Category:INSPECTION REPORT
MONTHYEARIR 05000424/19990061999-10-0101 October 1999 Insp Repts 50-424/99-06 & 50-425/99-06 on 990725-0904. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19990051999-08-16016 August 1999 Insp Repts 50-424/99-05 & 50-425/99-05 on 990620-0724.No Violations Noted.Major Areas Inspected:Opertions, Engineering,Maintenance & Plant Support.Results of Announced Insp by Security Inspector Also Encl IR 05000424/19990041999-07-15015 July 1999 Insp Repts 50-424/99-04 & 50-425/99-04 on 990502-0619. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000424/19990031999-05-19019 May 1999 Insp Repts 50-424/99-03 & 50-425/99-03 on 990321-0501. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000424/19990021999-04-15015 April 1999 Insp Repts 50-424/99-02 & 50-425/99-02 on 990214-0320. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000424/19990011999-03-0808 March 1999 Partially Withheld Insp Repts 50-424/99-01 & 50-425/99-01 on 990125-27 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Area of Plant Support by Regional Safeguards Inspector & Select Personnel from NRR IR 05000424/19980101999-03-0303 March 1999 Insp Repts 50-424/98-10 & 50-425/98-10 on 981227-990213.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support.Rept Covers 7-wk Period of Insp & Insps in Area of Health Physica & EP IR 05000424/19980091999-01-20020 January 1999 Insp Repts 50-424/98-09 & 50-425/98-09 on 981115-1226.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19980081998-12-11011 December 1998 Insp Repts 50-424/98-08 & 50-425/98-08 on 980927-1114.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19980121998-11-0909 November 1998 Partially Withheld Insp Repts 50-424/98-12 & 50-425/98-12 on 981005-09 (Ref 10CFR73.21)Major Areas Inspected:Physical Security Program for Power Reactors IR 05000424/19980071998-10-15015 October 1998 Insp Repts 50-424/98-07 & 50-425/98-07 on 980816-0926. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support.Insp Also Addressed 980904 Reactor Trip IR 05000424/19980061998-09-10010 September 1998 Insp Repts 50-424/98-06 & 50-425/98-06 on 980628-0815.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000424/19980111998-07-31031 July 1998 Insp Repts 50-424/98-11 & 50-425/98-11 on 980622-26.No Violations Noted.Major Areas Inspected:Announced Insp Was Observation & Evaluation of Biennial Emergency Preparedness Exercise for Plant IR 05000424/19980051998-07-23023 July 1998 Insp Repts 50-424/98-05 & 50-425/98-05 on 980517-0627. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20236H4081998-06-15015 June 1998 Insp Repts 50-424/98-04 & 50-425/98-04 on 980419-0516. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19980031998-05-15015 May 1998 Insp Repts 50-424/98-03 & 50-425/98-03 on 980308-0418. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19980021998-04-0202 April 1998 Insp Repts 50-424/98-02 & 50-425/98-02 on 980125-0307. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000424/19970121998-02-23023 February 1998 Insp Repts 50-424/97-12 & 50-425/97-12 on 971214-980124.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20198M6861998-01-12012 January 1998 Insp Repts 50-424/97-11 & 50-425/97-11 on 971102-1213. Violations Noted.Major Areas Inspected:Operations & Maint IR 05000424/19970101997-11-26026 November 1997 Insp Repts 50-424/97-10 & 50-425/97-10 on 970921-1101. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000424/19970091997-10-20020 October 1997 Insp Repts 50-424/97-09 & 50-425/97-09 on 970803-0920. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support & Security & Safeguards Procedures & Documentation ML20210S0601997-08-28028 August 1997 Insp Repts 50-424/97-07 & 50-425/97-07 on 970706-0802. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20210N6731997-08-14014 August 1997 Insp Repts 50-424/97-08 & 50-425/97-08 on 970623-27. Deviations Noted.Major Areas Inspected:Qa in Operations, Maint,Engineering & Health Physics ML20198F8631997-08-0404 August 1997 Insp Repts 50-424/97-06 & 50-425/97-06 on 970601-0705. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20141F7031997-06-24024 June 1997 Insp Repts 50-424/97-05 & 50-425/97-05 on 970427-0531. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Scenario for off-hour Emergency Response Drill ML20140B4071997-05-21021 May 1997 Insp Repts 50-424/97-04 & 50-425/97-04 on 970316-0426. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support & Emergency Preparedness Area ML20137X3811997-04-14014 April 1997 Integrated Insp Repts 50-424/97-01 & 50-425/97-01 on 970202- 0315.Violations Noted.Major Areas Inspected:Operations, Maint,Engineering & Plant Support ML20137T7111997-04-0404 April 1997 Insp Repts 50-424/97-03 & 50-425/97-03 on 970303-07. Violations Noted.Major Areas Inspected:Fitness for Duty & Physical Security Program for Power Reactors ML20137U6741997-03-27027 March 1997 Insp Repts 50-424/97-02 & 50-425/97-02 on 970210-0307.No Violations Noted.Major Areas Inspected:Plant Support,Solid Radwaste,Radioactive Liquid & Gaseous Waste & Radioactive Matl Transportation Programs ML20135C8511997-02-24024 February 1997 Insp Repts 50-424/96-14 & 50-425/96-14 on 961222-970201. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maintenance & Plant Support ML20134H1601997-01-17017 January 1997 Insp Repts 50-424/96-12 & 50-425/96-12 on 961110-1221. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19960131997-01-0606 January 1997 Insp Repts 50-424/96-13 & 50-425/96-13 on 961118-22. Weakness Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise ML20149M5401996-12-0505 December 1996 Insp Repts 50-424/96-11 & 50-425/96-11 on 960929-1109. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20134F0141996-10-28028 October 1996 Insp Repts 50-424/96-10 & 50-425/96-10 on 960818-0928. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19960091996-09-16016 September 1996 Insp Repts 50-424/96-09 & 50-425/96-09 on 960707-0817. Violations Noted.Major Areas Inspected:Engineering,Maint & Plant Support IR 05000424/19930271994-01-11011 January 1994 Insp Repts 50-424/93-27 & 50-425/93-27 on 931121-1218.One Noncited Violation Identified.Major Areas Inspected:Plant Operations,Surveillance,Maint,Engineered Safety Sys Walkdown & Evaluation of Licensee self-assessment IR 05000424/19930181993-12-22022 December 1993 Insp Repts 50-424/93-18 & 50-425/93-18 on 931129-1203. Violations Noted.Major Areas Inspected:Licensed Operator Requalification Training ML20059B5951993-12-13013 December 1993 Insp Repts 50-424/93-26 & 50-425/93-26 on 931024-1120. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maintenance,Fire Protection & Followup of Open Items ML20058J2441993-11-17017 November 1993 Insp Repts 50-424/93-23 & 50-425/93-23 on 930919-1023. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Complex Surveillance,Maintenance,Mid Loop Reduced Inventory Activities & Modifications IR 05000424/19930241993-10-27027 October 1993 Insp Repts 50-424/93-24 & 50-425/93-24 on 931004-08.No Violations Noted.Major Areas Inspected:Unit 2 Isi,Review of Radiographic Film & EC ET Exam of SG Tubes IR 05000424/19930221993-10-15015 October 1993 Insp Repts 50-424/93-22 & 50-425/93-22 on 930920-24.No Violations Noted.Major Areas Inspected:Occupational Radiation Safety,Training & Qualification,Exposure Control & Maintaining Exposures ALARA IR 05000424/19930211993-10-0707 October 1993 Insp Repts 50-424/93-21 & 50-425/93-21 on 930822-0918.No Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint,Esf Sys Walkdown,Installation & Testing of Mods & Followup of Open Items ML20057E7961993-09-30030 September 1993 Insp Repts 50-424/93-20 & 50-425/93-20 on 930830-0903. Violations Noted.Major Areas Inspected:Radiation Protection Program Activities Associated W/Llrw Processing,Temporary Storage,Transportation & Offsite Dose Assessment IR 05000424/19930171993-09-0707 September 1993 Insp Repts 50-424/93-17 & 50-425/93-17 on 930801-21.Noncited Violation Noted.Major Areas Inspected:Plant Operations, Surveillance,Maintenance,Evaluation of Licensee self-assessment & Employee Concerns Program ML20056G8491993-08-23023 August 1993 Insp Repts 50-424/93-16 & 50-425/93-16 on Stated Date. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint & Fire Protection IR 05000424/19930191993-08-21021 August 1993 Insp Repts 50-424/93-19 & 50-425/93-19 on 930802-06.No Violations or Deviations Noted.Major Areas Inspected: Observation & Evaluation of Annual Emergency Preparedness Exercise IR 05000424/19930141993-07-14014 July 1993 Insp Repts 50-424/93-14 & 50-425/93-14 on 930530-0626. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint & Followup of Open Items IR 05000424/19930031993-03-17017 March 1993 Insp Repts 50-424/93-03 & 50-425/93-03.Noncited Violation Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint & Refueling Activities IR 05000424/19920311993-01-26026 January 1993 Insp Repts 50-424/92-31 & 50-425/92-31 on 921129-930102. Noncited Violation Noted.Major Areas Inspected:Plant Operations,Surveillance,Maint,Review of SNM Accountability Program & Review of LERs & Followup IR 05000424/19920281993-01-0505 January 1993 Insp Repts 50-424/92-28 & 50-425/92-28 on 921130-1204. Violations Noted.Major Areas Inspected:Rp Program Activities Associated W/Llrw Processing,Temporary Storage & Transportation,Liquid & Gaseous Effluent Monitor 1999-08-16
