NRC Monthly Operating Report, September 1998 i

San Onofre Nuclear Generating Station, Unit 2 4

A L

9810210036 981015 PDR ADCCK 05000361 <-

R PDR

USNRC MONTHLY OPERATING REPORT Docket No:

50-361

' SAN ONOFRE NUCLEAR GENERATING STATION Unit Name:

SONGS-2 UNIT 2 Date:

October 15,1998 September 1998 Completed by: C. E. Williams Telephone:

(949) 368-6707 Page 1 of 3 OPERATING DATA REPORT l

flH Design Elestrical' Rating(Nst.MWe)s W

ns

$1070),

2 Maximum Dependable Capacity (Gross MWe) 1127 CSE Mammum Dependable Capacity (Not MWe)1 A1070X

^~

This Month

  • Yr-to-Date*

Cumulative *

@y hd W %fh N sinheriod 9

jf207 if55$,

' M3(552s 5

Number of Hours Reactor Was Critical 468 5,602 103,272

![6j ho6sfienersi&QSiinej"*,

I456?2M 4%(683) 30jj28$

7 Unit Reserve Shutdown Hours 0.0 00 0.0

![83 Ne[ElsstricalEnergylGsnestad(MWQI.

$482?#$

E6;01(56@ M07i222;5933

  • Rounded

l USNRC MONTHLY OPERATING REPORT Docket No:

50-361

  • SAN ONOFRE NUCLEAR GENERATING STATION Unit Name:

SONGS-2 UNIT 2 Date:

October 15,1998 September 1998 Completed by: C. E. Williams Telephone:

(949) 368-6707 Page 2 of 3 UNIT SHUTDOWNS AND POWER REDUCTIONS

.Numbsr3 m

d us 6106!

Date 980918 JType (1)1 iFj w

Duration (Hours) 264 Reason (2) ?

' 4*

RA)

Method of shutting down reactor (3) 1 LERNM L

?N/AT System Code (4)

AB LComponent Code:(5)?

sSGi 4

s

'P Cause and corrective action to prevent recurrence o ua (1) F-Forced S Scheduled (2) Reason:

A Equipment Failure (Explain)

B-Maintenance or Test C-Refuelin0 D-Regulatory Restriction E-Operator Training & License Examination F. Administrative G-operational Error (Explain)

H-Other (Explain)

(3) Method:

1-Manual 2-Manual Scram 3-Automatic Scram 4 continuation from Previous Month 5-Reduction in the Average Daih Power Level of more than 20% from the previous day 6-Other (Explain)

(4) lEEE Std 805-1984 (5) lEEE std 803A 1983

l USNRC MONTHLY OPERATING REPORT Docket No:

50-361

' SAN ONOFRE NUCLEAR GENERATING STATION Unit Name:

SONGS-2 UNIT 2 Date:

October 15,1998 September 1998 Completed by: C. E. Williams Telephone:

(949) 368-6707 l

Page 3 of 3 l

l

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH l

Date Time Event 9/01/98:s

-00011 iMedel1f 99.6%; Reactor PowerA1159,MWe7(4611EEPDh 1006 Unit received RT7870 30 GPD leakage alarm.

9/18/983l

)10301 (CRS directed plant shstdown.

4' 1115 Unit manually tripped at 35% reactor power per procedure.

W c1538f : Unit entered ModeW ssi.

9/19/98 1100 Unit entered Mode 5.

?9/26/98 51539j ; Unit entered Mode"4}

?

"?

,s 9/27/98 2148 Unit entered Mode 3.

2250j Alnit entered Mode 2h m

9/30/98 0645 Unit heat treat completed at 85% reactor power, 24002 Mode;1p 99.6% Reactor PowetA1155.'MWeM80l4 EEPD s 4

l i

i

e i

NRC Monthly Operating Report, September 1998 San Onofre Nuclear Generating Station, Unit 3 i

l l

i

[

l l

USNRC MONTHLY OPERATING REPORT Docket No:

50-362

  • SAN ONOFRE NUCLEAR GENERATING STATION Unit Name:

SONGS-3 UNIT 3 Date:

October 15,1998 September 1998 Completed by: C. E. Williams Telephone:

(949) 368-6707 Page 1 of 3 OPERATING DATA REPORT

$1;f Design Electrical Rating'(Net MWe);

>s M

l 11080) 2 Maximum Dependable Capacity (Gross MWe) 1127 i!37 Maximum Dependable' Capacity ^(Net MWe))

110803 This Month

  • Yr-to-Date* Cumulative *

!;4:n

Number of Hours in Periodi

?720!!

16,551s M127;103i 4

Number of Hours Reactor Was Critical 720 6,105 102,906 151 Hours Gen 4ratotOn-linel-i720s.

l8:005)

A M00,9874 6

Unit Reserve Shutdown Hours 0

0 0

i75

Net Electrical Ener0y Generated (MWh)

(794;73E 16,608;4745 4105,211,9281

  • Rounded i

l l

1 USNRC MONTHLY OPERATING REPORT Docket No:

50-362

' SAN ONOFRE NUCLEAR GENERATING STATION Unit Name:

SONGS-3 UNIT 3 Date:

October 15,1998 September 1998 Completed by: C. E. Williams Telephone:

(949) 368-6707

)

Page 2 of 3 l

i UNIT SHUTDOWNS AND POWER REDUCTIONS Numberb

^

f::Nonel s

Date N/A 4;pe(1)!

'IN/A3 Duration (Hours)

N/A l Reason (2)? *

^

LN/Ai Method of shutting down reactor (3)

N/A LER No?

~

iN/A1 System Code (4)

N/A Component Code'(5)::1

!N/AK' s

Cause and corrective action to prevent recurrence N/A (t) F-Forced S. Scheduled (2) Reason:

A-Equipment Fadure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-operator Trairing & Ucense Examination F-Administrative G-operational Error (Explain)

H-other (Explain)

(3) Method 1 Manual 2-Manual Scram 3 Automatic Scram 4-Continuation from Previous Month

5. Reduction in the Average Daily Power Level of more than 20% from the ptsvious day 6-other (Explain)

(4) IEEE Std 8051984 (5) lEEE Std 803A 1983 I

l

.?

l l

l USNRC MONTHLY OPERATING REPORT Docket No:

50-362

)

  • SAN ONOFRE NUCLEAR GENERATING STATION Unit Name:

SONGS-3 i

l UNIT 3 Date:

October 15,1998 September 1998 Completed by: C. E. Williams Telephone:

(949) 368-6707 Page 3 of 3 l

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH I

Date Time Event

9/01/989 b
00011 Modeittl99.8W Reactor Posr31158 MWe?!3824 EFPDh > "

9/05/98 1930 Unit commenced heat treat.

L2256ii

Unit c6mpleted heat trait at 80% reactor powers 9/03/98 0159 Unit commenced power increase to 100% power.

08101

Unit retumed to fullloadn1155.Mwel, < >

enMe s

x-9/30/98 2400 Mode 1,99.9% reactor power,1155 Mwe,412.4 EFPD.