ML20237J404

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Rept 50-409/87-10 on 870718-0821.No Violations Noted
ML20237J404
Person / Time
Site: La Crosse File:Dairyland Power Cooperative icon.png
Issue date: 08/28/1987
From: Guldemond W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Taylor J
DAIRYLAND POWER COOPERATIVE
Shared Package
ML20237J407 List:
References
NUDOCS 8709030582
Download: ML20237J404 (2)


See also: IR 05000409/1987010

Text

bm6

.

.

AUG 2 81987

Docket No. 50-409

Dairyland Power Cooperative

ATTN:

Mr. J. W. Taylor

General Manager

2615 East Avenue - South

La Crosse, WI 54601

Gentlemen:

This refers to the routine safety inspection conducted by Mr. K. R. Ridgway of

this office from July 18, 1987 through August 21, 1987, of activities at the

La Crosse Boiling Water Reactor authorized by NRC Operating License No. DPR-45

and to the discussion of our findings with Messrs. J. Parkyn and G. Boyd and

other members of your staff during the course of the inspections.

The enclosed copy of our inspection report identifies areas examined during the

inspection.

Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter and the enclosed inspection report will be placed in the NRC Public

Document Room.

We will gladly discuss any question you have concerning this inspection.

Sincerely,

Original Signed by I. N. Jackiw

W. G. Guldemond, Chief

Reactor Projects Branch 2

Encicsure: Inspection Report

No. 50-409/87010(DRP)

See Attached Distribution

RIII

RIII

/b

Gul mo

_

~

8709030582 870828

\\{g

ADOCK0500g9

PDR

G

T E ol

_ _____ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

_ _ _ _ _ _

_-

_

l

h

.

.

Dairyland Power Cooperative

2 AUS 2 8 igg 7

Distribution

cc w/ enclosure:

J. Parkyn, Plant Superintendent

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Peter B. Erickson, LPM /NRR

Virgil Kanable, Chief

Boiler Section

Charles Thompson, Chairman

Wisconsin Public Service

Commission

Spark Burmaster, Coulee

Region Energy Coalition

R. I. Braund (SLO),

WI Div. of Emergency Government

Lawrence J. McDonnell, Chiof

Radiation Protection Section

WI Department of Health and

Social Services, Division

of Health

U. S. NUCLEAR REGULATORY COMMISSION

REGION III

Report No. 50-409/87010(DRP)

Docket No. 50-409

License No. DPR-45

Licensee:

Dairyland Power Cooperative

2615 East Avenue - South

La Crosse, WI 54601

'

-

Facility Name:

La Crosse Boiling Water Reactor

Inspection At:

La Crosse Site, Genoa, Wisconsin

Inspection Conducted:

July 18, 1987 through August 21, 1987

/[KIR

fd. iy

[8O

Inspector:

/

Date

I . N.

k

hi f

['M~ 87

Approved By:

Reactor Pro}jects Section 2C

Date

f

Inspection Summary

Inspection from July 18, 1987 through August 21, 1987 (Report

No. 50-409/87010(DRPP))

Areas Inspected:

Routine, unannounced inspection by the resident inspector

of Licensee Actions on Previous Inspection Findings:

Operational Safety

Verification; Monthly Maintenance Observation; Monthly Surveillance

Observation; Licensee Event Reports Followup; Design Changes and Modifications;

Review and Audits; and Organization and Administration.

Results:

No violations were identified.

.

8709030597 870828

PDR

ADDCK 05000409

G

PDR

.__ - ______

1

Persons Co tact

DETAILS

n

  • J.

Parkyn, Pl

ed

  • G.

Boyd, Operant

L. NelsL. Kelley, As ist

ations SupervisorSuperintendent

s

  • R.

Wery,on, Health and SL. Goodman,uality Assu

ant

to Operations S

Q

afety Supervisorupervisor

Oper tio

The inspector

ce Supervisor

a

s

ns Engineer

of

\\

the inspectionalso interviewed

  • Denotes thos

other licens

,

2

e

Gener l

attending exit int

ee personnel

a

On April

erviews during th

during the

the permanen,t

24

course

1987, the Dairyl

e inspection peri

defueled and st

shutdow

the primary cool

and Power Cooper ti

n of

or d with

LACBWR

od.

made thr

e

due to

the

ough some tanksant system filled spray bundeconomic

a

core

v

On

e (DPC) Board auth

No. August

r

1987

and equipmentwith water.le end v

easons.

DPR

4

possess 45 c,hangin,g itthe Commission i

essel

The

orized

to

r duce Water flushes

lid in placereactor is

\\

was

e

submittedon ly.

h

to On Junefromoperating licensssued Amendmentr

a

pressure primary

ar

an

e bei

and

19, 1987

for

r

r tes.ng

system piping andemove Inservice ,I

nuclear instrument

a

to

an

No. 56

agree

nspectionapplication fora license toto License

e to

with

operated.

the possessio , and

ation

equipment, to delrequirements fora licens

to

Other

n

make Technical

ete the

highamendment

e

only license that

Licensee Actionamendment applicati

3

Specification h

reactor

requirements

the

ons

In light of

on Pr

are to be

c

evious Ins

will not beanges

to determinethe facility sh

ection Findinsubmitted in the

reviewed

following open iwhether they shoul

near future.

d be whetherutdow

s

n, open

additional

administratively

or

tems

a.

inspectiounresolved items h

409

are

for /84008-08:

administr tively

closed.

TMI

n

a

Based on theeffort is justifiave been

Open Item

Use

Item F.1.2.B.2 F

b:

closed:

409/85005-02:

Calibration Open Item Submieedw ter Pumpsof D

eview, ed or

r

and

a

the

c.

ielding Calcul

of

409/85017-03:Channel7

ttal

Include Actuati Open Item

Revi

to NRR about D

ation

on Time

eviation From SA9

sion of

Valve Stroke Ti

ming Methodto

2