[Table view] Category:NRC-GENERATED
MONTHYEARIR 05000424/19990061999-10-0101 October 1999 Insp Repts 50-424/99-06 & 50-425/99-06 on 990725-0904. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19990051999-08-16016 August 1999 Insp Repts 50-424/99-05 & 50-425/99-05 on 990620-0724.No Violations Noted.Major Areas Inspected:Opertions, Engineering,Maintenance & Plant Support.Results of Announced Insp by Security Inspector Also Encl IR 05000424/19990041999-07-15015 July 1999 Insp Repts 50-424/99-04 & 50-425/99-04 on 990502-0619. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000424/19990031999-05-19019 May 1999 Insp Repts 50-424/99-03 & 50-425/99-03 on 990321-0501. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000424/19990021999-04-15015 April 1999 Insp Repts 50-424/99-02 & 50-425/99-02 on 990214-0320. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000424/19990011999-03-0808 March 1999 Partially Withheld Insp Repts 50-424/99-01 & 50-425/99-01 on 990125-27 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Area of Plant Support by Regional Safeguards Inspector & Select Personnel from NRR IR 05000424/19980101999-03-0303 March 1999 Insp Repts 50-424/98-10 & 50-425/98-10 on 981227-990213.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support.Rept Covers 7-wk Period of Insp & Insps in Area of Health Physica & EP IR 05000424/19980091999-01-20020 January 1999 Insp Repts 50-424/98-09 & 50-425/98-09 on 981115-1226.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19980081998-12-11011 December 1998 Insp Repts 50-424/98-08 & 50-425/98-08 on 980927-1114.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19980121998-11-0909 November 1998 Partially Withheld Insp Repts 50-424/98-12 & 50-425/98-12 on 981005-09 (Ref 10CFR73.21)Major Areas Inspected:Physical Security Program for Power Reactors IR 05000424/19980071998-10-15015 October 1998 Insp Repts 50-424/98-07 & 50-425/98-07 on 980816-0926. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support.Insp Also Addressed 980904 Reactor Trip IR 05000424/19980061998-09-10010 September 1998 Insp Repts 50-424/98-06 & 50-425/98-06 on 980628-0815.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000424/19980111998-07-31031 July 1998 Insp Repts 50-424/98-11 & 50-425/98-11 on 980622-26.No Violations Noted.Major Areas Inspected:Announced Insp Was Observation & Evaluation of Biennial Emergency Preparedness Exercise for Plant IR 05000424/19980051998-07-23023 July 1998 Insp Repts 50-424/98-05 & 50-425/98-05 on 980517-0627. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20236H4081998-06-15015 June 1998 Insp Repts 50-424/98-04 & 50-425/98-04 on 980419-0516. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19980031998-05-15015 May 1998 Insp Repts 50-424/98-03 & 50-425/98-03 on 980308-0418. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19980021998-04-0202 April 1998 Insp Repts 50-424/98-02 & 50-425/98-02 on 980125-0307. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000424/19970121998-02-23023 February 1998 Insp Repts 50-424/97-12 & 50-425/97-12 on 971214-980124.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20198M6861998-01-12012 January 1998 Insp Repts 50-424/97-11 & 50-425/97-11 on 971102-1213. Violations Noted.Major Areas Inspected:Operations & Maint IR 05000424/19970101997-11-26026 November 1997 Insp Repts 50-424/97-10 & 50-425/97-10 on 970921-1101. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000424/19970091997-10-20020 October 1997 Insp Repts 50-424/97-09 & 50-425/97-09 on 970803-0920. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support & Security & Safeguards Procedures & Documentation ML20210S0601997-08-28028 August 1997 Insp Repts 50-424/97-07 & 50-425/97-07 on 970706-0802. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20210N6731997-08-14014 August 1997 Insp Repts 50-424/97-08 & 50-425/97-08 on 970623-27. Deviations Noted.Major Areas Inspected:Qa in Operations, Maint,Engineering & Health Physics ML20198F8631997-08-0404 August 1997 Insp Repts 50-424/97-06 & 50-425/97-06 on 970601-0705. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20141F7031997-06-24024 June 1997 Insp Repts 50-424/97-05 & 50-425/97-05 on 970427-0531. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Scenario for off-hour Emergency Response Drill ML20140B4071997-05-21021 May 1997 Insp Repts 50-424/97-04 & 50-425/97-04 on 970316-0426. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support & Emergency Preparedness Area ML20137X3811997-04-14014 April 1997 Integrated Insp Repts 50-424/97-01 & 50-425/97-01 on 970202- 0315.Violations Noted.Major Areas Inspected:Operations, Maint,Engineering & Plant Support ML20137T7111997-04-0404 April 1997 Insp Repts 50-424/97-03 & 50-425/97-03 on 970303-07. Violations Noted.Major Areas Inspected:Fitness for Duty & Physical Security Program for Power Reactors ML20137U6741997-03-27027 March 1997 Insp Repts 50-424/97-02 & 50-425/97-02 on 970210-0307.No Violations Noted.Major Areas Inspected:Plant Support,Solid Radwaste,Radioactive Liquid & Gaseous Waste & Radioactive Matl Transportation Programs ML20135C8511997-02-24024 February 1997 Insp Repts 50-424/96-14 & 50-425/96-14 on 961222-970201. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maintenance & Plant Support ML20134H1601997-01-17017 January 1997 Insp Repts 50-424/96-12 & 50-425/96-12 on 961110-1221. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19960131997-01-0606 January 1997 Insp Repts 50-424/96-13 & 50-425/96-13 on 961118-22. Weakness Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise ML20149M5401996-12-0505 December 1996 Insp Repts 50-424/96-11 & 50-425/96-11 on 960929-1109. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20134F0141996-10-28028 October 1996 Insp Repts 50-424/96-10 & 50-425/96-10 on 960818-0928. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19960091996-09-16016 September 1996 Insp Repts 50-424/96-09 & 50-425/96-09 on 960707-0817. Violations Noted.Major Areas Inspected:Engineering,Maint & Plant Support IR 05000424/19930271994-01-11011 January 1994 Insp Repts 50-424/93-27 & 50-425/93-27 on 931121-1218.One Noncited Violation Identified.Major Areas Inspected:Plant Operations,Surveillance,Maint,Engineered Safety Sys Walkdown & Evaluation of Licensee self-assessment IR 05000424/19930181993-12-22022 December 1993 Insp Repts 50-424/93-18 & 50-425/93-18 on 931129-1203. Violations Noted.Major Areas Inspected:Licensed Operator Requalification Training ML20059B5951993-12-13013 December 1993 Insp Repts 50-424/93-26 & 50-425/93-26 on 931024-1120. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maintenance,Fire Protection & Followup of Open Items ML20058J2441993-11-17017 November 1993 Insp Repts 50-424/93-23 & 50-425/93-23 on 930919-1023. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Complex Surveillance,Maintenance,Mid Loop Reduced Inventory Activities & Modifications IR 05000424/19930241993-10-27027 October 1993 Insp Repts 50-424/93-24 & 50-425/93-24 on 931004-08.No Violations Noted.Major Areas Inspected:Unit 2 Isi,Review of Radiographic Film & EC ET Exam of SG Tubes IR 05000424/19930221993-10-15015 October 1993 Insp Repts 50-424/93-22 & 50-425/93-22 on 930920-24.No Violations Noted.Major Areas Inspected:Occupational Radiation Safety,Training & Qualification,Exposure Control & Maintaining Exposures ALARA IR 05000424/19930211993-10-0707 October 1993 Insp Repts 50-424/93-21 & 50-425/93-21 on 930822-0918.No Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint,Esf Sys Walkdown,Installation & Testing of Mods & Followup of Open Items ML20057E7961993-09-30030 September 1993 Insp Repts 50-424/93-20 & 50-425/93-20 on 930830-0903. Violations Noted.Major Areas Inspected:Radiation Protection Program Activities Associated W/Llrw Processing,Temporary Storage,Transportation & Offsite Dose Assessment IR 05000424/19930171993-09-0707 September 1993 Insp Repts 50-424/93-17 & 50-425/93-17 on 930801-21.Noncited Violation Noted.Major Areas Inspected:Plant Operations, Surveillance,Maintenance,Evaluation of Licensee self-assessment & Employee Concerns Program ML20056G8491993-08-23023 August 1993 Insp Repts 50-424/93-16 & 50-425/93-16 on Stated Date. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint & Fire Protection IR 05000424/19930191993-08-21021 August 1993 Insp Repts 50-424/93-19 & 50-425/93-19 on 930802-06.No Violations or Deviations Noted.Major Areas Inspected: Observation & Evaluation of Annual Emergency Preparedness Exercise IR 05000424/19930141993-07-14014 July 1993 Insp Repts 50-424/93-14 & 50-425/93-14 on 930530-0626. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint & Followup of Open Items IR 05000424/19930031993-03-17017 March 1993 Insp Repts 50-424/93-03 & 50-425/93-03.Noncited Violation Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint & Refueling Activities IR 05000424/19920311993-01-26026 January 1993 Insp Repts 50-424/92-31 & 50-425/92-31 on 921129-930102. Noncited Violation Noted.Major Areas Inspected:Plant Operations,Surveillance,Maint,Review of SNM Accountability Program & Review of LERs & Followup IR 05000424/19920281993-01-0505 January 1993 Insp Repts 50-424/92-28 & 50-425/92-28 on 921130-1204. Violations Noted.Major Areas Inspected:Rp Program Activities Associated W/Llrw Processing,Temporary Storage & Transportation,Liquid & Gaseous Effluent Monitor 1999-08-16
[Table view] Category:INSPECTION REPORT
MONTHYEARIR 05000424/19990061999-10-0101 October 1999 Insp Repts 50-424/99-06 & 50-425/99-06 on 990725-0904. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19990051999-08-16016 August 1999 Insp Repts 50-424/99-05 & 50-425/99-05 on 990620-0724.No Violations Noted.Major Areas Inspected:Opertions, Engineering,Maintenance & Plant Support.Results of Announced Insp by Security Inspector Also Encl IR 05000424/19990041999-07-15015 July 1999 Insp Repts 50-424/99-04 & 50-425/99-04 on 990502-0619. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000424/19990031999-05-19019 May 1999 Insp Repts 50-424/99-03 & 50-425/99-03 on 990321-0501. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000424/19990021999-04-15015 April 1999 Insp Repts 50-424/99-02 & 50-425/99-02 on 990214-0320. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000424/19990011999-03-0808 March 1999 Partially Withheld Insp Repts 50-424/99-01 & 50-425/99-01 on 990125-27 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Area of Plant Support by Regional Safeguards Inspector & Select Personnel from NRR IR 05000424/19980101999-03-0303 March 1999 Insp Repts 50-424/98-10 & 50-425/98-10 on 981227-990213.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support.Rept Covers 7-wk Period of Insp & Insps in Area of Health Physica & EP IR 05000424/19980091999-01-20020 January 1999 Insp Repts 50-424/98-09 & 50-425/98-09 on 981115-1226.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19980081998-12-11011 December 1998 Insp Repts 50-424/98-08 & 50-425/98-08 on 980927-1114.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19980121998-11-0909 November 1998 Partially Withheld Insp Repts 50-424/98-12 & 50-425/98-12 on 981005-09 (Ref 10CFR73.21)Major Areas Inspected:Physical Security Program for Power Reactors IR 05000424/19980071998-10-15015 October 1998 Insp Repts 50-424/98-07 & 50-425/98-07 on 980816-0926. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support.Insp Also Addressed 980904 Reactor Trip IR 05000424/19980061998-09-10010 September 1998 Insp Repts 50-424/98-06 & 50-425/98-06 on 980628-0815.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support IR 05000424/19980111998-07-31031 July 1998 Insp Repts 50-424/98-11 & 50-425/98-11 on 980622-26.No Violations Noted.Major Areas Inspected:Announced Insp Was Observation & Evaluation of Biennial Emergency Preparedness Exercise for Plant IR 05000424/19980051998-07-23023 July 1998 Insp Repts 50-424/98-05 & 50-425/98-05 on 980517-0627. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20236H4081998-06-15015 June 1998 Insp Repts 50-424/98-04 & 50-425/98-04 on 980419-0516. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19980031998-05-15015 May 1998 Insp Repts 50-424/98-03 & 50-425/98-03 on 980308-0418. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19980021998-04-0202 April 1998 Insp Repts 50-424/98-02 & 50-425/98-02 on 980125-0307. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering IR 05000424/19970121998-02-23023 February 1998 Insp Repts 50-424/97-12 & 50-425/97-12 on 971214-980124.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20198M6861998-01-12012 January 1998 Insp Repts 50-424/97-11 & 50-425/97-11 on 971102-1213. Violations Noted.Major Areas Inspected:Operations & Maint IR 05000424/19970101997-11-26026 November 1997 Insp Repts 50-424/97-10 & 50-425/97-10 on 970921-1101. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000424/19970091997-10-20020 October 1997 Insp Repts 50-424/97-09 & 50-425/97-09 on 970803-0920. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support & Security & Safeguards Procedures & Documentation ML20210S0601997-08-28028 August 1997 Insp Repts 50-424/97-07 & 50-425/97-07 on 970706-0802. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20210N6731997-08-14014 August 1997 Insp Repts 50-424/97-08 & 50-425/97-08 on 970623-27. Deviations Noted.Major Areas Inspected:Qa in Operations, Maint,Engineering & Health Physics ML20198F8631997-08-0404 August 1997 Insp Repts 50-424/97-06 & 50-425/97-06 on 970601-0705. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20141F7031997-06-24024 June 1997 Insp Repts 50-424/97-05 & 50-425/97-05 on 970427-0531. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Scenario for off-hour Emergency Response Drill ML20140B4071997-05-21021 May 1997 Insp Repts 50-424/97-04 & 50-425/97-04 on 970316-0426. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support & Emergency Preparedness Area ML20137X3811997-04-14014 April 1997 Integrated Insp Repts 50-424/97-01 & 50-425/97-01 on 970202- 0315.Violations Noted.Major Areas Inspected:Operations, Maint,Engineering & Plant Support ML20137T7111997-04-0404 April 1997 Insp Repts 50-424/97-03 & 50-425/97-03 on 970303-07. Violations Noted.Major Areas Inspected:Fitness for Duty & Physical Security Program for Power Reactors ML20137U6741997-03-27027 March 1997 Insp Repts 50-424/97-02 & 50-425/97-02 on 970210-0307.No Violations Noted.Major Areas Inspected:Plant Support,Solid Radwaste,Radioactive Liquid & Gaseous Waste & Radioactive Matl Transportation Programs ML20135C8511997-02-24024 February 1997 Insp Repts 50-424/96-14 & 50-425/96-14 on 961222-970201. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maintenance & Plant Support ML20134H1601997-01-17017 January 1997 Insp Repts 50-424/96-12 & 50-425/96-12 on 961110-1221. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19960131997-01-0606 January 1997 Insp Repts 50-424/96-13 & 50-425/96-13 on 961118-22. Weakness Noted.Major Areas Inspected:Observation & Evaluation of Biennial Emergency Preparedness Exercise ML20149M5401996-12-0505 December 1996 Insp Repts 50-424/96-11 & 50-425/96-11 on 960929-1109. Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support ML20134F0141996-10-28028 October 1996 Insp Repts 50-424/96-10 & 50-425/96-10 on 960818-0928. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19960091996-09-16016 September 1996 Insp Repts 50-424/96-09 & 50-425/96-09 on 960707-0817. Violations Noted.Major Areas Inspected:Engineering,Maint & Plant Support IR 05000424/19930271994-01-11011 January 1994 Insp Repts 50-424/93-27 & 50-425/93-27 on 931121-1218.One Noncited Violation Identified.Major Areas Inspected:Plant Operations,Surveillance,Maint,Engineered Safety Sys Walkdown & Evaluation of Licensee self-assessment IR 05000424/19930181993-12-22022 December 1993 Insp Repts 50-424/93-18 & 50-425/93-18 on 931129-1203. Violations Noted.Major Areas Inspected:Licensed Operator Requalification Training ML20059B5951993-12-13013 December 1993 Insp Repts 50-424/93-26 & 50-425/93-26 on 931024-1120. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maintenance,Fire Protection & Followup of Open Items ML20058J2441993-11-17017 November 1993 Insp Repts 50-424/93-23 & 50-425/93-23 on 930919-1023. