|
---|
Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217E3381999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Songs,Units 2 & 3 ML20211Q8201999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Songs,Units 2 & 3. with ML20210Q6521999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Songs,Units 2 & 3 ML20209C9281999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Songs,Units 2 & 3. with ML20195H5491999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Songs,Units 2 & 3 ML20206S7281999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Songs,Units 2 & 3 ML20205Q0981999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Songs,Units 2 & 3 ML20204F8101999-02-28028 February 1999 Monthly Operating Repts for Songs,Units 2 & 3.With ML20199F0771998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Songs,Units 2 & 3 ML20198C3471998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Songs,Units 2 & 3 ML20195H2471998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Songs,Units 2 & 3 ML20154M7921998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Songs,Units 2 & 3 ML20151Z9851998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Songs,Units 2 & 3 ML20237B8571998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Songs,Units 2 & 3 ML20236R1031998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Songs,Units 2 & 3 ML20249A9431998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Songs,Units 2 & 3 ML20247L5181998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Songs,Units 2 & 3 ML20217A0141998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Songs,Units 2 & 3 ML20216J3551998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Songs,Units 2 & 3 ML20202F9731998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Songs,Units 2 & 3 ML20198Q6701997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for San Onofre Nuclear Generating Station Units 2 & 3 ML20203F3361997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Songs,Units 1 & 2 ML20199A5011997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for San Onofre Nuclear Generation Station Units 2 & 3 ML20211N6981997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for San Onofre Nuclear Generating Station Units 2 & 3 ML20210V0721997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for SONGS ML20210V0771997-07-31031 July 1997 Revised MORs for July 1997 for SONGS ML18040A0051997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for San Onofre Nuclear Generating Station.W/970813 Ltr ML20149E3331997-06-30030 June 1997 Monthly Operating Repts for June 1997 for SONGS ML20148L8261997-05-31031 May 1997 Monthly Operating Repts for May 1997 for San Onofre Nuclear Generating Station Units 1 & 2 ML20141E3451997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for SONGS Units 2 & 3 ML20137X8181997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for San Onofre Nuclear Generation Station,Units 2 & 3 ML20137C1991997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for San Onofre Nuclear Generating Station,Units 2 & 3 ML20138M3761997-01-31031 January 1997 Monthly Operating Rept for Jan 1997 for San Onofre Nuclear Generating Station,Unit 2 ML20138M4171996-12-31031 December 1996 Monthly Operating Rept for Dec 1996 for Songs,Unit 3 ML20133M4151996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for SONGS Units 2 & 3 ML20138M4121996-11-30030 November 1996 Monthly Operating Rept for Nov 1996 for Songs,Unit 3 ML20132D8901996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for San Onofre Nuclear Generating Station,Units 2 & 3 ML20134K7371996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Songs,Units 2 & 3 ML20138M3881996-10-31031 October 1996 Monthly Operating Rept for Oct 1996 for Songs,Unit 3 ML20133M4451996-10-31031 October 1996 Revised MOR for Oct 1996 for SONGS Unit 3 