ML20198C347

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Nov 1998 for Songs,Units 2 & 3
ML20198C347
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 11/30/1998
From: Williams C
SOUTHERN CALIFORNIA EDISON CO.
To:
Shared Package
ML20198C340 List:
References
NUDOCS 9812220048
Download: ML20198C347 (8)


Text

- . - - - . . _ , .

. i I

l 1

Enclosure 1 NRC Monthly Operating Report, November 1998 San Onofre Nuclear Generating Station, Unit 2 l

l 9812220048 981214 f PDR ADOCK 05000361 PDR i.

R

t l l

l USNRC MONTHLY OPERATING REPORT Docket No: 50-361

. SAN ONOFRE NUCLEAR GENERATING STATION Unit Name: SONGS-2 UNIT 2 Date: December 14,1998 November 1998 Completed by: C. E. Williams Telephone: (949) 368-6707 Page 1 of 3 l

l OPERATING DATA REPORT lilj iDesign Electrical Rating'(Net MWe); 31070j 2 Maximum Dependable Copacity (Gross MWe) 1127

13) 'Msimum De'pendable Capacity (Net MWe)) 00701 1

This Month

  • Yr-to-Date* Cumulative
  • l

~

{[ -N0r$6sE6f.;Hbuis iri? sri 6df , p720! [8,0}63~ d34,01%j 5 Number of Hours Reactor Was Critical 720 7,067 104,737

[6i N6iiriGenerstBfOMilnej; N201 l7,045i $103,093) 7 Unit Reserve Shutdown Hours 0.0 0.0 0.0

!l8j Nst Elestribal Rheidy Geherated (MWh)i ;s795,7.051 Wg35;860;y (1C8,838,889. .

l l

  • Rounded i

USNRC MONTHLY OPERATING REPORT Docket No: 50-361 SAN ONOFRE NUCLEAR GENERATING STATION Unit Name: SONGS-2 UNIT 2 Date: December 14,1998 November 1998 Completed by: C. E. Williams Telephone: (949) 368-6707 Page 2 of 3 UNIT SHUTDOWNS AND POWER REDUCTIONS Number; ,

[None?

Date N/A stype'(1)s !N/Ai l Duration (Hours) N/A Reason;'(2)i > -

?N/Ai, l Method of shutting down reactor (3) N/A

LER No? ?N/A1 <

1 System Code (4) N/A

Component Code ~ (5)? lN/A?

l Cause and corrective action to prevent recurrence N/A (1) F-Forced S-Scheduled (2) Reason: A-Equipment Failure (Explain)

B-Maintenance or Test C Refueling i D-Regulatory Restriction E-operator Trairing & License Examination F. Administrative G-operational Error (Explain)

H-Other (Explain)

(3) Method: 1-Manual 2-Manual Scram 3-Automatic Scram 4-Continuation from Previous Month 5-Reduction in the Average Daily Power Le" of more than 20% from the previous da 6-Other (Explain)

(4) IEEE Std 805-1984 (5) IEEE Std 803A-1983

- _ _ . = .- - - - _ . . _ _ _ . _ _. .

l l

l 1

USNRC MONTHLY OPERATING REPORT Docket No: 50-361

. SAN ONOFRE NUCLEAR GENERATING STATION Unit Name: SONGS-2 UNIT 2 Date: December 14,1998 November 1998 Completed by: C. E. Williams Telephone: (949) 368-6707 Page 3 of 3

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH Date Time Event (11/01/98? 0001? Modem 99.9% Reactor Powern1157 MWek511 A EFPDs 11/21/98 0930 Unit commenced heat treat.

1356j ; Unit completed heat treat at'90% reactor power!

1745 Unit retumed to fullload,1137 Mwe.

(11/30/982 .24006 : Mode 11299,9% Reactor Power;i1161:MWe7541 EFPD$

l l

4

1

).

l i l 1 i i  !

1

? l

\

i i

i l

! j i

i \

t-  !

i i i

i  !

i 4

Enclosure 2 i

, NRC Monthly Operating Report, November 1998 San Onofre Nuclear Generating Station, Unit 3 f l

i i l

! i i  !

4 I l

1 l

)

1 1

)

i i

l 1

l 1

1 I

USNRC MONTHLY OPERATING REPORT Docket No: 50-362

. SAN CNOFRE NUCLEAR GENERATING STATION Unit Name: SONGS-3 UNIT 3 Date: December 14,1998 November 1998 Completed by: C. E. Williams Telephone: (949) 368-6707 Page 1 of 3 1

OPERATING DATA REPORT siv iDe'aign' Electrical Rating (Net MWe)P2 M <

h1080.9 2 Maximum Dependable Capacity (Gross MWe) 1127 R$1 l Maximum Dependable Capacity:(Net'MWe)! <

s10801 This Month

  • Yr to-Date* Cumulative
  • E4:) !Numbsrlof Hours in Period $720s 18,016j 4128,6681) 4 Nu ..oer of Hours Reactor Was Critica; 720 7,570 104,371 l

^

l h61i Hours; Generator.On lins! 4

??20) ' A s7,560.it @102,452s

! 6 Unit Reserve Shutdown Hours 0 0 0 s7s ! Net Electrical Energy. Generated (MWh) ?800A74s 28,230,9003 4106'834,3541 ,

l

  • Rounded i-i I l

b 2

i 1

i j

4

., , - -- ., _ ~ . - - .

USNRC MONTHLY OPERATING REPORT Docket No: 50-362 SAN ONOFRE NUCLEAR GENERATING STATION Unit Name: SONGS-3 i UNIT 3 Date: December 14,1998 November 1998 Completed by: C. E. Williams Telephone: (949) 368-6707 Page 2 of 3 UNIT SHUTDOWNS AND POWER REDUCTIONS

' Numbed W '

iLNone Date N/A iType (1)1 LN/Af Duration (Hours) N/A 4 ' Reason ~(2)? >

B:N/Alf Method of shutting down reactor (3) N/A LER Nos GN/Ai System Code (4) N/A Component Co'de (5)) fN/Ai Cause and corrective action to prevent recurrence N/A (1) F Forced S Scheduled (2) Reason: A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E operator Trairing & Ucense Examination F Administrative G operatonal Error (Explain)

H-other (Explain)

(3) Method: 1 Manual 2 Manual Screm 3-Automatic Scram 4 Continuation from Previous Month 5-Reduction in the Average Daily Power Level of more than 20% from the previous day 6-Other (Explain)

(4) IEEE Std 8051984 (5) IEEE Std 803A-1983

. l USNRC MONTHLY OPERATING CEPORT Docket No: 50-362 SAN ONOFRE NUCLEAR GENERATING STATION Unit Name: SONGS-3 UNIT 3 Date: December 14,1998 November 1998 Completed by: C. E. Williams ,

Telephone: (949) 368-6707 )

Page 3 of 3 I

l

SUMMARY

OF OPERATING EXPERIENCE FOR THE MONTH 1

l Date Time Event l 111/01/981 ;0001s Model;;1299.9%.Reactof PoWenu156.M.WeM433;EEPDb ,

j 11/30/98 2400 Mode 1,99.9% Reactor Power,1161 Mwe,472.8 EFPD.

i

!