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Complex Surveillance,Maintenance,Mid Loop Reduced Inventory Activities & Modifications IR 05000424/19930241993-10-27027 October 1993 Insp Repts 50-424/93-24 & 50-425/93-24 on 931004-08.No Violations Noted.Major Areas Inspected:Unit 2 Isi,Review of Radiographic Film & EC ET Exam of SG Tubes IR 05000424/19930221993-10-15015 October 1993 Insp Repts 50-424/93-22 & 50-425/93-22 on 930920-24.No Violations Noted.Major Areas Inspected:Occupational Radiation Safety,Training & Qualification,Exposure Control & Maintaining Exposures ALARA IR 05000424/19930211993-10-0707 October 1993 Insp Repts 50-424/93-21 & 50-425/93-21 on 930822-0918.No Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint,Esf Sys Walkdown,Installation & Testing of Mods & Followup of Open Items ML20057E7961993-09-30030 September 1993 Insp Repts 50-424/93-20 & 50-425/93-20 on 930830-0903. Violations Noted.Major Areas Inspected:Radiation Protection Program Activities Associated W/Llrw Processing,Temporary Storage,Transportation & Offsite Dose Assessment IR 05000424/19930171993-09-0707 September 1993 Insp Repts 50-424/93-17 & 50-425/93-17 on 930801-21.Noncited Violation Noted.Major Areas Inspected:Plant Operations, Surveillance,Maintenance,Evaluation of Licensee self-assessment & Employee Concerns Program ML20056G8491993-08-23023 August 1993 Insp Repts 50-424/93-16 & 50-425/93-16 on Stated Date. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint & Fire Protection IR 05000424/19930191993-08-21021 August 1993 Insp Repts 50-424/93-19 & 50-425/93-19 on 930802-06.No Violations or Deviations Noted.Major Areas Inspected: Observation & Evaluation of Annual Emergency Preparedness Exercise IR 05000424/19930141993-07-14014 July 1993 Insp Repts 50-424/93-14 & 50-425/93-14 on 930530-0626. Violations Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint & Followup of Open Items IR 05000424/19930031993-03-17017 March 1993 Insp Repts 50-424/93-03 & 50-425/93-03.Noncited Violation Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint & Refueling Activities IR 05000424/19920311993-01-26026 January 1993 Insp Repts 50-424/92-31 & 50-425/92-31 on 921129-930102. Noncited Violation Noted.Major Areas Inspected:Plant Operations,Surveillance,Maint,Review of SNM Accountability Program & Review of LERs & Followup IR 05000424/19920281993-01-0505 January 1993 Insp Repts 50-424/92-28 & 50-425/92-28 on 921130-1204. Violations Noted.Major Areas Inspected:Rp Program Activities Associated W/Llrw Processing,Temporary Storage & Transportation,Liquid & Gaseous Effluent Monitor 1999-08-16
[Table view] Category:UTILITY
MONTHYEARML20058E8901990-10-25025 October 1990 Insp Repts 50-424/90-27 & 50-425/90-27 on 901016-17. Violations Confirmed.Major Areas Inspected:Physical Protection of Safeguards Info in Response to licensee- Identified & Reported Safeguards Event IR 05000424/19900201990-10-25025 October 1990 Insp Repts 50-424/90-20 & 50-425/90-20 on 900825-0928. Violation Noted.Major Areas Inspected:Plant Operations, Surveillance,Maint,Refueling Operations,Review of LERs & Followup on Previous Insp Findings IR 05000424/19900261990-10-17017 October 1990 Insp Repts 50-424/90-26 & 50-425/90-26 on 901009-12. Noncited Violation Noted.Major Areas Inspected:Inservice Insp (ISI) & ISI Implementing Procedures IR 05000424/19900171990-09-18018 September 1990 Insp Repts 50-424/90-17 & 50-425/90-17 on 900630-0824.No Specific Strengths or Weaknesses Identified.Major Areas Inspected:Plant Operations,Radiological Controls,Maint, Surveillance,Security & Quality Programs IR 05000424/19900151990-08-29029 August 1990 Insp Repts 50-424/90-15 & 50-425/90-15 on 900727-0803. Violations Noted.Major Areas Inspected:Observation & Evaluation of Annual Emergency Response Exercise IR 05000424/19900161990-07-26026 July 1990 Insp Repts 50-424/90-16 & 50-425/90-16 on 900709-13.No Violations Noted.Major Areas Inspected:Radiolgical Emergency Response Plan & Implementing Procedures,Emergency Facilities,Equipment,Instrumentation & Supplies IR 05000424/19900131990-07-18018 July 1990 Insp Repts 50-424/90-13 & 50-425/90-13 on 900519-0629. Violations Noted But Not Cited.Major Areas Inspected:Plant Operations,Radiological Controls,Maint,Surveillance,Quality Programs,Security & Administrative Controls IR 05000424/19900141990-07-0202 July 1990 Insp Repts 50-424/90-14 & 50-425/90-14 on 900611-15.No Violations or Deviations Noted.Major Areas Inspected: Radiological Effluents,Environ Monitoring,Plant Chemistry & post-accident Sampling Sys ML20058G4491990-06-13013 June 1990 Insp Repts 50-424/90-10 & 50-425/90-10 on 900331-0518. Violations Noted.Major Areas Inspected:Plant Operations, Radiological Controls,Maint,Surveillance,Security,Quality Programs & Administrative Controls Affecting Quality IR 05000424/19890231989-09-12012 September 1989 Partially Withheld Insp Repts 50-424/89-23 & 50-425/89-27 on 890731-0803 (Ref 10CFR2.790(d) & 73.21).Violation Noted. Major Areas Inspected:Mgt Support,Security Program Plans & Procedures,Protected & Vital Area Barriers & Testing IR 05000424/19890211989-08-0404 August 1989 Insp Repts 50-424/89-21 & 50-425/89-25 on 890725-27.No Violations or Deviations Noted.Major Areas Inspected:Annual Emergency Exercise,Including Selected Portions of Staffing & Response of Emergency Organization Personnel in Simulator ML20248C8591989-07-31031 July 1989 Insp Repts 50-424/89-19 & 50-425/89-23 on 890609-0707.Four Violations Noted.Major Areas Inspected:Plant Operations, Radiological Controls,Maint,Surveillance,Security & Quality Programs & Administrative Controls Affecting Quality IR 05000424/19890201989-07-21021 July 1989 Insp Repts 50-424/89-20 & 50-425/89-24 on 890626-30. Violation Noted.Major Areas Inspected:Design,Design Changes & Plant Mod IR 05000424/19890181989-07-12012 July 1989 Insp Repts 50-424/89-18 & 50-425/89-21 on 890612-16.No Cited Violations Noted.Major Areas Inspected:Emergency Preparedness Program to Determine If Program Maintained in State of Operational Readiness IR 05000424/19890151989-06-30030 June 1989 Insp Repts 50-424/89-15 & 50-425/89-17 on 890522-26.No Violations Noted.Major Areas Inspected:Occupational Exposure,Shipping & Transportation & Radiation Protection Startup.Weakness Noted in Quality of Audit Program IR 05000425/19890221989-06-25025 June 1989 Insp Rept 50-425/89-22 on 890612-16.No Violations Noted. Major Areas Inspected:Review of Completed Startup Tests & Closeout of Startup Test Insp Program IR 05000424/19890161989-06-21021 June 1989 Insp Repts 50-424/89-16 & 50-425/89-18 on 890506-0608. Violations Noted.Major Areas Inspected:Plant Operations, Startup (Unit 2),radiological Controls,Maint,Surveillance, Security & Quality Programs & Administrative Controls ML20245F4231989-06-15015 June 1989 Insp Repts 50-424/89-14 & 50-425/89-15 on 890318-0505. Violations Noted.Major Areas Inspected:Plant Operations, Radiological Controls/Chemistry,Maint,Surveillance & Security & Administrative Controls Affecting Quality ML20245D8671989-06-14014 June 1989 Insp Rept 50-425/89-20 on 890516-20.No Violations or Deviations Noted.Major Areas Inspected:Response to Loss of Transient on 890514,review of Completed Startup Tests & Witnessing of 100% Loss of Load Test ML20245H8361989-06-0909 June 1989 Partially Withheld Insp Repts 50-424/89-17 & 50-425/89-19 on 890515-19 (Ref 10CFR2.790(d) & 73.21).Violations Noted Re Access Controls.Major Areas Inspected:Mgt Support,Security Program Plans & Audits & Vital Area Access Controls IR 05000425/19890161989-05-0404 May 1989 Insp Rept 50-425/89-16 on 890327-31 & 0410-13.No Violations or Deviations Noted.Major Areas Addressed:Review of Completed,Precritical Tests,Witnessing of Initial Criticality & of Shutdown from Outside Control Test Room IR 05000424/19890131989-04-24024 April 1989 Insp Rept 50-424/89-13 on 880808-0912.Violations Noted.Major Areas Inspected:Review of 11 Inspector Followup Items & Program Weaknesses Identified in Operational Performance Assessment IR 05000424/19890121989-04-19019 April 1989 Insp Repts 50-424/89-12 & 50-425/89-14 on 890313-17.No Violations or Deviations Noted.Major Areas Inspected:Snubber Surveillance Program,Unit 2 Containment Structural Integrity Test Program & Piping Vibration Testing Program IR 05000424/19890101989-04-11011 April 1989 Insp Repts 50-424/89-10 & 50-425/89-12 on 890218-0317. Violations Noted.Major Areas Inspected:Plant Operations, Radiological Controls,Maint,Surveillance,Security & QA Programs & Administrative Controls Affecting Quality IR 05000424/19890111989-04-10010 April 1989 Insp Rept 50-424/89-11 & 50-425/89-13 on 890307-10 & 29-31. No Violations or Deviations Noted.Major Areas Inspected: Proposed Startup Tests for Unit 2 & Followup of Previous Violation on Unit 1 IR 05000424/19890081989-04-0707 April 1989 Insp Repts 50-424/89-08 & 50-425/89-11 on 890204-10.No Violations Noted.Major Areas Inspected:Nrc Bulletin Followup,Diesel Generator Fuel Oil,Containment Isolation Sys Testing & Followup Actions on Previous Insp Findings IR 05000424/19890071989-03-14014 March 1989 Insp Repts 50-424/89-07 & 50-425/89-10 on 890121-0217. Licensee Identified Violations Noted.Major Areas Inspected: Plant Operations,Radiological