ML20246K985

From kanterella
Revision as of 16:31, 12 February 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-254/89-16 & 50-265/89-16 on 890625-0819 & Notice of Violation
ML20246K985
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 08/28/1989
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20246K991 List:
References
NUDOCS 8909060196
Download: ML20246K985 (2)


See also: IR 05000254/1989016

Text

7-- g, , a

f3

'

'

g D.

g

yy -

- Q-

.

e

v

= AUG 2 8 19*3

'

-

' Docket No. 50-254-

~

' Pocket No. 50-265:

Commonwealth Edison Company-

ATTN: Mr.-- Cordell Reed

' Senior Vice President

Post Office: Box 767-

' Chicago, IL' 60690

Gentlemen:

'This refers to'the routine resident inspectors' safety insaection conducted

by Messrs. R. L.'Higgins, D.'E. Jones', R. M. Lerch,;M. Par (er, A. Dunicp,-.

.

'

.

J. M. Shine, and R.-Bocanegra of this office, and by Messrs. T. M. Ross and

F..J. Witt.of the Office of Nuclear Reactor Regulation on June 25 through;

. August 19. 1989, of-activities at Quad. Cities Nuclear Power' Station, Units 1

and 2 authorized.by NRC Operating Licenses No. DPR-29 and No. DPR-30, hnd to

"

the discussion of our findings with Mr. G. Spedl at the conclusion of the-

11nspection.

-The enclosed. copy.oflour inspection reaort identifies areas examined.during

.the inspection. Within these areas, tie inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

!During this inspection,;certain of your activities appeared to be in violation

of NRC requirements,-as described in the enclosed Notice. The inspection

showed that actions had been taken to correct the. identified. violation (s)

and to prevent recurrence. Our understanding of your corrective actions is

. described in Paragraph 2.a; of the enclosed inspection report. Consequently,

no reply to the violation (s) is required and we have no further questions

~

regarding this matter at this time.

.In=accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter'and the enclosed inspection report will be placed-in the HRC's

.Public Document Room.

1,

'I

6\'\

'

8909060196 890828

PDR ADOCK 05000254

Q PDC

L==____________-_____-___________-_-_________-_-____ _ - _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ .

n .

_ _ _ _ _ _ - _ - _

,.

'

.

a

Commonwealth Edison Company 2 AUG 2 81999

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

" Original signed by W.D. Shafer"

W. D. Shafer, Chief

Reactor Projects Branch 1

Enclosures:

'l. Notice of Violation

2. Inspection Reports

No. 50-254/89016(DRP);

No. 50-265/89016(DRP)

cc w/ enclosures:

T. Kovach, Nuclear

Licensing Manager

R. L. Bax, Station Manager

DCD/DCB (RIDS).

Licensing Fee Management Branch

Resident Inspector, RIII

Richard Hubbard

J. W. McCaffrey, Chief, Public

Utilities Division

Dresden SRI

LaSalle SRI

1

l

l

RIII RI

[ ,

'

.

QNt/

i 53 /jp Lerch r

0844[/89

- - _ .