ML20133M4361996-09-30030 September 1996 Revised MOR for Sept 1996 for SONGS Unit 3 ML20128Q0931996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Songs,Units 2 & 3 ML20117M9751996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for San Onofre Nuclear Generating Station Units 2 & 3 ML20133M4261996-08-31031 August 1996 Revised MOR for Aug 1996 for SONGS Units 2 & 3 ML20116M8711996-07-31031 July 1996 Monthly Operating Repts for July 1996 for Songs,Units 2 & 3 ML20115H0451996-06-30030 June 1996 Monthly Operating Repts for June 1996 for SONGS ML20117M6911996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Songs,Units 2 & 3 ML20117G2001996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for SONGS Units 2 & 3 ML20107G0121996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for San Onofre Nuclear Generating Station,Units 2 & 3 ML20106H2221996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for SONGS Units 2 & 3 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217B4471999-10-0707 October 1999 Safety Evaluation Supporting Amends 159 & 150 to Licenses NPF-10 & NPF-15,respectively ML20217E3381999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Songs,Units 2 & 3 05000361/LER-1999-005-01, :on 990831,loss of Physical Separation in Control Room,Occurred.Caused by Personnel Error.Creacus Train a Was Returned to Standby on 9908311999-09-23023 September 1999
- on 990831,loss of Physical Separation in Control Room,Occurred.Caused by Personnel Error.Creacus Train a Was Returned to Standby on 990831
ML20212A1471999-09-13013 September 1999 Special Rept:On 990904,condenser Monitor Was Declared Inoperable.Difficulties Encountered During Component Replacement Precluded SCE from Restoring Monitor to Service within 72 H.Alternate Method of Monitoring Was Established ML20211R0571999-09-0909 September 1999 Safety Evaluation Supporting Amends 158 & 149 to Licenses NPF-10 & NPF-15,respectively ML20212A2391999-09-0707 September 1999 Safety Evaluation Supporting Amends 157 & 148 to Licenses NPF-10 & NPF-15,respectively ML20211N0511999-09-0303 September 1999 SER Approving Exemption from Certain Requirements of 10CFR50.44 & 10CFR50 App A,General Design Criterion 41 to Remove Requirements from Hydrogen Control Systems from SONGS Units 2 & 3 Design Basis 05000206/LER-1999-001-02, :on 990808,unattended Security Weapon Was Discovered Inside Pa.Caused by Posted Security Officer Falling Asleep.Officer Was Relieved of Duties,Pa Access Was Removed & Officer Was Placed on Investigatory Suspension1999-08-31031 August 1999
- on 990808,unattended Security Weapon Was Discovered Inside Pa.Caused by Posted Security Officer Falling Asleep.Officer Was Relieved of Duties,Pa Access Was Removed & Officer Was Placed on Investigatory Suspension
ML20211Q8201999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Songs,Units 2 & 3. with ML20211H8621999-08-23023 August 1999 Safety Evaluation Accepting Licensee Requests for Relief RR-E-2-03 - RR-E-2-08 from Exam Requirements of Applicable ASME Code,Section Xi,For First Containment ISI Interval ML20211E9441999-08-19019 August 1999 Safety Evaluation Supporting Amends 156 & 147 to Licenses NPF-10 & NPF-15,respectively ML20211F2211999-08-19019 August 1999 Safety Evaluation Supporting Amends 155 & 146 to Licenses NPF-10 & NPF-15,respectively ML20210P4791999-08-11011 August 1999 COLR Cycle 10 Songs,Unit 3 ML20210P4731999-08-11011 August 1999 COLR Cycle 10 Songs,Unit 2 05000361/LER-1999-004-01, :on 990708,automatic Tgis Actuation Occurred. Caused by Small Leak in Suction Side of Tgis Train a Sample Pump.Small Leak Repaired1999-08-0606 August 1999
- on 990708,automatic Tgis Actuation Occurred. Caused by Small Leak in Suction Side of Tgis Train a Sample Pump.Small Leak Repaired