Controls,Maint,Surveillance, Security & Initial Fuel Load IR 05000424/19890091989-03-10010 March 1989 Partially Withheld Insp Rept 50-424/89-09 on 890202-03 (Ref 10CFR2.790(d) & 73.21).Violations Noted:Badges of Terminated Employees Not Removed from Badge Issue Area.Major Areas Inspected:Badge Access Areas IR 05000321/19880371989-03-0909 March 1989 Partially Withheld Insp Repts 50-321/88-37,50-366/88-37 & 50-424/88-53 on 881102-890106 (Ref 10CFR2.790(d) & 73.21). Violations Noted.Major Areas Inspected:Physical Security Operational Activities & Safeguards Matl Handling IR 05000424/19890021989-03-0202 March 1989 Insp Repts 50-424/89-02 & 50-425/89-02 on 890208-14.No Violations or Deviations Noted.Major Areas Inspected: Witnessing Initial Fuel Load of Unit 2 & Review of Proposed Startup Tests for Unit 2 IR 05000425/19890081989-02-28028 February 1989 Insp Rept 50-425/89-08 on 890123-27.No Violations or Deviations Noted.Major Areas Inspected:Preoperational Testing,Preoperational Test Results Evaluation & Followup on NRC Bulletins 88-004 & 81-02 ML20247C0031989-02-23023 February 1989 Insp Repts 50-424/89-03 & 50-425/89-03 on 890109-13. Violations Noted.Major Areas Inspected:Licensee Action on Previous Insp Findings,Licensee Identified 10CFR50.55 Items & NRC Bulletin 80-08 (Unit 2) IR 05000425/19890091989-02-21021 February 1989 Insp Rept 50-425/89-09 on 890123-27.No Violations or Deviations Noted.Major Areas Inspected:Qa Coverage for Startup Testing & Licensee Action on Previously Identified Items IR 05000424/19890051989-02-21021 February 1989 Insp Repts 50-424/89-05 & 50-425/89-06 on 890123-27.No Violations or Deviations Noted.Major Areas Inspected: Confirmatory Radiological Measurements for Units & Preoperational Sys Tests for Unit 2 IR 05000425/19880781989-02-16016 February 1989 Insp Rept 50-425/88-78 on 881219-22.No Violations Noted. Major Areas Inspected:Preservice Insp Program & Procedure Review,Housekeeping,Matls Identification & Control & Action on Previous Insp Findings IR 05000425/19890041989-02-15015 February 1989 Insp Rept 50-425/89-04 on 880109-12.No Violations or Deviations Noted.Major Areas Inspected:Fire Prevention & Protection & Review of Previously Identified NRC Open Items ML20235L1921989-02-10010 February 1989 Insp Repts 50-424/88-61 & 50-425/88-79 on 881217-890120. Violations Noted.Major Areas Inspected:Plant Operations, Radiological Controls,Maint,Surveillance,Fire Protection, Security,Preoperation Testing & Quality Programs ML20235L6991989-02-0707 February 1989 Insp Repts 50-424/89-01 & 50-425/89-01 on 890117-19.No Violations or Deviations Noted.Major Areas Inspected:Util Response to Improvement & Incomplete Items Identified in Unit 2 Emergency Preparedness Implementation Appraisal IR 05000424/19880551989-02-0202 February 1989 Insp Repts 50-424/88-55 & 50-425/88-71 on 881212-16 & 890103-06.No Violations or Deviations Noted.Major Areas Inspected:Liquid & Gaseous Radwaste Treatment Sys & Effluent Monitoring Sampling Sys & Environ Radiological Monitoring IR 05000425/19880651988-11-30030 November 1988 Insp Rept 50-425/88-65 on 881024-28.No Violations or Deviations Noted.Major Areas Inspected:Containment Local Leak Rate Preoperational Test Program Review & Reactor Protection Sys Preoperational Test Procedure Review IR 05000424/19880441988-11-28028 November 1988 Insp Rept 50-424/88-44 on 881001-28.Violations Noted.Major Areas Inspected:Plant Operations,Radiological Controls, Maint,Surveillance,Fire Protection,Security,Outage,Quality Programs & Administrative Controls Affecting Quality ML20196E0821988-11-25025 November 1988 Insp Repts 50-424/88-46 & 50-425/88-61 on 881017-21.No Violations Noted.Major Areas Inspected:Radiological Effluents & Plant Chemistry IR 05000425/19880671988-11-23023 November 1988 Insp Rept 50-425/88-67 on 881031-1103.No Violations or Deviations Noted.Major Areas Inspected:Closeout of Readiness Review Modules 6,12,17/19 & 20 Findings IR 05000424/19880491988-11-22022 November 1988 Insp Repts 50-424/88-49 & 50-425/88-59 on 881017-20.No Violations or Deviations Noted.Major Areas Inspected:Fire Protection & Licensee Actions Re Implementation of Plant Safe Shutdown Guidance Provided in SRP 9.5-1 IR 05000425/19880571988-11-17017 November 1988 Insp Rept 50-425/88-57 on 881003-07 & 11-14.No Violations or Deviations Noted.Major Areas Inspected:Preoperational & Hot Functional Test Witnessing,Preoperational Test Procedure Review & Licensee Action on Previous Insp Findings IR 05000424/19880381988-11-16016 November 1988 Insp Repts 50-424/88-38 & 50-425/88-42 on 880815-19. Violations Noted.Major Areas Inspected:Site & Corporate Emergency Preparedness Programs & Identification of Programmatic Differences &/Or Changes Specific to Unit 2 IR 05000425/19880581988-11-16016 November 1988 Partially Withheld Insp Rept 50-425/88-58 on 881024-27 (Ref 10CFR2.790 & 73.21).No Violations Noted.Major Areas Inspected:Physical Security Plan & Implementing Procedures, Security Organization,Testing & Maint & Physical Barriers IR 05000424/19880451988-11-15015 November 1988 Insp Rept 50-424/88-45 on 881017-21.No Violations or Deviations Noted.Major Areas Inspected:Inservice Insp, Including Review of Inservice Insp Program,Plan for Outage & Review of NDE Procedures IR 05000425/19880561988-11-15015 November 1988 Insp Rept 50-425/88-56 on 880913-1031.No Violations or Deviations Noted.Major Areas Inspected:Fire Protection, Piping Sys & supports,safety-related Components,Auxiliary Sys,Electrical Equipment,Raceways & Instrumentation IR 05000425/19880491988-10-13013 October 1988 Insp Rept 50-425/88-49 on 880822-0901.Violations Noted.Major Areas inspected:1 of 11 Readiness Review Modules as Part of Pilot Readiness Review Program Per Recommendations in NUREG-1055 1990-09-18
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARIR 05000424/19990061999-10-0101 October 1999 Insp Repts 50-424/99-06 & 50-425/99-06 on 990725-0904. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19990051999-08-16016 August 1999 Insp Repts 50-424/99-05 & 50-425/99-05 on 990620-0724.No Violations Noted.Major Areas Inspected:Opertions, Engineering,Maintenance & Plant Support.Results of Announced Insp by Security Inspector Also Encl IR 05000424/19990041999-07-15015 July 1999 Insp Repts 50-424/99-04 & 50-425/99-04 on 990502-0619. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000424/19990031999-05-19019 May 1999 Insp Repts 50-424/99-03 & 50-425/99-03 on 990321-0501. Non-cited Violations Noted.Major Areas Inspected:Operations, Engineering,Maintenance & Plant Support IR 05000424/19990021999-04-15015 April 1999 Insp Repts 50-424/99-02 & 50-425/99-02 on 990214-0320. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support ML20207L8511999-03-0808 March 1999 Notice of Violation from Insp on 990125-27.Violation Noted: on Numerous Occasions from Mar 1997 to Oct 1998,select Response Force Officers Were Posted in Locations That Would Not Permit Them to Interpose Themselves Between Intruder IR 05000424/19990011999-03-0808 March 1999 Partially Withheld Insp Repts 50-424/99-01 & 50-425/99-01 on 990125-27 (Ref 10CFR73.21).Violations Noted.Major Areas Inspected:Area of Plant Support by Regional Safeguards Inspector & Select Personnel from NRR IR 05000424/19980101999-03-0303 March 1999 Insp Repts 50-424/98-10 & 50-425/98-10 on 981227-990213.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support.Rept Covers 7-wk Period of Insp & Insps in Area of Health Physica & EP IR 05000424/19980091999-01-20020 January 1999 Insp Repts 50-424/98-09 & 50-425/98-09 on 981115-1226.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19980081998-12-11011 December 1998 Insp Repts 50-424/98-08 & 50-425/98-08 on 980927-1114.No Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support IR 05000424/19980121998-11-0909 November 1998 Partially Withheld Insp Repts 50-424/98-12 & 50-425/98-12 on 981005-09 (Ref 10CFR73.21)Major Areas Inspected:Physical Security Program for Power Reactors ML20155A7621998-10-15015 October 1998 Notice of Violation from Insp on 980816-0926.Violation Noted:On 980824,licensee Failed to Adequately Establish Sufficient Procedural Control for Demolition of Concrete Missile Barrier IR 05000424/19980071998-10-15015 October 1998 Insp Repts 50-424/98-07 & 50-425/98-07 on 980816-0926. Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support.Insp Also Addressed 980904 Reactor Trip IR 05000424/19980061998-09-10010 September 1998 Insp Repts 50-424/98-06 & 50-425/98-06 on 980628-0815.No Violations Noted.Major Areas Inspected:Aspects of Licensee Operations,Engineering,Maint & Plant Support ML20154C5131998-09-10010 September 1998 Notice of Violation from Insp on 980628-0815.Violation Noted:Corrective Actions Taken in Response to Violations Associated with Entry Into TS LCO for Maint & Surveillances Activities Were Inadequate to Preclude Repetition IR 05000424/19980111998-07-31031 July 1998 Insp Repts 50-424/98-11 & 50-425/98-11 on 980622-26.No Violations Noted.Major Areas Inspected:Announced Insp Was Observation & Evaluation of Biennial Emergency Preparedness Exercise for Plant ML20236T5871998-07-23023 July 1998 Notice of Violation from Insp on 980517-0627.Violation Noted:On 980419,Unit 2 Entered Mode 2 W/O Meeting LCO of TS 3.3.2,which Requires Two Trains of Turbine Trip Function to Be Operable Prior to Entering Mode 2 IR 05000424/19980051998-07-23023 July 1998 Insp Repts 50-424/98-05 & 50-425/98-05 on 980517-0627. Violation Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19983021998-07-21021 July 1998 NRC Operator Licensing Exam Repts 50-424/98-302 & 50-425/98-302 for Tests Administered on 980721 ML20236H3971998-06-15015 June 1998 Notice of Violations from Insp on 980419-0516.Violations Noted:On 980415,upon Identification That 1 of 3 Letdown Orifice Isolation Valves Would Not Open,Unit 2 Uss Proceeded to Allow Operation of Unit in Water Solid Conditions ML20236H4081998-06-15015 June 1998 Insp Repts 50-424/98-04 & 50-425/98-04 on 980419-0516. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support PNO-II-98-032, on 980609,electrical Fault on 2C Condensate Pump Motor Caused Loss of 1NAB 13.8KV Bus.Fault Also Caused Main Generator Trip,Turbine Trip & Reactor Trip.Reactor Coolant Pump 2 & 4 Lost Power Because of Bus Loss1998-06-10010 June 1998 PNO-II-98-032:on 980609,electrical Fault on 2C Condensate Pump Motor Caused Loss of 1NAB 13.8KV Bus.Fault Also Caused Main Generator Trip,Turbine Trip & Reactor Trip.Reactor Coolant Pump 2 & 4 Lost Power Because of Bus Loss ML20247K7531998-05-15015 May 1998 Notice of Violation from Insp on 980308-0418.Violation Noted:On 980401,Procedure PT-V-605,was Not Properly Implemented,In That,Liquid Penetrant pre-exam Cleaning for Safety Injection Sys Weld 21204-122-6 Was Inadequate IR 05000424/19980031998-05-15015 May 1998 Insp Repts 50-424/98-03 & 50-425/98-03 on 980308-0418. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support IR 05000424/19983011998-05-0707 May 1998 NRC Operator Licensing Exam Repts 50-424/98-301 & 50-425/98-301 on 980413-15.Exams Results:All Candidates Passed Tests Except for One SRO ML20216J6611998-04-0202 April 1998 Notice of Violation from Insp on 980125-0307.Violation Noted:On 980219,Unit 2 Shift Supervisor Authorized Maint on Control Room Emergency Filtration Sys Train B W/O Recognizing Work Would Render Train Inoperable IR 05000424/19980021998-04-0202 April 1998 Insp Repts 50-424/98-02 & 50-425/98-02 on 980125-0307. Violations Noted.Major Areas Inspected:Operations,Maint & Engineering PNO-II-98-017, on 980320,female Contract Worker Found Unconscious at Bottom of man-lift Station in Turbine Bldg. Plant First Aid Team Responded & Ambulance Was Called. Injured Person Transported to Hosp & Pronounced Dead1998-03-20020 March 1998 PNO-II-98-017:on 980320,female Contract Worker Found Unconscious at Bottom of man-lift Station in Turbine Bldg. Plant First Aid Team Responded & Ambulance Was Called. Injured Person Transported to Hosp & Pronounced Dead IR 05000424/19970121998-02-23023 February 1998 Insp Repts 50-424/97-12 & 50-425/97-12 on 971214-980124.No Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20198M3681998-01-12012 January 1998 Notice of Deviation from Insp on 971102-1213.Deviation Noted:Since Initial Startup of Both Units 1 & 2,licensee Failed to Perform 18-month Surveillance Testing on Reactor Coolant Pump 125V Direct Current non-1E Control Breakers ML20198M6861998-01-12012 January 1998 Insp Repts 50-424/97-11 & 50-425/97-11 on 971102-1213. Violations Noted.Major Areas Inspected:Operations & Maint ML20198M3401998-01-12012 January 1998 Notice of Violation from Insp on 971102-1213.Violation Noted:Since Initial Startup of Both Units 1 & 2,procedures 14420-1/2 & 14421-1/2 Inadequate ML20202E1971997-11-26026 November 1997 Notice of Violation from Insp on 970921-1101.Violation Noted:On 971003,10 Unit Heater Breakers on MCC 1NBG Were Found Open & Not Tagged IR 05000424/19970101997-11-26026 November 1997 Insp Repts 50-424/97-10 & 50-425/97-10 on 970921-1101. Violations Noted.Major Areas Inspected:Operations, Engineering,Maint & Plant Support IR 05000424/19970091997-10-20020 October 1997 Insp Repts 50-424/97-09 & 50-425/97-09 on 970803-0920. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering,Plant Support & Security & Safeguards Procedures & Documentation ML20212F3471997-10-20020 October 1997 Notice of Violation from Insp on 970803-0920.Violations noted:54 Fire Extinguishers W/Insp Sticker ,were Issued Between 970730 & 0815 & Did Not Meet Insp Criteria of Procedure 92020-C ML20211F2501997-09-15015 September 1997 SALP Repts 50-424/97-99 & 50-425/97-99 for Vogtle Electric Generating Plant for 960128-970802 ML20210S0601997-08-28028 August 1997 Insp Repts 50-424/97-07 & 50-425/97-07 on 970706-0802. Violations Noted.Major Areas Inspected:Licensee Operations, Engineering,Maint & Plant Support ML20210S0551997-08-28028 August 1997 Notice of Violation from Insp on 970706-0802.Violation Noted:On 970708,during Maint on Shaft Seal in Unit 1 Personnel Airlock,Licensee Failed to Document Entry Into Appropriate Action Condition for TS LCO 3.6.2 ML20210N6731997-08-14014 August 1997 Insp Repts 50-424/97-08 & 50-425/97-08 on 970623-27. Deviations Noted.Major Areas Inspected:Qa in Operations, Maint,Engineering & Health Physics ML20210N6521997-08-14014 August 1997 Notice of Deviation from Insp on 970623-27.Deviation Noted: Incidents or Events Associated W/Ufsar Section 17.2.1.1.1.F & H Were Not Reviewed on 961218 & 970430 Srb Meetings ML20198F8631997-08-0404 August 1997 Insp Repts 50-424/97-06 & 50-425/97-06 on 970601-0705. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support ML20198F8551997-08-0404 August 1997 Notice of Violation from Insp on 970601-0705.Violation Noted:Six Individuals Reported for Duty to ERFs & Failed to Complete sign-in Sheets on 970527,during Performance of Recall Emergency Drill ML20141F6971997-06-24024 June 1997 Notice of Violation from Insp on 970427-0531.Violation Noted:Time Between Performances of Procedure 29100-C,for Visual Insp of Fire Extinguishers & Fire Hose Stations, Exceeded 31 Days ML20141F7031997-06-24024 June 1997 Insp Repts 50-424/97-05 & 50-425/97-05 on 970427-0531. Violations Noted.Major Areas Inspected:Operations,Maint, Engineering & Plant Support Re Scenario for off-hour Emergency Response Drill ML20140B4071997-05-21021 May 1997 Insp Repts 50-424/97-04 & 50-425/97-04 on 970316-0426. Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant Support & Emergency Preparedness Area ML20140B3951997-05-21021 May 1997 Notice of Violation from Insp on 970316-0426.Violation Noted:Between 970329 & 0404,numerous Examples of Unattended & Unevaluated Debris Have Been Identified & Eight EPIP Revs Had Not Been Distributed ML20138J4161997-04-25025 April 1997 Notice of Violation from Insp on 970210-0307.Violation Noted:Licensee Offered for Transportation by exclusive-use, Closed Transport Vehicle,Package Which Arrived Having Max Surface Radiation Levels Exceeding 10 Msv/Hr ML20137X3751997-04-14014 April 1997 Notice of Violation from Insp on 970202-0315.Violation Noted:Positions of Valves 2-1302-U4-180 - 185 Not Verified Every 31 Days as Required ML20137X3811997-04-14014 April 1997 Integrated Insp Repts 50-424/97-01 & 50-425/97-01 on 970202- 0315.Violations Noted.Major Areas Inspected:Operations, Maint,Engineering & Plant Support 1999-08-16
[Table view] |
See also: IR 05000424/1986045
Text
, ., . - -
c
, ' p Krig UNITED STATES
/j Do
"
NUCLEAR REGULATORY COMMisslON <
[ g REGION 11
g
j 101 MARIETTA STREET, N.W.
g ATLANTA, GEORGI A 30323
'+4 . . . . . $
Report Nos.: 50-424/86-45 and 50-425/86-22
Licensee: Georgia Power Company
P. O. Box 4545
Atlanta, GA 30302
Docket Nos.: 50-424 and 50-425 License Nos.: CPPR-108 and CPPR-109
Facility Name: Vogtle Units 1 and 2
Inspection Conducted: May 19-23, 1986
Inspector: (r hdher.4 6 b7!f4
T. D. Gib~ bons Date Signed
Accompanying Person 1: D C. Ford
Approved by: . .
T. E. Conlon, Section M4eV
&
[- 22- [d
Date Signed
Engineering Branch
Division of Reactor Safety
SUMMARY
Scope: This routine, unannounced inspection involved the areas of licensee
ider.tified items, instrumentation components and systems.
I
Results: One violation was identified - Failure to accomplish the corrective
action prescribed in deviation report PP-12074.
I
!
l
.
)
'
8607180251
DR 860707
ADOCK 05000424
PDH ,
i
!
1
.
