Ack Receipt of 890403 Ltr Informing NRC of Corrective Actions Taken Re 890302 Notice of Violation
ML20245A527
Person / Time
Site: Cooper Entergy icon.png
Issue date: 04/14/1989
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Trevors G
NEBRASKA PUBLIC POWER DISTRICT
References
NUDOCS 8904250252
Download: ML20245A527 (2)


Text

-

y ~Y

.v.w APR I 41989

'In 11eply Pefer To:

Docket: 50-298/89 I Nebraska Public Power District ATTN: George A.'Trevors Division Manager - Nuclear Support

.P.O. Box 499 Columbus .NE: 68602-0499 Gentlemen:-

Thank you for your letter of April 3,1989, in response to our letter and Notice of Violation dated March 2, 1989. We have reviewed your reply and find it responsive to.the' concerns raised in our Notice of Violation. We will review the implementation of your corrective actions during a future.

inspection to determine that full compliance h e been achieved and will be maintained.

Sincerely, p/q7Mwa L. J. Callan, Director Division of Reactor Projects cc:

Cooper Nuclear Station ATTN: Guy Horn, Division Manager of Nuclear Gperations P.O. Box 98 Brownville, Nebraska 68321 Kansas Radiation Control Program Director Nebraska Radiation Control Program Director bec'to DMB (IE01) t 16 g k RIV:MQPS:RI* C:MQPS* (D S M D:DRPA WMcNeill/cjg IBarnes LMilhoan LJCal" m

/ /89 / /89 y /(t/89 y/q/89

/

  • previously concurred 8

8904250252 DR 890414 g ADOCK 05000298 ffl PNU i

w ..

l'

. s '. y *

?

. Nebraska Public Power District -2 '

~ bec distrib. by: RIV:

RRI. . R. D. Martin ~RA Section Chief (DRP/C) Lisa Shea,'RM/ALF.-

l RPB-DRSS MIS System .

J. RIV ' File - ProjectEngineer(DRP/C).

l RSTS Operator- .

DRP P. O'Connor, NP.R' Project Manager (MS:- 13-D-18)

DRS- I. Barnes' B. McNeill-f

__.Um._._m_ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ . , , _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ , _ _ _ _ _ _ _ _ _ , _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ , , _ _ _ _ _ . _ _ _ _ _ _ _ _ , _ _ _ _ _ _ , _ _ _ _ _ _ _ _ _ _ _ _ _ , , _ _ _ _ _ _ _ _ _ ,

- . a, .i

  • - l GENERAL OFFICE j

} Nebraska Public Power District " "

"%en"!O#f"^M^ ""** ..-

NLS8900134 -- - - - -

April 3, 1989 l j '[hpb_(_U

._..=_.u _.

hyh 2 - - y 7

,p9 l 4 APR r 61989 .

U.S. Nuclear Regulatory Commission Attention: Document Control Desk g i Washington, DC 20555 Gentlemen:

Subject:

NPPD Response to Inspection Report 50-298/89-05 This letter is written in response to your letter dated March 2, 1989, transmitting Inspection Report 50-298/89-05. Therein you indicated that certain of our activities were in violation of NRC requirements.

Following is a statement of the violation and our response in accordance with 10 CFR 2.201..

Statement of Violation Failure to Maintain Training Records Criterion V of Appendix B to 10 CFR 50 and the licensee's approved quality assurance program description require that activities affecting quality shall be accomplished in accordance with documented instructions.

"SRAB Training Program Guidelines," Change 2, Attachment 3 to the "SRAB Instructions and Guidelines," requires that records will be maintained of the 20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br /> of training that SRAB members participate in cach year.

Contrary to the above, the NRC inspector found from the review of records-that one member of SRAB had not completed the 20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br /> of required training in the year 1988.

This is a Severity Level V violation. (Supplement I) (298/8905-01)

Reason For The Violation The District believes that the subject violation should more properly be characterized as a failure of a SRAB member to receive the 20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br /> of SRAB Training required by.the District's Safety Review and Audit Board Instructions and Guidelines rather than as a failure to maintain training records. The SRAB training records accurately reflected the 14.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> that the SRAB member did received. The violation occurred as a result of the particular SRAB member's inability to schedule himself for the requisite hours of SRAB training due to conflicts with his normal duties f&%%M a a ri a- . m. w , ,a, w mwm+ ou ~PowerfulPridaistNebraskair

' M

- - - - - - - - - . - - - - - - - _ - _ - - - - _ - - - - - - , - - - - . a

.. .or 'y '

NLS8900134 l

.U.S. Document Control Desk l

- Page 2 J 1-L and the fact that the Board itself did not schedule 20 or more hours of formal SRAB training in 1988 and ensure that a]l members had the i-opportunity to attend. SRAB members were encouraged to obtain the' training hours on their own.

Corrective Stene Which Have Been Taken and the Results Achieved All members of SRAB were counseled on uhe importance of meeting the SRAB Instructions and Guidelines training requirements for 1989. The SRAB Chairman reviewed the training record of the subject SRAB member and concluded that the missing 5.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> of training for 1988 did not prevent him from performing as an effective member of the Board.

Corrective Steps Taken To Avoid Further Violation Training requirements for SRAB are currently under review with the aim of documenting them in a Training Program Description (TPD) under the formal Nuclear Training Program. It is anticipated that the Training Program Description for SRAB members will be closely related to that which is being developed for the Station Operation Review Committee (SORC). The SRAB Instructions and Guidelines will then be changed to reflect the revised training requirements. In addition, the SRAB Chairman will schedule at least 20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br /> of formal SRAB training during 1989 and ensure that each SRAB member meets this current minimum requirements until the new TPD program is put in place.

Date When Full Compliance Vill be Achieved The revised training requirements for SRAB will be in effect prior to the end of 1989. In the interim all SRAB members are expected to received at least 20 hours2.314815e-4 days <br />0.00556 hours <br />3.306878e-5 weeks <br />7.61e-6 months <br /> of appropriate training during calendar year 1989.

Please contact me if you have any questions regarding this response.

Sincerely, Md

.-[orG.A.Trevors Division Manager Nuclear Support

/rg cc: YegionalAdministrator USNRC - Region IV NRC Resident Inspector Cooper Nuclear Station