ML20210Q6521999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Songs,Units 2 & 3 ML20210L2771999-07-30030 July 1999 SONGS Unit 3 ISI Summary Rept 2nd Interval,2nd Period Cycle 10 Refueling Outage U3C10 Site Technical Services 05000362/LER-1999-005, :on 990630,discovered LTOP Sys Relief Valve Setpoint Was Higher than Allowed by Ts.Cause Indeterminate. Subject Valve Will Be Disassembled & Inspected to Determine Caused of High Setpoint.With1999-07-28028 July 1999
- on 990630,discovered LTOP Sys Relief Valve Setpoint Was Higher than Allowed by Ts.Cause Indeterminate. Subject Valve Will Be Disassembled & Inspected to Determine Caused of High Setpoint.With
05000362/LER-1999-006, :on 990623,EDG 3G003 Was Inadvertently Made Inoperable.Caused by Operators Aligning EDG to Inoperable Automatic Voltage Regulator.Licensee Will Revise Process of Locating Tags.With1999-07-26026 July 1999
- on 990623,EDG 3G003 Was Inadvertently Made Inoperable.Caused by Operators Aligning EDG to Inoperable Automatic Voltage Regulator.Licensee Will Revise Process of Locating Tags.With
ML20209G8991999-07-12012 July 1999 Safety Evaluation Supporting Amends 154 & 145 to Licenses NPF-10 & NPF-15,respectively ML20209C9281999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Songs,Units 2 & 3. with 05000362/LER-1999-003-01, :on 990513,reactor Manually Tripped Due to Loss of Main Feedwater.Caused by Open Relay Contact in Output of Feedwater Regulation Control Sys.Faulty Relay Was Replaced1999-06-11011 June 1999
- on 990513,reactor Manually Tripped Due to Loss of Main Feedwater.Caused by Open Relay Contact in Output of Feedwater Regulation Control Sys.Faulty Relay Was Replaced
05000362/LER-1999-004, :on 990515,reactor Manually Tripped Due to Feedwater Control Valve Opening.Caused by Faulty Valve Positioner.Faulty Positioner Was Replaced1999-06-11011 June 1999
- on 990515,reactor Manually Tripped Due to Feedwater Control Valve Opening.Caused by Faulty Valve Positioner.Faulty Positioner Was Replaced
ML20195D3061999-06-0202 June 1999 Safety Evaluation of TR SCE-9801-P, Reload Analysis Methodology for San Onofre Nuclear Generating Station,Units 2 & 3. Rept Acceptable ML20195H5491999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Songs,Units 2 & 3 05000362/LER-1999-002-01, :on 990328,RWST Outlet Isolation Valve Failed to Open After Being Closed for Testing.Caused by Degradation of Valve.Rwst Oulet Valve Was Repaired.With1999-05-20020 May 1999
- on 990328,RWST Outlet Isolation Valve Failed to Open After Being Closed for Testing.Caused by Degradation of Valve.Rwst Oulet Valve Was Repaired.With
ML20207A0211999-05-13013 May 1999 Safety Evaluation Supporting Amends 153 & 144 to Licenses NPF-10 & NPF-15,respectively ML20196L3221999-05-11011 May 1999 SONGS Unit 2 ISI Summary Rept 2nd Interval,2nd Period Cycle-10 Refueling Outage ML20206H2611999-05-0505 May 1999 Part 21 Rept Re Defect Found in Potter & Brumfield Relays. Sixteen Relays Supplied in Lot 913501 by Vendor as Commercial Grade Items.Caused by Insufficient Contact Pad Welding.Relays Replaced with New Relays ML20206S7281999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Songs,Units 2 & 3 ML20206G6561999-04-27027 April 1999 SER Accepting Proposed Exemption from 10CFR50.71(e)(4) for SONGS Units 2 & 3 ML20206D1461999-04-26026 April 1999 Safety Evaluation Supporting Amend 152 to License NPF-10 ML20205Q6221999-04-19019 April 1999 Safety Evaluation Authorizing Proposed Alternative to Use Wire Penetrameters for ISI Radiography in Place of ASME Code Requirement ML20205R0371999-04-16016 April 1999 SER Approving Proposed Deviation from Approved Fire Protection Program Incorporating Technical Requirements of 10CFR50,App R,Section III.0 That Applies to RCP Oil Fill Piping ML20205N2691999-04-0909 April 1999 Safety Evaluation Supporting Amends 151 & 143 to Licenses NPF-10 & NPF-15,respectively ML20205G2611999-04-0101 April 1999 Special Rept:On 990328,3RT-7865 Was Removed from Service. Monitor Is Scheduled to Be Returned to Service Prior to Mode 4 Entry (Early May 1999) Which Will Exceed 72 H Allowed by LCS 3.3.102.Alternate Method of Monitoring Will Be Used ML20205Q0981999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Songs,Units 2 & 3 05000362/LER-1999-001-01, :on 990211,TS 3.0.3 Entered Due to Both Chilled Water Trains Being Inoperable.Warm Main Condenser Discharged Water Diverted in Salt Water Cooling (Swc)(Bs) Intake.With1999-03-12012 March 1999
