333 Maximum Dependable Capacity (Not MWe)?

?1080S This Month

  • Yr-to-Date* Cumulative *

(;4!

. Number of Hours in Panod L744s i;8,760:l f129,3121 4

Number of Hours Reactor Was Critical 744 8,314 105,115

-(Si Hours. Generator On'line:

1744i:

18.304; 1103;196':-

6 Unit Reserve Shutdown Hours 0

0 0

-:70 Net Electrical Energy Generated (MWh)-

827,698-J 9,058,598 i L107.662,052 '

~

  • Rourolad

USNRC MONTHLY OPERATING REPORT Docket No:

50-362 SAN ONOFRE NUCLEAR GENERATING STATION Unit Name:

SONGS-3 UNIT 3 Date:

January 15,1999 December 1998 Completed by: C. E. Williams Telephone:

(949) 368-6707 Page 2 of 3 UNIT SHUTDOWNS AND POWER REDUCTIONS

-Number <:::

Tu None'lii ;g Date N/A LType (1)9

':N/A?

Duration (Hours)

N/A

. Reason (2)t:;

1N/A?

Method of shutting down reactor (3)

N/A LER Not SN/AD System Code (4)

N/A Component Code (5)l N/AL Cause and corrective action to prevent recurrence N/A (1) F-Forced S-Schedeled (2) Reason:

A-Equipment FaAir Explain)

B-Maintenance or Te,t C-Refueling D-Regulatory Restnetun c-Operator Training & bcease Examination F-Administrative G-Operational Error (Explain)

H-other (Explain)

(3) Method:

1-Manual 2-Manual Scram 3-Automatic Scram 4-Contmustion from Previous Month 5-Reduction in the Average Daily Power Level of more than 20% from the previous day 6-Other (Explain)

(4) IEEE Std 805-1984 (5) IEEE Std 803A-1983

1 l

}

USNRC MONTHLY OPERATING REPORT Docket No:

50-362 SAN ONOFRE NUCLEAR GENERATING STATION Unit Name:

SONGS-3 UNIT 3 Date:

January 15,1999 i

December 1998 Completed by: C. E. Williams Telephone:

(949) 368-6707 i

Page 3 of 3 1

i

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH Date Time Event

12/0.1/98n
000.1ll Modem 99,9% Reactor Power $1.161 MWet472.'8 EFPD3 i

12/31/98 2400 Mode 1,99.9% Reactor Power,1162 Mwe,504.0 EFPD.

,