,
REPORT DETAILS
1. Persons Contacted
Licensee Employees
- P. D. Rice, Vice President - Engir.eering
- E. D. Groover, QA Site Manager
- G. A. McCarley, Project Compliance Supervisor
- D. H. Day, Instrumentation and Controls Section Supervisor
- B. C. Harbin, Manager Quality Control
'
- D. O. Foster, Vice President Project Support
Other Organizations
- R. Urick, Controls Engineer, Bechtel Power Corporation (BPC)
- D. W. Strohman, Project QA Engineer BPC
- S. Pietroyk, Assistant Project Engineer BPC
D. Scheyer, Engineering Group Supervisor BPC
NRC Resident Inspector
- R. J. Schepens, Resident Inspector
2. Exit Interview
The inspection scope and findings were sumarized on May 23, 1986, with
those persons indicated in paragraph 1 above. The inspector described the
areas inspected and discussed in detail the inspection findings listed -
'
below. No dissenting comments were received from the licensee,
a. Violation 424/86-45-01, Failure to accomplish the corrective actions
prescribed in Deviation Report PP-12074, paragraph 5.
b. Unresolved Item 424/86-45-01, Separation of tubing originating from a
common component pipe tap, paragraph 5.
c. Inspector Followup Item 424/86-45-03, Qualified replacement for pres-
sure transmitters IPT-0934, IPT-0935, IPT-0936, and IPT-0937, paragraph
5.
- The licensee did not identHy as proprietary any of the materials provided
to or reviewed by the inspector during this inspection.
1
. .- - = . - - . . -. -
4
.
2
.
3. Licensee Action on Previous Enforcement Matters
(Closed) Unresolved Item 424/86-14-01, Review the Retrievability of QA
Records for Installation of Equipment Released for Startup Testing.
"
The inspector examined the records for emergency diesel generator control
'
panels 1-2403-PS-DG3'and 1-2403-P5-DG4. The licensee produced the receiving
-
inspections, installation inspection, and the tubing installation on panel
1-2403-P5-DG4. The inspector has no further questions.
4 4. Unresolved Items
- Unresolved items are matters about which more information is ' required to
,
determine whether they are acceptable or may involve violations or devia-
'
tions. One unresolved item was identified during this inspection and is
discussed in paragraph 5.
5. Instrumentation Components And Systems - Work Observation (52053)
1
1 The inspector selected the following systems, process variables and compo-
nents for examination:
4
j Engineering Safety Features Actuation System (ESFAS)
I
- Variable Devices
i
Primary Containment Pressure Pressure Transmitter IPT-0934
- Pressure Transmitter IPT-0937
1 Pressure Indicator 1PT-0934
Pressure Indicator IPT-0937
- Pressure Transmitter 2PT-0937
- Pressure Transmitter 2PT-0936
1
ReactorProtectionSystem(RPS)
l
l
'
Pressurizer High Pressure Trip Pressure Transmitter IPT-0457
Pressure Transmitter IPT-0458
- Pressure Indicator IPI-0457
1 Pressure Indicator IPI-0457a
l Pressure Indicator IPI-0458
<
Level Transmitter ILT-0461 '
! Level Transmitter ILT-0462
'
Safety-Related Display Instrument (SRDI)
!
! Reactor Coolant Pressure Pressure Transmitter IPT-0403
Pressure Indicator
4
IPI-0403
Pressure Indicator IPI-0403a
Flow Transmitter 1FT-0414
Flow Transmitter 1FT-0415
j . Flow Transmitter 1FT-0416
i
.. - , -- -- ., -- - - . . . - , - - . - - - -
.. . _ _
-
.
> 3
The following documents provided the basic acceptance criteria for this
inspection:
a. General Documents
4
Bechtel Power Corporation, Plant Design and Instrumentation Construc-
tion Specification, X4AZ01, " Instrumentation - Installation of Instru-
i ment Piping, Tubing and Instrument Hook-up, " Revision 14, April 10,
1986.
Georgia Power Company, Generating Plant Construction Procedure,
GD-T-22, " Installation of Instrumentation," Revision 2, April 25,1985.
Pullman Power Products, Vogtle Project Procedure, X-26, " Instrument
System Closeout and Final Inspection," Revision 6/20/84.
l Pullman Power Products, Vogtle Project Procedure, IX-40, "Instrumenta-
tion Installation Inspection and Testing" Revision 9/9/85
- b. System Dccuments
ESFAS - (Primary Containment Pressure)
Bechtel Drawing - IX4DB131, Revision 14
Bechtel Drawing - 1X5DS3D01, Revision 8
j Bechtel Drawing - IX5DS3D02, Revision 11
'
Bechtel Drawing - IX5DS4004, Revision 6
Bechtel Drawing - IX5DS4A07, Revision 14
Bechtel Drawing - 1X50Y00937B, Revision 0
Bechtel Drawing - 1X50Y009348, Revision 0
Westinghouse - 7244D42, Revision 6
,
Bechtel Drawing - CX5DF3002, Revision 3
RPS - (PressurizerHighPressureTrip)
i Bechtel Drawing - IX4DB112, Revision 19
Bechtel Drawing - IX50Y00457A, Revision 1
Bechtel Drawing - 1X5DY00a57B, Revision 1
Bechtel Drawing - IX50Y00458A, Revision 1
- Bechtel Drawing - IX5DY00461A, Revision 1
Bechtel Drawing - 1X5DY00462A, Revision 1
Bechtel Drawing - CX5DP6009, Revision 4
'
SRDI - (ReactorCoolantPressure)
- Bechtel Drawing - 1X4DB111, Revision 14
Bechtel Drawing - IX5DY00404A, Revision 2
Bechtel Drawing - 1X5DY00403B, Revision 0
i
.-w w -. - is, w w
- - . - ~ -.. - -- - - . .-
-
- .
'
4
!
?
4
Bechtel Drawing - 1X5DY00414A, Revision 1
Bechtel Drawing - IX50Y004148 Revision 0
,
Bechtel Drawing - IX5DY00415A, Revision 1
, Bechtel Drawing - 1X5DY00415B, Revision 0
i Bechtel Drawing --1X5DY00416A, Revision 1
i Bechtel Drawing - 1X50Y00416B, Revision 0
i Bechtel Drawing - IX4DL4A17, Revision 18 '
Bechtel Drawing - CX5DP1013, Revision 0
Components which comprise portions of the Engineered Safety Features
i Actuation System, and which monitor primary containment pressure, were
- examined to determine whether receiving inspection activities had been
i controlled and accomplished in- accordance with approved procedures. ,
The inspector verified that component attributes such as identifica-
, tion, physical condition, and associated quality documentation were as
! specified by procedural requirements. For the systems listed above,
the inspector verified that Unit 1 components had been installed in the
, plant and stored in place pending plant startup. Additionally, the
- Unit 2 pressure transmitters listed were examined to determine whether
the proper storage activities had been accomplished. . The warehouse
- storage level, component identification, storage environment, and ,
j associated licensee inspection activities were determined by the
inspector to be in accordance with applicable requirements. With
'
'
i regard to the installation of instrumentation components, the inspector
i
verified that the ' proper procedures and drawings had been used for
installation, that specified materials were used, and that the compo-
l nents were properly located and mounted. Component identification was
- clear and in accordance with approved design documents,
li
! During the examination of components which monitor reactor coolant
i pressure, the inspector identified a deficiency 'in the routing of '
l instrument sensing lines from the flow elements in the reactor coolant
- leg (loop 1) to associated flow transmitters. Design documents indi-
cate that sensing lines should be installed from valve 1-1201-X4048 to
flow transmitter 1-FT-416, and from valve 1-1201-X4050 to flow trans-
! mitter 1-FT-414. However, the as-installed configuration of these
components exhibits a deficiency in that the sensing lines from these
i
valves are routed to the opposite flow transmitter. 'This issue was
<
discussed with . licensee personnel who subsequently produced Deviation
- Report (DR) PP-12074 - dated Octobe" 19, 1985. .This DR details the
- subject deviation and provides a "use-as-is" disposition with instruc-
{ tions to revise the Isometric drawing and other installation documen-
j tation to reflect the as lastalled configuration. 'In reviewing the DR
l
'
the inspector noted a " Work Complete" and "QC Acceptance" sign off as
of October 23, 1985. However, a review of the applicable Instrumenta-
tioh Isometric and Piping and Instrumentation Drawing (P&ID) disclosed
that these documents have not been revised to reflect the as-installed ;
j. configuration. This is a violation identified as 424/86-45-01, Failure 1
- to accomplish the corrective - actions prescribed in Deviation Report
- PP-12074.
!
4
'___ _ __. . _ . _ _ _ _ _ . ___ _ _ _ _ _ . _
- - . . - - - .
1
-
.
'
5
i
.
! The inspector identified several plant locations in which redundant
!
instrument sensing lines had been routed. from a common pipe tap. ,
'
Examples include, a) the high pressure side of the reactor coolant
loop legs, where a single tube is routed from a common tap for approxi-
-
mately 15 feet and then split for routing to individual flow transmit-
ters, b) the high pressure tap to the pressurizer vessel where a single
tube is routed from a common tap for approximately 200 feet before <
-
splitting to individual pressure transmitters. The inspector expressed
concern regarding the adequacy of these installations as they relate to
-Regulatory Guide 1.75 requirements and " Single Failure" criteria.
