ML20198C347
| ML20198C347 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 11/30/1998 |
| From: | Williams C SOUTHERN CALIFORNIA EDISON CO. |
| To: | |
| Shared Package | |
| ML20198C340 | List: |
| References | |
| NUDOCS 9812220048 | |
| Download: ML20198C347 (8) | |
Text
-. - - -..
i I
NRC Monthly Operating Report, November 1998 San Onofre Nuclear Generating Station, Unit 2 9812220048 981214 f PDR ADOCK 05000361 PDR i.
R
t l
USNRC MONTHLY OPERATING REPORT Docket No:
50-361
. SAN ONOFRE NUCLEAR GENERATING STATION Unit Name:
SONGS-2 UNIT 2 Date:
December 14,1998 November 1998 Completed by: C. E. Williams Telephone:
(949) 368-6707 Page 1 of 3 OPERATING DATA REPORT lilj iDesign Electrical Rating'(Net MWe);
31070j 2
Maximum Dependable Copacity (Gross MWe) 1127 13)
'Msimum De'pendable Capacity (Net MWe))
00701 This Month
- Yr-to-Date*
Cumulative *
{[
-N0r$6sE6f.;Hbuis iri? sri 6df p720!
[8,0}63~
d34,01%j
~
5 Number of Hours Reactor Was Critical 720 7,067 104,737
[6i N6iiriGenerstBfOMilnej; N201 l7,045i
$103,093) 7 Unit Reserve Shutdown Hours 0.0 0.0 0.0
!l8j Nst Elestribal Rheidy Geherated (MWh)i
- s795,7.051 Wg35;860;y (1C8,838,889..
l l
- Rounded i
USNRC MONTHLY OPERATING REPORT Docket No:
50-361 SAN ONOFRE NUCLEAR GENERATING STATION Unit Name:
SONGS-2 UNIT 2 Date:
December 14,1998 November 1998 Completed by: C. E. Williams Telephone:
(949) 368-6707 Page 2 of 3 UNIT SHUTDOWNS AND POWER REDUCTIONS Number;
[None?
Date N/A stype'(1)s
!N/Ai Duration (Hours)
N/A Reason;'(2)i
?N/Ai, Method of shutting down reactor (3)
N/A
- LER No?
?N/A1 1
System Code (4)
N/A
- Component Code ~ (5)?
lN/A?
Cause and corrective action to prevent recurrence N/A (1) F-Forced S-Scheduled (2) Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C Refueling i
D-Regulatory Restriction E-operator Trairing & License Examination F. Administrative G-operational Error (Explain)
H-Other (Explain)
(3) Method:
1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation from Previous Month 5-Reduction in the Average Daily Power Le" of more than 20% from the previous da 6-Other (Explain)
(4) IEEE Std 805-1984 (5) IEEE Std 803A-1983
_ _. =
l 1
USNRC MONTHLY OPERATING REPORT Docket No:
50-361
. SAN ONOFRE NUCLEAR GENERATING STATION Unit Name:
SONGS-2 UNIT 2 Date:
December 14,1998 November 1998 Completed by: C. E. Williams Telephone:
(949) 368-6707 Page 3 of 3
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH Date Time Event (11/01/98?
0001?
Modem 99.9% Reactor Powern1157 MWek511 A EFPDs 11/21/98 0930 Unit commenced heat treat.
- 1356j ; Unit completed heat treat at'90% reactor power!
1745 Unit retumed to fullload,1137 Mwe.
(11/30/982
.24006 : Mode 11299,9% Reactor Power;i1161:MWe7541 EFPD$
4
- 1
).
l i
l 1
i i
1 l
?
\\
i i
i l
j
\\
i i
t-i i
i i
i 4
i NRC Monthly Operating Report, November 1998 San Onofre Nuclear Generating Station, Unit 3 f
l i
i l
i i
4 I
l 1
)
1
)
i i
l 1
l 1
1 I
USNRC MONTHLY OPERATING REPORT Docket No:
50-362
. SAN CNOFRE NUCLEAR GENERATING STATION Unit Name:
SONGS-3 UNIT 3 Date:
December 14,1998 November 1998 Completed by: C. E. Williams Telephone:
(949) 368-6707 Page 1 of 3 1
OPERATING DATA REPORT siv iDe'aign' Electrical Rating (Net MWe)P2 M
h1080.9 2
Maximum Dependable Capacity (Gross MWe) 1127 R$1 l Maximum Dependable Capacity:(Net'MWe)!
s10801 This Month
- Yr to-Date* Cumulative
- E4:)
!Numbsrlof Hours in Period
$720s 18,016j 4128,6681) 4 Nu..oer of Hours Reactor Was Critica; 720 7,570 104,371 l
l h61i Hours; Generator.On lins!
??20) ' A s7,560.it
@102,452s
^
4 6
Unit Reserve Shutdown Hours 0
0 0
s7s
! Net Electrical Energy. Generated (MWh)
?800A74s 28,230,9003 4106'834,3541 l
- Rounded i-i b
2 i
1 i
j 4
_ ~. - -
USNRC MONTHLY OPERATING REPORT Docket No:
50-362 SAN ONOFRE NUCLEAR GENERATING STATION Unit Name:
SONGS-3 i
UNIT 3 Date:
December 14,1998 November 1998 Completed by: C. E. Williams Telephone:
(949) 368-6707 Page 2 of 3 UNIT SHUTDOWNS AND POWER REDUCTIONS
' Numbed W
iLNone Date N/A iType (1)1 LN/Af Duration (Hours)
N/A
' Reason ~(2)?
B:N/Alf 4
Method of shutting down reactor (3)
N/A LER Nos GN/Ai System Code (4)
N/A Component Co'de (5))
fN/Ai Cause and corrective action to prevent recurrence N/A (1) F Forced S Scheduled (2) Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E operator Trairing & Ucense Examination F Administrative G operatonal Error (Explain)
H-other (Explain)
(3) Method:
1 Manual 2 Manual Screm 3-Automatic Scram 4 Continuation from Previous Month 5-Reduction in the Average Daily Power Level of more than 20% from the previous day 6-Other (Explain)
(4) IEEE Std 8051984 (5) IEEE Std 803A-1983
USNRC MONTHLY OPERATING CEPORT Docket No:
50-362 SAN ONOFRE NUCLEAR GENERATING STATION Unit Name:
SONGS-3 UNIT 3 Date:
December 14,1998 November 1998 Completed by: C. E. Williams Telephone:
(949) 368-6707
)
Page 3 of 3
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH Date Time Event 111/01/981
- 0001s Model;;1299.9%.Reactof PoWenu156.M.WeM433;EEPDb j
11/30/98 2400 Mode 1,99.9% Reactor Power,1161 Mwe,472.8 EFPD.
i