Special Rept Re Condenser Evacuation Sys Noble Gas Monitor Inoperable for Longer than 72 H During Modes 1,2,3 & 4. Preventive & Corrective Maint Being Performed on Monitor. Monitor Will Be Returned to Svc by 910614
ML20081G147
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 06/03/1991
From: Rosenblum R
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9106120259
Download: ML20081G147 (2)


Text

. __

f  %.

1 .

F Southom Cadfomia Edison Company

.0 un u n smn i li tv1NF , C AL 1, Ot tnt A (*J 710 l i s t N 6'. ,Nr.

I4 fl f 40SE NDL t #M a,s ANAny it cf

} p }3 }ggj (FidpAS4 ASun Na ICL t AR Hl. i 414 A1C*HY Af f Aph3 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D. C. 20555 Gentlemen:

Subject:

Docket No. 50-362 Special Report San Onofre Nuclear Generating Station, Unit 3 Technical Specification (TS) Section 3.3.3.1 to Facility License NPF-15 for San Onofre Nuclear Generating Station, Unit 3, requires Southern California Edison (SCE) to provide a Special Report when the Condenser Evacuation System Noble Gas Monitor becomes inoperable for longer than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> during Modes 1,2,3, and 4. This letter provides the Special Report required by TS 3.3.3.1.

On May 21,1991, with Unit 3 in Mode 3 for the main generator hydrogen leak repair outage, Condenser Evacuation System Wide Range Noble Gas Monitor 3RY-7870 was removed from service for the 18-month channel calibration surveillance required by TS 4.3.3.1, Table 4.3-3. The preplanned alternate method of monitoring the appropriate parameter was implemented as required by the TS.

This 18-month surveillance test for 3RY-7870 includes completing TS calibration requirements for all loap components associated with the monitor, electronic and isotopic calibrations of the detectors, and performing the channel functional test. In addition, we are performing preventive and corrective maintenance work on the monitor. We expect to return 3RY-7870 to service by June 14, 1991.

O 9106120:59 910603 PDR ADOCK 05000362 d g PDR -

k ;' o

r a

~ .

Document Control Desk 2 June 3, 1991 If you require any additional information on this subject, please let me know.

Very truly yours, M 4 cc: J. B. Martin, Regional Administrator, NRC Region V C. W. Caldwell NRC Senior Resident Inspector, San Onofre Units 1,2, and 3 l