ML20206K496

From kanterella
Revision as of 22:41, 28 December 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Temporary Exemption from 10CFR50.54(w)(5)(i) Schedular Requirements of Property Insurance Rule Re Insurance Policies That Prioritize Insurance Proceeds for Stabilization & Decontamination After Accident
ML20206K496
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 11/18/1988
From: Erickson P
Office of Nuclear Reactor Regulation
To: Taylor J
DAIRYLAND POWER COOPERATIVE
Shared Package
ML20206K500 List:
References
NUDOCS 8811290429
Download: ML20206K496 (4)


Text

_ - _ _ _ _ _ _ _ _ _ _ _ _ .

.i '.' .

, # 'e "g UNITED STATES

!' NUCl. EAR REGULATORY COMMISSION f,  ; wAsMGTON, D, C. 20666

\ . .. .. [f Docket No. 50-409 November 18, 1988 Mr. .!ames W. Taylor Genera! Manager

  • v % nd Power Cooperative h East Avenue South La Crosse, Wiscensin 54602-0817

Dear Hr. Yaylor:

SUBJECT:

LACROSSEBOILINGWATERREACTOR(LACBWR)-TEMPCRARYEXEMPTIONFROH THE SCHEDULAR PAQUIREMENTS OF THE PROPERTY INSURANCE RULE EFFECTIVE ,

OCTOBER 4,1988(10CFR50.54(w)(5)(i)) '

The Coer11ssion has issued the enclosed temparary ezemption from the schedular requirements of the property insurance rule effective October 4 1988 (10 CFR 50.54(w)(5)(1)) for the La Crosse Boiling Water Reactor (LACBWR}. This part of the rule requirts Itcensees to obtain insurance policies that prioritize insurance proceeds for stabilization and decontamination after an accident and provide for payment of proceeds to an independent trustee who would disburse ft. ads for decontamination and cleanup before ahy other purpose.

The Cormission has the irplementation proposed schedule a revision for 18 months (53 of FR10 CFRSeptember 36338, 50.54(w".19, l(i) 1988 extending ).

H0 wever, since this rulemaking action was not completed by October 4,1988, the Comission is issuing a temporary exemption from th requirements of 10 CFR 50.54(w)(5)(1) until completion of the pending rulemaking extending the implementation date specified in 10 CFR 50.54(w)(5)(1) but not later than April 1, 1989. Upor. completion of such ruler.aking, the licensee shall comply with the provisions of such rule.

TheCommission,pursuantto10CFR50.12(a),herebygrantsatemperaty exemption from tie schedular requirements of 10 CFR 50.54(m)(5)(1). This temporary exemption is valid until April 1,198f or until such time as action on this rulemaking is completed.

In granting the exemption, the staff has detennined that this action is authorized by law ard will not endanger life or property or the comen defenu and security and is otherwise in the public interest.

g D

  • 08J1J9 g CK 05000409 PNu

. ~i Mr. James W. Taylor '

November 18, 1988 A copy of this exemption is being filed with the Office of the Federal Register for publication. ,

sincerely, i

original signed by Peter B. Erickson, Project Manager .

y Standart"zaticn and Non-Power Reactor Project Director'te Division of Reactor Projec.s - III, IV, Y and Special Projects Office of Nuclear Reactor Regulation i

l i

Enclosure:

As stated cc w/ enclosure: l See next page l $ r i NRC & l'ocaT PDRs -

I EHylton l

PErickson  ;

I OGC-Rockirille i 1 Gholaban  !

TMurley/J$ntezek  !

l DCrutchfield  :

. CRossi }

l EJordan BGrimes

! TBarnhart

ACRS (10) (4) i GPA/PA i

ARM /LFM8 i Lkubenstein i t / .

/ u PDSM' PDSNP /b PD P OGCRdhVI DR4 i^ ( P j.

Elef] ton PEric n:cw CMiller ,5

  • I Fube(nsteinGHolahan L l 10/p]/88 10/p/88 1)///PS 1,0/. 5/88' Ip/8/88 N/;(/88 i'  !

I

, c I

t h

! i I

i

- _ .--_-_.. .-. ,-- _._ _ __ . _ - . _ , . _ , _ . _ . - , _ _ _ _ - _ _ ~ _ _ _ - _ . ~ _ _ _ _

P.r. Jar.es L'. Taylor tioverr.ber 18, 1988

' A copy of this exemption is being filed with the Office of the Federal Register for publication.  :

$1ncerely, ub- W Peter B. Erickson, Project Manager Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects - !!!, IV, Y and Special Projects Office of Nuclear Reactor Regulation ,

Enclosure:

As stated cc w/ enclosure:

See next page t

5 t

i i

i f I I

I i

i t

i r

.- '~--* ' -

...,..n .. . .

l.. . Jams. V. Tayle Docket No. 50-409 Dairyland Power Cooperative La Crosse Boiling Water Reactor cc:

Fritz Schubert Esquire Staff Attorney Dairyland Power Cooperative ,

2615 East Avenue South La Crosse, Wisconsin 54602 Mr. Kevin P. Gallen Newman & Holtringer, P. C.

1615 L Strtet. NW Washington, D.C. 20036 Mr. John Parkyn, Plant Manager La Crosse Boiling Water Reactor i

Dairyland Power Cooperative P. D. Box 275 Genoa, Wisconsin 54632 U.S. Nuclear Regulatory Commission Resident Inspectors Office Rural Route #1, Box 276 Genoa, Wisconsin '4632 Town Chairman Town of Genoa Route 1 Genoa, Wisconsin 54632 Chairman, Public Service Commission of Uisconsin Hill Farna State Office Building P. D. Aox 7854 Madison, Wisconsin 53707 g "i

Regional Administrator, Region I!!

U.S. Nuclear Regulatory Commissien 799 Roosevelt Road Glen Ellyn, Illinois 60137 I

?

.