- on 990211,TS 3.0.3 Entered Due to Both Chilled Water Trains Being Inoperable.Warm Main Condenser Discharged Water Diverted in Salt Water Cooling (Swc)(Bs) Intake.With
05000361/LER-1999-002, :on 990208,pressurizer Safety Valves Were Above TS Limit.Caused by Setpoint Drift.Sce Submitted License Amend Application on 980904 Requesting Tolerence Be Changed to +3/-2%.With1999-03-10010 March 1999
- on 990208,pressurizer Safety Valves Were Above TS Limit.Caused by Setpoint Drift.Sce Submitted License Amend Application on 980904 Requesting Tolerence Be Changed to +3/-2%.With
05000361/LER-1999-001, :on 990201,automatic Start of EDG Was Noted. Caused by Workers Closing Breaker 2A0418 by Discharging Closing Springs.Operators Restored SDC in Approx 26 Minutes. with1999-03-0303 March 1999
- on 990201,automatic Start of EDG Was Noted. Caused by Workers Closing Breaker 2A0418 by Discharging Closing Springs.Operators Restored SDC in Approx 26 Minutes. with
ML20204F8101999-02-28028 February 1999 Monthly Operating Repts for Songs,Units 2 & 3.With ML20203J1131999-02-12012 February 1999 Safety Evaluation Supporting Amends 150 & 142 to Licenses NPF-10 & NPF-15,respectively ML20203J1981999-02-12012 February 1999 Safety Evaluation Supporting Amends 149 & 141 to Licenses NPF-10 & NPF-15,respectively NUREG-0800, Safety Evaluation Supporting Amends 148 & 140 to Licenses NPF-10 & NPF-15,respectively1999-02-0909 February 1999 Safety Evaluation Supporting Amends 148 & 140 to Licenses NPF-10 & NPF-15,respectively ML20202F7041999-01-21021 January 1999 Special Rept:On 990106,SCE Began to Modify 2RT-7865.2RT-7865 to Allow Monitor to Provide Input to New Radiation Monitoring Data Acquisition Sys.Monitor Found to Exceeds 72 H Allowed Bt LCS 3.3.102.Alternate Monitoring Established ML20206H2101998-12-31031 December 1998 SCE 1998 Annual Rept ML20199F0771998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Songs,Units 2 & 3 ML20206N6281998-12-16016 December 1998 Safety Evaluation Supporting Amends 145 & 137 to Licenses NPF-10 & NPF-15,respectively ML20198A6731998-12-11011 December 1998 Special Rept:On 981124,meteorological Sys Wind Direction Sensor Was Observed to Be Inoperable.Caused by Loss of Communication from Tower to Cr.Sensor Was Replaced & Sys Was Declared Operable on 981204 ML20196D8901998-11-30030 November 1998 Non-proprietary Reload Analysis Methodology for Songs,Units 2 & 3 1999-09-09
[Table view] |
Text
f
'h SOUTHlRN CAltlORNIA A. Edward Scherer du hlCQ Manager of L/u J V Nuclear Regulatory Affairs An LDIMW lhTlRhATIO% AL'" Company September 13,1999 U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555
Subject:
Docket Nos. 50-361 and 50-362 Monthly Operating Reports for August 1999 San Onofre Nuclear Generating Station, Units 2 and 3 i
Gentlemen:
Technical Specification 5.7.1.4 of Facility Operating Licenses NPF-10 and NPF-15 for the San Onofre Nuclear Generating Station, Units 2 and 3, respectively, requires Southern California Edison to provide a Monthly Operating Report (MOR) of operating statistics and shutdown experience, including documentation of all challenges to pressurizer safety valves, for each unit. Attachments 1 and 2 provide the subject Monthly Operating Reports for Units 2 and 3, respectively. There were no challenges to pressurizer safety valves for either Unit 2 or 3.
