USNRC MONTHLY OPERATING REPORT Docket No:

50-361 SAN, ONOF,RE NUCLEAR GENERATING STATION Unit Name:

SONGS-2 UNIT 2 Date:

September 15,1998 August 1998 Completed by: C. E. Williams Telephone:

(949) 368-6707 Page 1 of 3 OPERATING DATA REPORT i

011j Desigii Electrical. Rating ^(Not MWe)?

C1070!

2 Maximum Dependable Capacity (Gross MWe) 1127 9 31 Makimum Dependable' Capacity (Not MWe)1 < M m

8 070?:

This Month

  • Yr-to-Date*

Cumulative *

$N) hkbfM005hMAfiCd

^

jkYN[

'{$831]!

33%5N

. ga 5

Number of Hours Reactor Was Critical 744 5,134 102,804 16)

Hours GenersI&Oslin!

$f443 m..

153. 28) ~

$1. 0f!17$

7 Unit Reserve Shutdown Hours 0.0 0.0 0.0 if8f:!

N4f ElectncsI EnergiGirsisted(MWh))

[si.6l894]i!

!j5l53MDb 506;740l13h

  • Rounded 9809220188 980915 PDP ADOCli 05000361 R

PDR

i i

\\

1 USNRC MONTHLY OPERATING REPORT Docket No:

59-361 SAN ONOFRE NUCLEAR GENERATING STATION Unit Name:

SONGS-2 UNIT 2 Date:

September 15,1998 August 1998 Completed by: C. E. Williams Telephcne:

(940) 368-6707 Page 2 of ?

UNIT SHUTDOWNS AND POWER REDUCTIONS kNumbed <

W lNone) m w

Date N/A Type(1)]

LN/Alf Duration (Hours)

N/A

..Reascn (2)s EN/A1 x

Method of shutting down reactor (3)

N/A

..LER Not ns

  1. s 1N/A)

System Code (4)

N/A ComponentCode~(5)?3 M jN/A9 Cause and corrective action to prevent recurrence N/A (1) F-Forced S-Scheduled (2) Reason:

A-Equipment Failure (Expain) l B-Mainter,ance or Test c-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Expiar)

H-Other (Explain)

(3) Method 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation from Previous Month 5-Reduction in the Aterage Daily Power Level of more ihan 20% from the previous dcy 6-Other (Explain)

(4) IEEE Std 8051981 (5) IEEE Std 803A-1983

1 USNRC MONTHLY OPERATING REPORT Docket No:

50-361 SAN ONOFRE NUCLEAR GENERATING STATION Unit Name:

SONGS-2 UNIT 2 Date:

September 15,1998 August 1998 Completed by: C. E. Williams Telephone:

(949) 368-6707 Page 3 of 3 1

4

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH Date Time Event i

(8/1/98i

00016 Model1[99;9% Reactor P6wer!!1152lMWel430.9 EEPDJ Unit commenced reactor down power to 80% power to perform 8/30/98 0830 circulating water system heat 1reat.

dO303 Unit reached'80% reactoryowed880 MWeli i

1730 Unit commenced power ramp to 100% reactor power.

2?iOJ U6it'aidOO%ireactor powerK1150~ MWe?

>&#I~

ap s

j 8/31/98 2400 Mode 1,99.6% Reactor Power,1159 MWe,461.7 EFPD 4

l

l I

NRC Monthly Operating Report, August 1998 i

San Onofre Nuclear Generating Station, Unit 3

USNRC MONTHLY OPERATING REPORT Docket No:

50-362 SAN, ONOFRE NUCLEAR GENERATING STATION Unit Name:

SONGS-3 1

UNIT 3 Date:

September 15,1998 August 1998 Completed by: C. E. Williams Telephone:

(949) 368-6707 Page 1 of 3 OPERATING DATA REPORT f

!.it Design Electrical Rating (Net MWe))

m

$1080?

2 Maximum Dependable Capacity (Gross MWe) 1127

  1. 3s Maxirh0m' Dependable CapacityL(Not MWe)s 110803 This Month
  • Yr-to-Date* Cumulative
  • IM
t
  • Umber:of' Hours in Period M

$7441 (5;831s x 1126;3835 4

4 Number of Hours Reactor Was Critical 744 5,385 102,186 s51 Houps;. Generator.Omlinel 744)l 25,375%

d100,267J 6

Unit Reserve Shutdown Hours 0

0 0

776 c Net Electrical Energy Generat'ed (MWh)-

E822,8782 s5,813,736$

(104l417,191!

j 1

t t

  • Rounded i

1 2

4 5

USNRC MONTHLY OPERATING REPORT Docket No:

50-362 SAN, ONOFRE NUCLEAR GENERATING STATION Unit Name:

SONGS-3 UNIT 3 Date:

September 15,1998 August 1998 Completed by: C. E. Williams Telephone:

(949) 368-6707 Page 2 of 3 UNIT SHUTDOWNS AND POWER REDUCTIONS LNumber:t i;None? -

Date N/A Type (1_)s

^

<:LN/A$

Duration (Hours)

N/A Reason (2)s

- 9N/A3 Method of shutting down reactor (3)

N/A

.LER:No7 M

tN/At System Code (4)

N/A Component Code (5);;i fN/A1 Cause and corrective action to prevent recurrence N/A (1) F Forced S-Scheduled (2) Reason:

A-Equipment Failure (Explain)

B-Maintenance er Test i

C-Refueling D-Regulatory Restricton i

E-operator Training & Ucense Examination F-Administrative G-operational Error (Explain)

H-other (Explain) 1 l

(3) Method 1 Manual 2-Manual Scram 3-Automatic Scram 4-Continuation from Previous Month 5-Reduction in the Average Daily Power Level of more than 20% from the previous day 6-Other (Explain)

(4) IEEE Std 805-1984 (5) IEEE Std 803A-1983

USNRC MONTHLY OPERATING REPORT Docket No:

50-362 SAN, ONOFRE NUCLEAR GENERATING STATION Unit Name:

SONGS-3 UNIT 3 Date:

September 15,1998 August 1998 Completed by: C. E. Williams Telephone:

(949) 368-6707 Page 3 of 3 f

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH Date Time Event i8/1/985

000N Mode (if99,9%lReactof Per$1141 MWe}35 A6 EFPD?

8/31/98 2400 Mode 1,99.8% Reactor Power,1158 MWe,382.5 EFPD