-
This issue and the application of project design criteria was discussed
1 with licensee personnel and will be considered an unresolved item
t pending further evaluation and analysis by the licensee. This Unre-
solved Item is identified as 424/86-45-02, Separation of tubing
originating from a common component pipe tap.
,
, The examination of components which monitor primary containment pres-
j sure disclosed that the licensee had previously identified a deficiency
-
in the area of environmental qualification for several pressure trans-
. mitters used in this system. This deficiency was the result of a
! determination that pre-manufactured capillary tubing provided with the
! instruments was not of sufficient length to allow for installation of'
j originally designed barriers. Consequently, relative to temperature
i effects for pressure transmitters IPT-0935 and 1PT-0937, and radio-
!
logical effects for pressure transmitters 1PT-0934 and 1PT-0936 the
) installed instruments would not be qualified for use. Discussions with
licensee personnel indicated that qualified replacement instruments ,
l have been ordered and will be installed prior to full loading. This
j issue is considered an inspector followup item pending further licensee
- action. This Inspector Followup Item is identified as 424/86-45-03,
4
'
" Qualified Replacements for pressure transmitters IPT-0934,1PT-0935,
IPT-0936 and 1PT-0937.
i
j 6. Licensee Identified Items
, a. (Closed) Item 424/CDR 82-36, DeLaval Diesel Generator - Piston Skirt
Cracking (10 CFR 50.55(e)).
- The final report was submitted on June 11, 1984. The report has been
- reviewed and determined to be acceptable. The inspector held discus-
4
sions with responsible licensee representatives and reviewed supporting
documentation to verify that the corrective actions identified in the
report have been completed. The licensee has replaced all of the type
AN piston skirts with the new type AE piston skirts. The work was-
documes.ted on Vogtle Electric Generating Plant (VEGP) work orders (WO)
- Engine serial number 76021 was documented on WO 1-84-00937 and serial
number 76022 was documented on WO 1-84-00916
1
,
-
i
_ _ , _ . __ ____ _ _ .. . . _. _
. - - . .. - - . .- .- . - - . - - . - . . . . --- .. -
Y
, .
.
4
6
>
4
- b. (Closed) Item 424/CDR 85-77, Transamerica DeLaval (TDI) Diesel Genera-
{ tor - Crankshaft 011 Plugs (10 CFR 50.55(e))
i The final report was submitted on May 23, 1985. The report has been
'} reviewed and determined to be acceptable. The inspector held discus- j
sions with responsible licensee representatives and reviewed supporting I
4 documentation to verify that the corrective actions identified in the ;
- report have been completed. TDI identified that all 22 gauge oil plugs
were to be replaced with 16 gauge plugs. TDI identified that the 22
1 gauge plugs were only used between March 3,1980 and June 22, 1982.
l The licensee replaced the plugs on both emergency diesel generators i
documenting the replacements on Work Orders 1-85-0829 and 1-85-04384. !
. The liquid penetrate testing of the installed plugs is documented on
I work orders 1-85-0930, 1-85-04423. :
a
'
c. (Closed) Item 424/CDR 85-80, Diesel Generator Control Panel Overhearing i
, (10CFR50.55(e)).
i The final report was submitted on August 23, 1985. The report has been
reviewed and determined to be acceptable. The inspector held discus-
j sions with responsible-licensee representatives and reviewed supporting
4 documentation to verify that the corrective action identified in the
i report has been completed. TDI informed the licensee that additional
I cooling was needed in the electrical control panels. The licensee
4
issued design change notice (DCN) 13 to drawing IX4DI5103 which modi-
i fied the heating and ventilation ducts to add a duct which increased
'
the air flow to the panel. This work is documented on Maintenance W0s-
} 1-85-11954 and 1-85-11399.
4
d. (Closed) Item 424/CDR 83-49 TDI - Class IE Electrical Cables (10 !
CFR50.55(e)).
i
i- The final report was submitted on November 3,1983. The report has
{ been reviewed and determined to be acceptable. The inspector held
{- discussions with responsible licensee representatives and reviewed
] supporting documentation to verify that the corrective actions identi-
- - fled in the report have been completed,
j TDI informed the licensee that several cables on the diesel generator
, were not qualified for their service. The cables were used to connect
j the tachometer to the input of the Woodward governor. The licensee
! replaced the cables using the instructions in TDI Service Information
2 Memo 361 dated October 21, 1982. This work is. documented in mainte-
i nance WO 1-85-07980 which was closed on December 9, 1985.
! e. (Closed) Item 424/CDR 84-71 Cable Separation Discrepancies (10
j CFR50.55(e)).
.
l The final report was submitted on May 31, 1985. The report.has been
reviewed and determined to be acceptable. The inspector held discus-
i sions with responsible contractor representatives and reviewed
i
l i
. - -,, .- -- - . . - - . - - , , . - _ - , - - - - , . .. . . .
-
.
7
supporting documentation to verify that the corrective actions identi-
fled in the report have been completed.
The licensee has corrected the cable separation deficiencies identified
in audit findings reports (AFR) 004 and 686. As a result of the AFRs
further inspections were conducted and the following deviation reports
were issued, 5814, 5885, 5886, 5887, 5888, 5890, 7581 and 7582. The
deviation reports were dispositioned, the necessary corrective actions
completed and accepted by QC. All terminations electricians and
inspections were retrained on the separation criteria. The separation
criteria was emphasized in all applicable procedures.
f. (Closed) Item 424/CDR 83-50 and 425 CDR 83-50, Strut Channel Installa-
tionDiscrepancies(10CFR50.55(e))
The final report was submitted on July 20, 1984. The report has been
reviewed and detemined to be acceptable. The inspector held discus-
sions with responsible licensee representatives and reviewed supporting
documentation to verify that the corrective action identified in the
report has been completed. The inspector examined the evaluation by
Bechtel which included testing by the four strut manufactures and
stress analysis of the data found during the analysis of 301 supports.
On the bases of the above evaluation the licensee no longer considers '
this item reportable. The inspector concurs with the licensee's
evaluation.
g. (Closed) Item 424/CDR 84-74 and 425/CDR 84-74, Undetectable Failure,
Westinghouse ESFAS (10 CFR 50.55(e)).
The final report submitted on April 25, 1985. The report has been
reviewed and determined to be acceptable. The inspector held discus-
sions with responsible licensee representatives and reviewed supporting
documentation to verify that the corrective action identified in the
report has been completed. Westinghouse notified the NRC and the
licensee of a concern relating to an undetectable failure relating to
the P4 permissive. When the breaker is open (Reactor tripped) the P4
permissive permits the operator to block actuation of safety injection
and to enter the recirculation mode.
The original Westinghouse testing procedure required use of jumpers and
portable test equipment. Westinghcuse offered an optional modification
which mounted a meter and a switch to allow testing without entering
the cabinets. This modification was installed at Vogtle by Westing-
house field representatives in accordance with Field Change Notice
(FCN) GAEM-10592. During an evaluation of the optional modification,
Westinghouse identified a possible undetectable failure might remain.
Westinghcuse deleted FCN GAEM 10592 and issued a new FCN GAEM 10636
which corrects the circuitry. The new field change will be installed
in the near future. The licensee has issued procedure 54715-1, dated
i
1
l
'
.. .-
8
April 2,1986, Reactor Trip System P4 Interlock Test, which will be
used to perform the test every eighteen months as required by the
Technical Specification.
.
l
h. (Closed) Item 424/CDR 82-29 and 425/CDR-82-29, Electrical Raceway
'
Hangers and Supports (10 CFR 50.55(e)).
The final report was submitted on September 5,1985. The report has
been eviewed and determined to be acceptable. The inspector held
discussions with responsible licensee representatives and reviewed
supporting documentation. The licensee verified the structural integ-
rity of the electrical raceway hangers and supports by testing hanger
TS-140-66 to destruction. The results of the test indicated the
adequacy of the design. The inspector examined 17 deviation DRs which
documented various hanger or support problems. Each of the DRs was
dispositioned with a calculation that verified the structural integrity
l of the support. The licensee has evaluated the above and no longer
l considers this item reportable. The inspector concurs with the licens-
ee's evaluation.
L
, i. (Closed) Item 424/CDR 82-29 and 425/CDR 82-29, Starting Air Valves -
!
Diesel Generators (10 CFR 50.55(e)).
l The final report was submitted on August 6, 1982. The report has been
! reviewed and determined to be acceptable. The inspector held discus-
'
sions with responsible licensee representatives and reviewed supporting
documentation to verify that the corrective actions identified in the
l report have been completed. TDI has issued Service Memo 360 which
l identifies that the 3 inch studs on the starting valves may bottom out
without sufficiently compressing the gasket. TDI recomended using
2-3/4 inch bolts which will not bottom out. The 32 studs were re-
placed, a new copper gasket installed and all studs torqued to 150 ft
pounds.
j. (Closed) Item 424/CDR 82-33, TDI Generator Drive Coupling (10
CFR50.55(e)).
Tne final report was submitted on December 14, 1986. The report has
l been reviewed and determined to be acceptable. The inspector held
i
discussions with responsible licensee representatives and reviewed
supporting documentation to verify that the corrective actions identi-
fled in the report have been completed. TDI informed the licensee that
the generator drive coupling should be replaced. The licensee replaced
the couplings and documented the replacement on Maintenance WO
1-84-01223 for generator A and 1-84-01218 for generator B.
i
4
, _ .