If you have any questions, please contact Mr. Clay E. Williams at (949) 368-6707.
Sincerely, 9909150166 990831 i
PDR ADOCK 05000361 R
PDR Attachments I & 2 b
cc:
E. W. Merschoff, Regional Administrator, NRC Region IV L. Raghavan, NRC Project Manager, San Onofre Units 2 & 3 J. A. Sloan, NRC Senior Resident inspector, San Onofre Unit 2 & 3 P. O llox !28 j { I, a.. } h San Clemente. CA 92674-0128 449 368 7501 Fax 949 368-7575 j
a
?
l
)
NRC Monthly Operating Report, August 1999 San Onofre Nuclear Generating Station, Unit 2 l
J USNRC MONTHLY OPERATING REPORT Docket No:
50-361 SAN ONOFR.E NUCLEAR GENERATING STATION Unit Name:
SONGS-2 UNIT 2 Date:
September 13,1999 August 1999
. Completed by: C. E. Williams Telephone:
(949) 368-6707 Page 1 of 3 OPERATING DATA REPORT
- 0.70))
{
slU Design Electical Rating (Not MWe)1 EE e se m
~
2 Maximum Dependable Capacity (Gross MWe) 1127 i31 Maximum Dependable Capacitf(Not MWe)h ff9E
@+
$10703 This Month
Cumulative *
@5$ NumberMHours%yydodi$, W' ?
$7Mi
, !533{i jf46,5'2}a l
9 5
Number of Hours Reactor Was Critical 744 4,576 110,058
{M Hours GerisiWOn.eFe,en, >- @ f dW44is ^
< sfy. 1;sii Bos;;3ssii
)
7 Unit Reserve Shutdown Hours 0
0 0
l 1
....y.,..;.....
1 Electrica[En.,,_...,Generatedgik is2M50s ~
%,;...c4 975,37s! %114,eos,8201 18] W.
ergy
\\
USNRC MONTHLY OPERATING REPORT Docket No:
50-361 J SAN ONOFRE NUCLEAR GENERATING STATION Unit Name:
SONGS-2 UNIT 2 Date:
September 13,1999 August 1999 Completed by: C. E. Williams Telephone:
(949) 368-6707 Page 2 of 3 i
UNIT SHUTDOWNS AND POWER REDUCTIONS Number %stw*W P
HNone) -
s -
4 Date N/A TypF(1)?M Mep$$! M, k * * ~+ M N/As M~
Duration (Hours)
N/A LReason(2)N a
n si MMW
!N/Ai
~~
4 Method of shutting down reactor (3)
N/A LLER Nok s
,e'
/. A
' eis1N/A!! ?
ass s
System Code (4)
N/A Component Code:(5)) 2 ' 34g,+
fn %n IN/Aij s/
Cause and corrective action to prevent N/A (1) F-Forced S-Scheduled
}
)
(2) Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refuehng D-Regulatory Restriction E-Operator Trairing & License Exonnation F-Administrative G-Operational Error (Explain)
H-Other (Explain)
(3) Method.
1-Manuel 2-Manuel Scram 3-Automatic Scram 4-Continuation from Previous Month 5-Reduction in the Average Daily Power Level of more then 20% from the previous day j
6-Other (Explain)
(4) IEEE Std 8051984 (5) IEEE !;td 803A-1983 1
3 i
)
USNRC MONTHLY OPERATING REPORT Docket No:
50-361 SAN ONOFRE NUCLEAR GENERATING STATION Unit Name:
SONGS-2 3
UNIT 2 Date:
September 13,1999 August 1999 Completed by: C. E. Williams Telephone:
(949) 368-6707 Page 3 of 3
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH Date Time Event iO8/01/993 0001)
Mode 51799,91 % Reactor;Powern1164.MWei esma x
Turbine load reduced to 980 Mwe in support of LP#3 Stop &
08/19/99 1800 Governor Valve testing gg: ;Turt>ine load restored toji145MWe;followlycompletion of.LP#32,
gg%
- Stopand gov 6rnorValVe tsstinas
~^
08/31/99 2400 Mode 1,99.89% Reactor Power,1167 MWe i
i 1
l
o n
NRC Monthly Operating Report, August 1999 San Onofre Nuclear Generating Station, Unit 3 l
l l
l
l l
USNRC MONTHLY OPERATING REPORT '
Docket No:
50-362 SAN ONOFRE NUCLEAR GENERATING STATION Unit Name:
SONGS-3 UNIT 3 Date:
September 13,1999 August 1999 Completed by: C. E. Williams Telephone:
(949) 368-6707 Page 1 of 3 OPERATING DATA REPORT lis Design Electrical Rating'(Not MWe)!! w ' < RB W h ee E n8E A E10803 2
Maximum Dependable Capacity (Gross MWe) 1127
?34 Maximum Dependable Capaciti'(Not MWe)tr '
~ %F '
- 10801 This Month
- s4F Number::bf Hoursiin Period 5e WD744%
a (sl,sais 113s;14 5
Number of Hours Reactor Was Critical 744 4,792 109,908 9 07,926)!-
16:h Hours GeneratorOrHineit : *~
!!744s
' M7soji 7
Unit Reserve Shutdown Hours o
o o
i8f? Net Electrical Energy'Geneisted'(MWh)'
- a22. eses
?s;171;487#
4112, ass,sses
1 i
\\
j-1 I
USNRC ' ONTHLY OPERATING REPORT Docket No:
50-362 M
J SAN ONOFRE NUCLEAR GENERATING STATION Unit Name:
SONGS-3 UNIT 3 Date:
September 13,1999 August 1999 Completed by: C. E. Williams Telephone:
(949) 368-6707 Page 2 of 3 UNIT SHUTDOWNS AND POWER REDUCTIONS Number-4 W
.d' dNonei * ^
m'
~
Date N/A
- T y (1)$ f d @Manm
- %
g ** Ine @!# @ @? %
MNIAi ' 4 Duration (Hours)
N/A l
m-(2R
- V
!* ~
ta*
- E M d5 !N/Ai N1 Method of shutting down reactor (3)
N/A 1ER:No$
NM en
$N/M s
w System Code (4)
N/A l
Component Codo!(5)?
E
!A sN/As E/
s Cause and corrective action to prevent N/A (1) F-Forced S-Scheduled (2) Reason:
A-Equiprient Feliure (Explain)
B-Maintenance or Test C-Refueling D-Reguletory Restriction E-Operator Trairing & Ucense Examenstion F-Adrninistrative G-Operational Error (Explain)
H-Other (Explain)
(3) Method 1-Manuel 2-Manuel Scram 3-Automehc Scram 4-Conhnusten from Previous Month 5-Reduction in the Average Daily Power Level of more then 20% from the previous day 8-Other (Explain)
(4) IEEE Std 805-1984 (5) IEEE Std 803A-1983
l USNRC MONTHLY OPERATING REPORT Docket No:
50-362
. SAN ONOFRE NUCLEAR GENERATING STATION Unit Name:
SONGS-3 UNIT 3 Date:
September 13,1999 August 1999 Completed by: C. E. Williams Telephone:
(949) 368-6707
{
Page 3 of 3 I
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH Date Time Event 08/01/99]!
LOO 0tl Model1 l 99.81 % Reactor: Power.11160. MWei 08/31/99 2400 Mode 1. 99.91% Reactor Power,1153 MWe
,